PROJECT GENERAL NOTES 16.
<br /> PASS CARDS
<br /> PROJECT SCOPE AND RFP
<br /> VERIZON SHALL ISSUE PASS CARDS TO THE CONTRACTOR'S CARDS @I.BE AT THE BEGINNING OF EACH 30. OWNER-FU EQUIPMENT V��
<br /> WORK DAY WHEN INSIDE ACCESS IS REQUIRED.THE PASS SHALL BE RETURNED TO THE VERZON MAJOR EQUIPMENT IDENTIFIED IN THE CONSTRUCTION DRAWINGS FOR THIS PROJECT WILL BE FURNISHED
<br /> 1. Tel:FOLLOWNG GENERAL NOTES ARE INTENDED TO SUMMARIZE REQUIREMENTS OF THE PROJECT- REPRESENTATIVE AT THE END OF EACH WORK DAY.TT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO BY VERIZON FOR STORAGE AND INSTAL ATION BY THE CONTRACTOR.THE CONTRACTOR SHALL COORDINATE THE PROJECT SCOPE CF WORK THAT THE CONTRACTOR SHALL BE RESPONSIBLE FOR IS CEONED BY RFP NO:
<br /> REFER TO THE SPECIFlCAATKNS FOR ADDITIONAL REQUIREMENTS AND DETAILS. MAINTAIN CONTROL OF THESE CARDS DURING THE DAY.THE CONTRACTOR SHALL BE PREPARED TO WITH THE VERIZON REPRESENTATIVE TO ARRANGE A TIMELY DELIVERY OF ALL OWNER-FURNISHED REQUEST FOR PROPOSAL FOR THIS DRAWING WAS PREPARED SOLELY FOR THE USE
<br /> 2. MINOS&SPECIFICATIONS: OFEQUIPMENT.BASED ON THE CONSTRUCTION TIMELINE,THE CONTRACTOR SHALL PROVIDE A TYPEWRITTEN
<br /> NAMES, AT ANY THE A LISTINGB S,M PEOPLE WHOA ARE B POSSESSIONIE OF THESE CARDS, ASS CR LIST TO TIE VERIZON REPRESENTATIVE INDICATING ALL REQUIRED OWNER-FURNISHED EWPMENT AND '�INCLUDES THE FOLLOWING ATTACHMENTS: VOFE VON WI CURSSEEM AND MUST ONLY CE USED BY
<br /> NAPES,SOCAL SECURITY NUMBERS,AND THE CARD NUMBER IN THEIR POSSESSION.ANY PASS GIRDSVERZON WIRELESS EMPLOYEES,CONTRACTORS,MN
<br /> A THE DRAWS,SPECIFICATIONS,REFERENCED STANOJmS,VERIZON WIRELESS STANDARDS,OTHER NOT RETURNED DAILY WILL BE DEACTIVATED,AND THEIR USE WILL RESULT II A SECURITY STSILM ALARM. DELIVERY DATE REQUIRED TO CONFORM WITH THE CRITICAL PATH SCHEDULE.VERIZON WILL CONTACT ATTACHMENT A M/W/DV BE QUESTIONNAIRE. VENDORS WHILE PERFORMERS THE WORK SHOWN CN
<br /> THEIR VENDORS MID RESPOND TO THE CONTRACTOR UST.OWNER-FURNISHED EQUIPMENT WILL BE
<br /> ` THE BENT ATTACHMENTSCAND THE TERMS AND R WINGS,S ARE CATIONS.REFERENCED
<br /> OF ONE ANOTHER. IN THE CONTRACTOR WILL CHARGED=100 FOR EVERY UNPoETIARNED CARD. ATTACHMENT C PROPOSED A L.COST THISR DRAWING.ANY OTHER USE OF THIS DRAWERS IS
<br /> THE EVENT OF CONFLICT BETWEEN THE DRAWINGS,SPEOFlCATIONS,REFERENCED STANDARDS, DELIVERED TO THE FACILITY LOADING DOCK UNLESS OTHER ARRANGEMENTS HAVE BEEN MADE THE ATTACHMENT C BD PROPOSAL.COST BREAKDOWN. FORBIDDEN.
<br /> CONTRACTOR,IN COORDINATION WITH THE VERIZON REPRESENTATIVE,SHALL INSPECT EACH EQUIPMENT
<br /> VERIZON WIRELESS STANDARDS,OTHER RFP ATTACHMENTS OR TERMS AND COIm(TIONS,THE 17. UNDERGROUND RIPS ATTACHMENT D PROJECT MANUAL(CONSTRUCTION DRAWINGS).
<br /> DELIVERY FOR ACCURACY AND SHIPMENT T.•M••C. THE CONTRACTOR IS TEEN ACCEPTING THE EQUIPMENT,
<br /> ARCHTE /ENGINEER SHALL BE CONTACTED FOR FORMAL INTERPRETATION OF THE UNDERGROUND UTILITY LOCATE SERVICES SHALL BE REQUESTED AND COMPLETED DISTURBANCE AND IT SHALL BE THEIR RESPONSBIl11Y TO HANDLE.STORE,PROTECT,AND ULTIMATELY INSTALL THE ATTACHMENT E OTHER RELATED BE DOCUMENTS'
<br /> REQUIREMENT.TIE CONTRACTOR SHALL!E DEEMED TO RAVE FRONDED THE DETAILEDWITHAND OF ANY EXISTING GRADE OR ON-GRADE CONSTRUCTION,SLAB DETHAT ION,OR OTHER ACTIVITIES THAT ATTACHMENT F VENDON Nt111U1 I STANDARDS II
<br /> �I
<br /> EQUIPMENT.ALL DELIVERED EQUIPMENT SHALL BE REMOVED FROM THE LOADING DOCG ON THE DAY IT S
<br /> EXPENSIVE NTERPRETATIQN OF THE REQUIREMENT.ANY WORK INSTALLED N CONFLICT WITH THE MAY IMPACT BORED MLDIES.THE CONTRACTOR SHALL CONFIRM THAT INUIT LOCATE SERVICES RAVE PROJECT ADDENDIMS AND CLARIFICATIONS.
<br /> ARCHITECT/ENGINEER INTERPRETATION SHALL BE CORRECTED BY THE CONTRACTOR AT HIS BEEN COMPLETED BEFORE COSTING GRADE IS EXCAVATED OR EXISTING FLOORING IS DEMOLISHED, RECERED. ,UZON WILL NOT BE PROVIDING STORAGE SPACE WITHIN NE FACILITY FOR USE BY THE
<br /> EXPENSE AND AT NO EXPENSE TO OWNER. PUBLICLYLED,OR CUT,AND MAILESS OF TIE LOCATION ON THE PROPERTY.SOME UTILITIES MAY NOT BE C01ONTRACTOR,UNLESS PRIOR ARRANGEMENTS ARE MADE AND APPROVED IN WRITING.REFER TO SHEET
<br /> OWNED MAINTAINED,THEREFORE IT WILL BE NECESSARY FOR THE CONTRACTOR TO THE REP ANTI T ASSOCIATED ATTADNENTS AND DOCUMENTS SHALT DEFINE THE COMPLETE PROJECT SCOPE MORRISON HERSHFIELD
<br /> B. THE INTENT OF THE DRAWINGS IS TO SHOW GENERAL SCOPE AND INTENT OF THE WORK. WORK.CONTRACTOR SHALL BE RESPONSIBLE FOR CCMPU ICE WITH ALL DOCUMENTS AND IS SOLELY RESPONSIBLE
<br /> METHODS AND MATERIALS NOT EXPUCR BUT NPUED ARE INTENDED TO BE BUILDER DESIGNED, LOCATE IN ADVANCE OF ANY EXCAVATIONS.CONTRACTOR SHALL HAVE SUBSURFACE UTILITY 31. BdATFRIu S AND EQUIPMENT FOR ALL 600 STEWART STREET,SUITE 200
<br /> (RVI
<br /> FURNISHED AND INSTALLED. INVESTIGATION PERFORMED IN ADVANCE OF ANY EXCAVATIONS IN AREAS POSSLB CONTAINING FIBER ALL MATERIALS AND EQUIPMENT USED IN THIS INSTALLATION SHALL BE NEW,UNLESS OTHERWOTHERWISEOR OTHER TELCO 5CES ENTRANCES AND AREAS NOT COVERED BY TIE PUBLIC UTILITY LOCATING AUTHORIZED BY THE VERIZON REPRESENTATIVE,AND HAVE THE APPROPRIATE UL LISTING AND FACTORY ALL�JYENT NCWDEO WITHER THE PROJECT REQUEST FOR PROPOSAL AFE FOURED FOR THE COMPLETE SE:ATELE,WA 98T01
<br /> 3. COORDINATION: SERVICE.GROUND PENETRATING RADAR IS THE PREFERRED SUBSURFACE UTILITY LOCATING METHOD TO PROJECT SCOPEE OF WORK THE CONTRACTOR SHALL BE RESPONSIB WORK FOR ALL WORK(EQUIPMENT,MATERIAL PHONE:206,268.7370
<br /> BE USED.RESULTS OF THIS SUBSURFACE EXPLORATION SHALL BE SUBMITTED TO VEPoZON AND THE A/E MUTUAL(FM)APPROVAL ALL MATERIALS SHALL COMPLY WITH ALL APPLICABLE LOCAL AND NATIONAL INSTALLATION,TESTING,ETC.)INDICATED N ALL DOCUMENTS.THE RFP,ATTACHMENT A M/W/DV/BE QUESTIONNAIRE, www.mordsonhershfield.com
<br /> CODES,STANDARDS,REGULATIONS AND CEO/MACES.CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND
<br /> A THE CONTRACTOR S RESPONSIBLE FOR THE COORDINATION OF THE WORK. THE PROJECT FOR REVIEW MID APPROVAL PRIOR TO ANY EXCAVATIONS.WAD EXCAVATION SHALL EXECUTED AGREEMENT(ATTACHMENT B PROPOSED AGREEMENT),ATTACHMENTENTC BD PR HATED/COST BREAKDOWN,
<br /> GENERAL NOTES PERTAIN TO ALL SCOPE OF TIE WORK. PERFORMED IN THE AREAS WITHIN 10 FEET HORIZONTALLY N ANY DIRECTION FROM POSSIBLE TELCO MATERIALS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY STATED ATTACHMENT D PROJECT MANUAL(CONSTRUCTION DRAWINGS),ATTACHMENT E OTHER RELATED BID DOCUMENTS,
<br /> B. CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND SCHEDULING WORK BETWEEN ALL TRADES ENTRANCE UNDERGROUND UTILITIES.HAND EXCAVATION SHALL ALSO BE PERFORMED ELSEWHERE AS OTHERWISEDO NOT SCALE DRAWINGS. CONTRACTOR MUST
<br /> AO EACH OTHER.F Y THE DRAWING (STANDARDS PER D CIFINTTE S INTENDED
<br /> AND TOIMLYSECLARIFICATIONS ARE COMPLEMENTARY SUB ARY VERIFY ALL DMENSONS AND ADVISE CONSULTANTS
<br /> AND BETWEEN CONSTRUCTION ACTIVITIES AND THE OCCUPANTS OF THE BUILDING SUCH THAT DIRECTED BY THE A/E AND/OR VFFRQON. TO EACH THE NISHALL ALL SUB S NOT IMEWORK TO IMPLY ON MILL TION OF SUB
<br /> WORK IS COMPLETED N A TIMELY MANNER. 32. ROOF WORK CONTRACTOR WORK CONTRACTOR SHALL ASSIGN ALL SUB CONTRACTOR WORK MID VERIZON WILL NOT ACCEPT ANY OF ANY ERRORS OR OMISSIONS.NO VARIATIONS OR
<br /> C. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO 18. ENE FIRFSTOPPNG CUTTING,PATCHING,AND/OR REPAIR WORK PERFORMED ON ANY WARRANTED ROOFING SYSTEM SHALL BE CHANGE ORDERS FOR HNERIUL CONTRACTOR WORX ASSIGNMENTS. MODIFICATIONS TO WORK SHOWN SHALL BE
<br /> COMMENCEMENT OF WORK,SEE 1 FOR REQUIREMENTS.EACH SHALL BE RESPONSIBLE FOR THE ALL FTRESTOPPNG SHALL BE PROVIDED BY A SINGLE CONTRACTOR FOR AL TRADES USING A SINGLE COMPLETED CT AR APPROVED VENDOR IN A MANNER THAT MAINTAINS THE FULL EFFECT OF THE ROOFIMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL
<br /> COORDINATION OF ALL RELATED SCOPE WHOSE WORK IMtIO-URS WITH THEIR OWN. MANUFACTURER'S PRODUCTS(HILT).ALL PENETRATIONS IN FLOORS,ROOFS,OR FIFE-RATED PARTITIONS WARRANTY.YERIZON WILL PROVIDE THE NAME CF THE APPROVED VENDOR(S)FOR THIS FACILITY UPON CONTRACTOR SHILL BE RESPONSIBF FOR DISTRBUONG AL REP DOCUMENTS TO THEIR SUB CONTRACTORS.ALL RFP ALL PREVIOUS ISSUES OF THIS DRAWING ARE
<br /> D. CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL OPENINGS FOR EQUIPMENT WITH SHALL BE SEALED WITH AN APPROVED FIRE-PROTECTION MATERIAL IN A MANNER FLLLY COPLIANT WITH REQUEST.THE ROOF STOILM SHALL BE SEALED AND WATERTIGHT AT THE END OF EACH WORKING DAY. DOCUMENTS ARE REWIRED TO INDICATE THE PROJECT SCOPE OF WORK.PARTIAL SUBCONTRACTOR DOCUMENT SUPERCEDED BY THE LATEST REVISION. ALL
<br /> APPROVED SHOP DRAWINGS BEFORE PROCEEDING WITH THE WORE. THE MANUFACTURER'S SPECIFICATIONS,AND RESULTING IN A UL-APPROVED ASSEMBLY.WHEN ALL WORK THE CONTRACTOR SHALL REQUEST A ONLY INSPECTION PRIOR TO LEAVING THE SITE,AND ALL ROOF PACKAGES ARE HIGHLY DISCOURAGED. DRAWINGS AND SPECIFICATIONS RERAN THE
<br /> E. CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL EWPMENT PADS AND BASES. ASSOCIATED WITH THE PROJECT S COMPLETED.THE ASSEMBLY SHALL HAVE AN ADHESIVE LABEL AFFIXED, CLOSURES WILL BE INSPECTED AND APPROVED EN VERIZON PRIOR TO THE CONTRACTOR LEAVING THE RE CONSTRUCTION DRAWINGS,REFERENCED STANDARDS,VERIZON WIRELESS STANDARDS.OTHER REP ATTACHMENTS PROPERTY OF MORRISON HERSHFIELD
<br /> CONTRACTOR SHALL VERIFY POWER,WATER AND DRAIN INSTALLATION W/EQUIPMENT AS RECOMMENDED BY THE MANUFACTURER.THIS LABEL SHALL BE SIGNED BY THE CONTRACTOR. SITE.THE CONTRACTOR WILL BE SUMMONED BACK TO THE SITE SHOULD THIS DIRECTIVE NOT BE AND THE TERMS MAD CONDITIONS ARE COMPUMENURY OF ONE ANOTHER N THE EVENT OF CONFLICT BETWEEN THE CORPORATION
<br /> MANUFACTURERS BEFORE PROCEEDING WITH THE WORK PATCH RAND REPAIR AFFECTED EXISTING FOLLOWED CR REPARATIONS WILL BE MADE AT THE CONTRACTORS EXPENSE INSTAUNG CONTRACTOR TO DRAWINGS,REFERENCED STANDARDS,VERZON WW1 PSI STANDARDS.OTHER RFP ATTACHMENTS OR TERMS AND
<br /> EQUIPMENT/SURFACES AS REQUIRED. 19. TEMPORARY FIRESTOPPNG PROVIDE PLYWOOD ROOF MATS AND WALKWAYS AROUND ROOFTOP EQUIPMENT INVOLVED IN CONDITIONS,THE ARCHITECT/ENGINEER SHALL BE CONTACTED FOR FORMA INTERPRETATION OF THE REQUIREMENT.
<br /> F. WHERE INSTALLATION AND/OR CONNECTION OF EQUIPMENT IS NOT SPECIFIED BLIT SUCH PROPOSED WALL,CEILING OR FLOOR PENETRATIONS SHALL BE APPROVED ETY VERIZON PRIOR TO CONSTRUCTION,AND REMOVE THESE MATERIALS FOLLOWING CONSTRUCTION. TIE CONTRACTOR SHALL BE DEEMED TO HAVE PROVIDED THE►lD5I DETAILED AND EXPENSIVE INN UARLIATION OF
<br /> CONNECTION AND/OR RSTALATION IS REQUIRED FOR A COMPLETE AND OPERABLE Sis HUM, COMMENCEMENT OF WORK ANY TEMPORARY OPENING IN AN EXISTING FIRE-RATED PARTITION SHALL BE 33, E THE REQUIREMENT.ANY WORK INSTALLED IN CORIUM WITH CONFLI THE ARCHITECT/ENGINEER INTERPRETATION SHALL BE
<br /> THE CONTRACTOR SHALL BE HELD RESPONSIBIF FOR SUCH CONNECTION AND/OR INSTALLATION. CLOSED WITH TEMPORARY FLOCKINGWOW
<br /> G AT THE END OF THE DAY OR WHENEVER WO IN THAT CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO EXPENSE TO OWNER.
<br /> THIS WORK SHALL INCLUDE ALL UTILITY HOOK-UPS. PENETRATION IS FINISHED FOR THE DAY.TEMPORARY BLOCKING CONSISTS OF COMPLETELY FLUNG THE ALL FINISHES AND MATERIAL TREATMENT(SUCH AS PAINT,FIREPROOFING,ROOFING MATERIALS OR ANY
<br /> OPENING WITH HLTI-APPROVED CERAMIC WOOL F THE OPENING S IN THE FLOOR,THE OPENING SHALL OTHER COATING)SHALL BE APPLIED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS AND ASSIGNMENT CF WORK:THE AGREEMENT BETWEEN THE CONTRACTOR AND THE OWNER S A SINGLE PRIME CONTRACT.
<br /> 4. ASSIGNMENT OF WORK-SEE PROJECT SCOPE AND RFP. ALSO BE COVERED DALY WITH PLYWOOD OR A SHEET METAL PLATE.THE CONTRACTOR SHALL NOTIFY SPECIFICATIONS.THE CONTRACTOR SHALL PROVIDE PROTECTION FOR ALL AREAS WHERE PANTING WILL THE CONTRACTOR S RESPWSBLE FOR THE COMPLETE SCOPE OF WOW INCLUDING THE COORDINATION OF
<br /> NERIZON OF ANT'OPENING(S)WITH TEMPORARY BLOCKING INSTATED.ALL TEMPORARY BLOCKNG SHALL OCCUR.THE AFFECTED AREA SHALL BE PROVIDED WITH ADEQUATE VENTILATION TO DISSIPATE FUMES. SUBCONTRACTORS.THE CONSTRUCTION DOCUMENTS DO NOT DEUNEATE BETWEEN SUBCONTRACTORS MD ANY
<br /> 5. ABBREVIATIONS:THROUGHOUT THE PLANS ARE ABBREVATKNS WHICH ARE OF COMMON USE THE UST BE REPLACED WITH FINAL FIRE BLOCKING WHEN WORK N THAT OPENING IS COMPLETED,OR IF NO WORK THE HOURS WHEN PAINTING MAY OCCUR SHALL BE COORDINATED WRIT VERIZON PRIOR TO BEGINNING INFERENCE TO OF WORK S A SUGGESTION ONLY.NEITHER THE OWNER NOR THE ARCHITECT/ENGINEER WILL
<br /> OF ABBREVIATIONS PROVIDED S NOT INTENDED TO BE COMPLETE OR REPRESENTATIVE OF ALL IS SCHEDULED FOR OVER ONE WEEK. WORK THE CONTRACTOR SHOULD EXPECT THAT PAINTING/COATING WORK INCORPORATING VOLATILE OR OFFER,AT ANY TIME,ANY OPINIONS OR PROPOSED RESOLUTIONS CONCERNING ASSINMENT OF WORK TO LLI
<br /> CONDITIONS OR MATERIALS ACTUALLY USED ON THE PROJECT.THE ARCHITECT WILL DEFINE THE INTENT NOXIOUS PRODUCTS MAY BE ISOLATED TO NON-WORKING HOURS FOR GENERAL STAFF COMFORT. SUBCONTRACTORS.N THE EVENT OF MISSING OR CONFLICTING SCOPE PROVIDED BY THE CONTRACTOR OR ANY OF111114> Z
<br /> ANY INU.OF A QSIIUN. 20. HAZARDOUS MATERIALS-CALL VZW ENv1RONMENTAL COMPLIANCE HOTLINE(800) PROTECTIVE MEASURES AND APPLIGDCN SCHEDULES ARE SUBJECT TO APPROVAL BY VERIZON. THE SUBCONTRACTORS,THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE WORK. °D O
<br /> IF THE CONTRACTOR UNCOVERS OR ENCOUNTERS ANY MATERIAL THAT IS BEUEVID TO BE HAZARDOUS El J
<br /> 6. Ma ALL WORK SHALL BE PERFORMED IN FULL COMPLIANCE WITH ALL APPIJCABLE LOCAL AND NATURE(ASBESTOS, LEAD PAINT,DIALLED CHEMICALS,OR OTHERWISE),THE CONTRACTOR SHM1 NOTIFY 34. DQQBS AA2 M
<br /> NATIONAL CODES,STANDARDS AND ALL APPLICABLE AMENDMENTS.IN CASE OF ANY CONFLICT WHEREIN VERIZON IMMEDIATELY,AND SHALL NOT ABATE,REMOVE,SAMPLE,DISTURB,OR OTHERWISE HANDLE THE NO'FIRE-RATED'OR SSHALL
<br /> 'SECURE'DOOR BE PROPPED OPEN EXCEPT FOR THOSE TIMES THAT AREC ND Q
<br /> THE METHODS OR STANDARDS OF INSTALLATION OR THE MATERIALS SPECIFIED DO NOT EQUAL OR MATERIAL WITHOUT WRITTEN AUTHORIZATION FROM VERIZON.THE UNCONTROLLED RFl FARE OF ANY SUCH NECESSARY FOR THE UNLOADING OR MOVING OF EQUIPMENT,MID ONLY THEN,LONG ENOUGH TO V r Q
<br /> EXCEED THE REQUIREMENTS OF THE LAWS OR ORDNANCES,THE LAWS AND ORDINANCES WILL GOVERN. SUBSTANCE SHALL ALSO BE REPORTED TO THE LOCAL FIRE DEPARTMENT BY THE CONTRACTOR. ACCOMPUSI THIS TASK THE CONTRACTOR SHALL EXERCISE CARE WHILE SECURE'DOORS ARE OPEN TO 0 , N W O
<br /> NOTIFY ARCHITECT OF ALL CONFUCTS PRIOR TO COMMENCING ANY WORK.WHERE REQUIRED BY THE DISPOSAL OF MY SUCH MATERIAL SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES AND ENSURE THAT NO UNAUTHORIZED ENTRY OCCURS. SECURE'DOORS SHALL NOT BE PROPPED OPEN FOR W A z > cN
<br /> Ail,THE CONTRACTOR SHALL ISSUE PUBLIC NOTICES. REGULATIONS,AND DOCUMENTATION OF DISPOSAL SHALL BE PROVIDED BY THE CONTRACTOR TO THE VENTILATION UNLESS APPROVED BY VERIZON.NEITHER'SECURE'NOR'FIRE-RATED'DOORS SHALL BE O W ¢ 0)
<br /> VERIZON REPRESENTATIVE. PROPPED OPEN UNLESS MONITORED AT ALL TIMES.
<br /> 7. PROVIDE ALL REQUIRED PERMITS Z U CO
<br /> A CONTRACTOR S RESPONSIBLE TO PAY FOR AND OBTAIN PERMITS AND LICENSES NECESSARY FOR 21. ASBESTOS-CONTAINING MATERIALS(ACM) 35. MATERIAL SAFETY AND DATA SHEETS(MSDS DOCUMENTATION) O
<br /> THE PROPER.ALL POSSIBLE RIGHT OF WAY WORK TO BE PER CITY DEPARTMENT OF ENGINEERING THE CONTRACTOR SHALL NOT USE ANY MATERIAL THAT CONTAINS ASBESTOS(ACM)FOR ANY APPLICATION THE CONTRACTOR WILL BE REQUIRED TO MAINTAIN ALL MSOS MD RELATED INFORMATION FOR ALL H Z I- W H
<br /> STANDARDS. CN THIS PROJECT. MATERIAL AND EQUIPM
<br /> ENT DELIVERED AND/OR STORED AT THE SITE.THE MSDS SHALL IDENTIFY TIE <H- )- W
<br /> B. WORKING HOURS FOR THE USE OF LOUD EQUIPMENT SHALL BE LIMITED TO TIMES ESTABLISHEDholU U o
<br /> BY THE LOCAL JURISDICTION.THIS EQUIPMENT SHALL INCLUDE BUT IS NOT LMITED TOLOCATION OF THE PRODUCT WITHIN THE FACILITY AND SHALL BE MADE AVAILABLE FOR REVIEW BY ANY O W W AN
<br /> GENERATORS,COMPRESSORS,GRADERS,DRILLS,COMPACTORS,RADIOS,AND OTHER SIMILAR 22. RITE SURVEYRTHE AND NOR VEROONNARE GUARANTEEING AR FS PARTY FOR BYE DURATION OF THE PROJECT.MSDSANDRELATED
<br /> IN MSDS HOLDERSNINCLUDING SHALL BE NUMBER AND -10 w N w
<br /> EQUIPMENT. NEITHER THE A/E NOR VERIZON ARE THE ACCURACY OF THE INFORMATION DEPICTED IN INSTALLED m THE CONTRACTOR.THE MSC$ RELATED INFORMATION, ROOM NUMBER F
<br /> THESE DOCUMENTS.THERE ARE NO IMPLIED WARRANTIES ASSOCIATED WITH THESE DOCUMENTS. LOCATIONS,SHALL BE HOLUOED N THE PROJECT MANUALS TO BE DELIVERED BEFORE FINAL (I)
<br /> 8. DUALITY Of MATERIALS AS SPECIFIED SHILL BE AND ANY CHANGE SHALL BE OF CONTRACTOR SHALL FIELD VERIFY CONDITIONS PRIOR TO BIDDING THE WORK.ALL DRAWINGS ABS APPLICTTON FOR PAYMENT. JAI H�yH
<br /> DUAT O EEA WARY UNLESS BEECONSIDERED REMINIMUMBY OWNER AND AN SD THE DIAGRAMMATIC AND MAY NOT SHOW AL DETAILS REQUIRED TO CLEAR FIND-ENCOUNTEREDLLJ
<br /> MONST DEPARTMENT.I SPECIFICALLYSSE LLEASED OF HIGH (APPROVE FORBY OBSTRUCTIONS.WHERE MINOR DEVIATIONS IN SYSTEMS ARE REQUIRED DURING CONSTRUCTION THE 36. FLEW OFFICE MASTER SCOPE 0 F WORK SUMMARY CO Q
<br /> BUILDINGCOMMERCIALUST.PROVIDE MATERIALSADEQ NOTO HEAT AND SHELTER BE OF AIH TO QUALITYA INTENDED STANDARDS CONTRACTOR SHALL MAKE SUCH ACCOMMODATIONS AT NO ADDITIONAL COST TO VERIZON.THE VERIZON WILL NOT BE PROVIDING SPACE WITHIN THE FACILITY FOR A FIELD OFFICE OR A JOB-SITE
<br /> AND MATERIAL PRIOR TX,DURING MOUTON OF THE WORK,AND UNTIL OWNER ACCEPTANCE,TO CONTRACTOR SHAH ADVISE THE ARCNRECT OF ANY DISCREPANCIES TO THE BID AND PRIOR TO INVITER.
<br /> PERFORMING THE WORK. LL.)
<br /> MAINTAIN DIMENSIONAL STARIUTY AND MATERIAL Q STORED MATERIALSCEORNOT INSTALLEDA SHILL BE 37. DELIVERED VERIZON WI PROPOSES TO INSTALL AN UNMANNED TELECOMMUNICATIONS FACILITY CONSISTING OF: U)
<br /> OF A MOISTURE CONTENT THAT MU.NOT ALTER GENERAL APPEARANCE OR INTEGRITY OF ASSEMBLY 23. "CALF OF ORAWINTS VERIZON WILL NOT RECEIVE ANY TYPE OF DELIVERY ON THE CONTRACTOR'S BEHALF UNLESS PRIOR
<br /> WHEN MOISTURE CONTENT DECREASES TO SERVICEABLE LEVELS.MATERIALS ARE TO BE INSTALLED IN MEASUREMENTS AND/OR LOCATIONS SHALL NOT BE SCALED FROM THE CONSTRUCTION DRAWINGS. ARRANGEMENTS ARE MADE WITH VERIZON.THE CONTRACTOR SHALL BE PRESENT TO RECEIVE PROJECT INSTALLATION OF THE FOLLOWING EQUIPMENTS WITHIN AN ENCLOSED EQUIPMENT ROOM:
<br /> PROFESSIONAL MANNER TO THE HIGHEST INDUSTRY STANDARDS. CONTRACTOR SHALL USE POSTED DIMENSIONS ONLY,CONTRACTOR SHALL OBTAIN CLARIFICATION FROM DELIVERIES.THE CONTRACTOR SHALL NOTIFY THE SITE RECEIVING AGENT'AT LEAST ONE(1)DAY IN (2)TELCO
<br /> 9. BUILDING AND EQUIPMENT: THE ARCHITECT BEFORE PROCEEDING IF ANY DIMENSION(S)ARE IN QUESTION. ADVANCE TO SCHEDULE ACTMTIES ON THE LOADING DOCK.VERIZON DELIVERIES TAKE PRIORITY AT ALL (4)RF TRANSPORT RACK
<br /> A MAINTAIN AREAS FREE OF DEBRIS ACCUMULATION.KEEP WORK AREAS NEAT AND ORDERLY AS VERZON LADING DOCKS ALL SHIPPING COSTS ARE THE RESPONSIBILITY OF THE CONTRACTOR,WTIH (1)DC POWER PLANT
<br /> MUCH AS REASONABLY POSSIBLE. 24. PROJECT RECORD DRAWINGS THE EXCEPTION OF OWNER-FURNSHED EQUIPMENT. (2)BATTERY RACKS
<br /> B. CONTRACTOR TO REMOVE ALL MATERIALS NOT RELATED TO THE FINISHED PRODUCT FROM THE PROJECT RECORD DRAWINGS SHALL BE UPDATED ON A ONLY BASIS IN ACCORDANCE WITH THE (1)VZB HD FIBER RACK
<br /> SITE.DO NOT BURY ON STE. SPECIFICATIONS. 38. FORAGE MID STAGING (1)VZB PON RAO(
<br /> VERIZON WILL NOT BE PROVIDING SPACE WITHIN THIS FACILITY FOR USE BY THE CONTRACTOR AS REV'DESCRIPTION I DATE
<br /> 10. CONTRACTOR S RESPONSIBLE FOR ALL ERECTION,BRACING AND SHORING OF EQUIPMENT DR 25. WOBI(HOURS STORAGE AND/CR STRONG UNLESS PRIOR ARRANGEMENTS ARE MADE AND APPROVED IN WRITING.THISEMERGENCY INSTAL ATION OF NEW 60KW DIESEL GENERATOR EQUIPPED WITH A MINIMUM 300 GALLON
<br /> MATERIALS UNTIL SUCH TIME R S PERMANENTLY SUPPORTED OR S READY FOR REMOVAL DURING REGULAR WORK HOURS ARE FROM 7:00 A.M.TO SOD P.M.THIS MAY BE ADJUSTED TO ACCOMMODATE WRITTEN APPROVAL SHALL INCLUDE A CLEAR DESCRIPTION IDENTIFYING THE LIMITS OF THE AREA(S) DIESEL TANK.(UL142) A ISSUED FOR CO%SAWANTAL 08202017
<br /> CONSTRUCTION IRREGULAR CIRCUMSTANCES BUT REQUIRES THE APPROVAL Of VERZON.MAINTENANCE-WINDOW WORK ALLOWED.THE CONTRACTOR SHALL SECURE WRITTEN APPROVAL IN ADVANCE FOR ANY NECESSARY B REISSUED FOR 00%SUBMITTAL : 11.222017
<br /> HOURS ARE 12:00 AM.TO 5:00 AM.,LOCAL TIME.THE CONTRACTOR SHALL DETERMINE ANY WORK-HOUR STORAGE OUTSIDE THE VERIZON LEASEHOLD OR OWNED PREMISES FROM THE OWNER OF NE PROPERTY • (2)NEW MECHANICAL WAIL MOUNT UNITS W/WALL REINFORCEMENT c IISSUED FOR 100%Eos SUBMITTALB1.os2o18
<br /> Ti. CONTRACTOR OPTIONS.WHERE ONLY ONE MANUFACTURER'S EQUIPMENT OR ITEMS LISTED OR RESIHILUONS AFFECTING THE SCOPE OF WORK AND ALL COSTS SHALL INCLUDED IN THE BID. IN QUESTION.THE CONTRACTOR SHALL PROVIDE A SUITABLE MEANS FOR STORAGE AND COORDINATE ITS I
<br /> LOCATION FOR THE HOUSING OF ALL JOB-RELATED MATERIALS AND EQUIPMENT.STORAGE OF 0 ISSUED FOR PERMIT 02072018
<br /> SPECIFIED,OR THE EQUIPMENT OR f AS IS USIA AS THE BASIS Of DESIGN PRODUCT,BUT NO ELECTRICAL UPGRADES I
<br /> OTHER MANUFACTURERS ARE LISTED AS ACCEPTABLE,THEN PRODUCTS SHALL BE TREATED AS A 26. RY OF WORK COMBUSTIBLE/FLAMMABLE LIQUIDS IS NOT PERMITTED WRMN THE BUILDING,BUT OUTSIDE IN A
<br /> SUBSTITMON. CONTRACTOR SHALL PERFORM ALL WORK AND INSTALL AL COMPONENTS IN A PROFES90NAL AND DESIGNATED STORAGE AREA ALL COMBUSTIBLE MATERIALS SHALL BE COVERED WITH UL LISTED FIRE
<br /> WORKMANUKE MANNER ALL FNISH WORK SHOT BE TRUE,LEVEL AND PLUMB.ALL JOINTS SCUT BE RETARDANT TARPAULINS DURING NON-WORKING PERIODS.
<br /> SEPARATE PERMITS WILL BE ATTAINED FOR:
<br /> 12. SUBSIIMION REQUESTS'ALL SUBSTITUTION REQUESTS MUST BE SUMMED IN ACCORDANCE WITH TIGHT MID CLEAN.
<br /> VERIZON STANDARDS. 27. WARRANTY 39. CLEAN INFSS • DIESEL TANK i
<br /> CONTRACTOR SHILL PROVIDE DETAILS OF ITS WARRANTY POLICIES AND PROCEDURES INCLUDING,BUT NOT WORK AREAS ARE TO BE KEPT CLEAN AT ALL ONES. • ALARM Sr.IEM NETWORK COMPLANCE BUBMIRALS I DATE
<br /> 13. $5(Ea • BATTERY STS TEN
<br /> THE CONTRACTOR S RESPONSIBLE FOR SITE SAFETY.THE CONTRACTOR SHALL TAKE ALL 3Itri LIMITED TO A CLEAR STATEMENT OF THE DURATION AND CONDITIONS OF WARRANTIES,AND THE 40. TRASH AND REFUSE DISPOSAL PRELIMINARY BIRALSSpN
<br /> NECESSARY TO ENSURE THE SAFETY OF ALL PERSONNEL BY ADEQUATELY PROTECTING THEM FROM WARRANTIES OF SUPPUER'S SUPPUERS.CONTRACTOR TO PROVIDE A ONE-YEAR FITNESS AND SUITABILITY' THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL PROJECT-RELATED TRASH,
<br /> CONSTRUCTION HAZARDS AND ACTIVITIES THROUGHOUT THE COURSE OF THIS WORK ALL WORK AREAS WARRANTY FOR ALL WORK,THE PERIOD TO BEGIN WITH FINAL ACCEPTANCE BY THE VERIZON WASTE,AND/OR GARBAGE.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE A 30%SUBMERSION
<br /> SHALL BE PROPERLY MARKED.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE BARRIERS. REPRESENTATIVE. DUMPSTER FOR THE DURATION OF THE PROJECT IF REQUIRED.COORDINATE WITH VERIZON FOR THE 60%SUBMISSION
<br /> BARRICADES,SGLAGE AND PROPERLY SECURE ALL WORK AREAS.COMMON AREAS,PUBLIC WAYS, 28. JMill L LNG AND CUTTING-FIRE PROTECTOR Sl'SIFM AND DUST/WATER CONTR01 DUMPSTER LOCATION.NE DUMPSTER SHALL BE EMPTIED AT SUITABLE INTERVALS TO PRESERVE THE 90%SUBMISSION II.22.20I1
<br /> AND/OR OTHER AREAS ACCESSIBLE TO NON-CONSTRUCTION PERSONNEL SHALL BE FREE OF VERIZON AND NOTIFIED BEFORE BEGINNING ANY DRAWING OR CUTTING OO CONCRETE,GYPSUM APPEARANCE OF THE SIE.COMBUSTIBLE DEBRIS SHOULD BE REMOVED ON A DAILY BASIS.THE USE OF
<br /> 15o%sueMISsnN cI-os.xle
<br /> HAZARDOUS CONDITIONS RESULTING FROM THIS PROJECT AT ALL DIES.ANY UNSAFE CONDITION BOARD,OR SHALL BE PSI-PRODUCING MATERIALS.ALL EQUIPMENT IN AFFECTED AREAS SHALL 6E VERIZON DUMPSTERS OR DUIPSTERS OWNED BY OTHERS FOR DISPOSAL OF CONSTRUCTION DEBRS IS
<br /> OBSERVED SHALL BE REPORTED IMMEDIATELY TO THE VERIZON REPRESENTATIVE. PROHIBITED.THE CONTACTOR SWOT REPAIR ANY SURFACE DAMAGE AS A RESULT OF THE DELIVERY, OMGNALISSUE
<br /> PROTECTED TO THE SATISFACTION GE THE VEPoZON REPRESENTATIVE.PRIOR TO ANY DUST-PRODUCING EXCHANGE,DROPPING AND/OR REMOVAL OF NE CONTRACTOR'S DUMPSTER.REMOVAL AND DISPOSAL OF ISSUED FOR CONSTRUCTION
<br /> 14. EMERGENCIES.EVACUATION PROCEDURES A JOR SITE ACCIDENTS WORK,THE CONTRACTOR SHALL DISARM THE FIRE-DETECTION SYSTEMS)AND COVER ALL SMOKE TRASH,WASTE AND/OR GARBAGE SHALL BE EXECUTED IN A LAWFUL MANNER. - ISSUED FOR PERMIT O2.07.20'l
<br /> N NE EVENT OF A FACLIY EMERGENCY,THE CONTRACTOR SHALL ADHERE AND ASSIST IN THE DETECTORS WITHIN FIFTY(50)FEET OF THE WORE AREA AND ENSURE THAT TIE STSIEM S RETURNED
<br /> COORDINATION OF THE FOLLOWING EMERGENCY PROCEDURES: TO NORMAL OPERATION AT THE END OF EACH WORK DAY.ALL DES SUPPRESSION DUMPED AS A RESULT 41. INLYKI-11156 RECORD SETIAS'BULTSI
<br /> A ASSURE PERSONNEL SAFETY. CF NE CONTRACTOR NOT FOLLOWING THIS REQUIREMENT WILL BE REPLACED AT THE CONTRACTOR'S THE FOLLOWING ITEMS SHALL BE SALVAGED BY THE CONTRACTOR AND TURNED OVER TO VERIZON:
<br /> B. ACCOUNT FOR ALL ON-SITE CONSTRUCTION PERSONNEL AND VISITORS. EXPENSE ALL SUCH WORK LOCATIONS SHALL BE APPROVED IN ADVANCE BY VERIZON.WHEN DRILLING OR A ALL COPPER WIRE OVER 25011CM PROJECTNO STAMP
<br /> C. EVACUATE OR RECOVER. CUTTING S REQUIRED IN AN AREA WITH TELECOMMUNICATIONS EQUIPMENT INSTALLED,A HEPA VACUUM
<br /> D. SUMMON ASSISTANCE CLEANER SHALL BE EMPLOYED TO CONTAIN DUST AND PARTICULATE MATTER DURING THE OPERATION.ALL 7170182 8259 '
<br /> UPON RESTORATION OF ORDER,THE CONTRACTOR'S ON-SITE SUPERINTENDENT SHALL PROVIDE A AREAS ABOVE THE CEILING SHALL BE VACUUMED CLEAN ALTER THE WORK S COMPLETE.ALL VACUUM 'REGISTERED
<br /> WRITTEN REPORT DETAIUNG THE CAUSE OF,AND RECOVERY FROM,DE INCIDENT. CLEANERS SHALL BE APPROVED FOR USE BY THE VERIZON REPRESENTATIVE.WHEN WET CORING,ALL DESIGNED 81' FA ITCH
<br /> PRECAUTIONS SHALL BE TAKEN TO CONFINE WATER TO WORK AREA
<br /> 15. SRI SECURITY DRAYNBY: LP
<br /> A VISITOR'S BADGE SHALL BE WORN BY ALL PERSONNEL AT ALL TIMES WHILE ON VERIZON PROPERTY, 29. F OORING/FLOOR CHECKED BY: RL E
<br /> WITHOUT EXCEPTION.AIL FORCES SHALL SIGN IN AND OUT EACH DAY MN THE VERIZON AT CUTTING AND DRILLING OF ACCESS FLOOR SWOT WHIR IN AREAS DESIGNATED BY THE VERZON REPRESENTATIVE TO RECEIVE THE BADGE.AT THE DISCRETION OF THE VERIZON REPRESENTATIVE,THE REPRESENTATIVE FOR WORK REQUIRING G THE REMOVAL OF FLOOR TILES,THE CONTRACTORSHALL PROVIDE PROVIDE 16461@lif ittlIFORTAN
<br /> CONTRACTOR SMALL ASSUME RESPONSIBILITY FOR THE DAILY SIGN-IN/OUT OF THE CONTRACTOR CONE BARRIERS AROUND ALL FLOOR OPENINGS FOR NE DURATION OF THESE ACTIVITIES.ADDITIONAL
<br /> FORCES.A VALID DRIVER'S LICENSE OR STATE ID SHALL BE PRESENTED EVERY DAY IN ORDER TO HAZARD UGNDHG SHALL ALSO BE PROVIDED,IF NECESSARY.THAT SUFFICIENTLY ILLUMINATES THE AREA
<br /> OBTAIN THE BADGE.THE USING SHALL INCLUDE THE NAME AND BADGE NUMBER OF ALL PERSONNEL AT ALL TIMES.THESE BARRIERS AND LIGHTING SHALL BE LEFT IN PLACE UNTIL THE PENETRATIONS ARE SHEET TITLE
<br /> MID BE PROVIDED TO THE VERIZON REPRESENTATIVE ON NE FOLLOWING DAY,AND SHALL CLEARLY CLOSED FLUSH.REMOVAL OF FLOOR TILES AGAINST A WALL OR DOOR JAMB SHALL NOT BE DONE
<br /> INDICATE THE COMPANY NAME,INDMDUAL'S NAME AND BADGE NUMBER OF ALL PERSONNEL ON THE WITHOUT THE PERMISSION OF THE VERIZON REPRESENTATIVE.TOHESATISFACTION
<br /> UPON COF THEON OF THE PROJECT.SENT ALL PROJECT
<br /> SITE FAILURE TO COMPLY WITH THESE SECURITY REQUIREMENTS MAY RESULT IN PERSONNEL BONG FLOOR METAL AREAS AVIA11 BE CLIIBE TELY COMPLETELYCIEVI M THE FROM
<br /> THE TILE OF SHARPAR ROR ROUNTATNE
<br /> ESCORTED OFF NE STE. ALL SHAVINGS SHALL BE LOORREMOVED FROM THE AND ALL OR ROUGH
<br /> EDGES FILED SMOOTH.CUT/DRILLED FLOOR TILES SHALL HAVE THEIR EXPOSED CONCRETE AND METAL Cr GENERAL NOTES
<br /> EDGES SEALED WITH TWO COATS OF CLFM SPRAY SEALANT PRIOR TO RE-INSTALLATION TO PREVENT l
<br /> FUTURE'CONCRETE DUSTING'AND CORROSION.SPRAY SEALANT SHALL BE APPLIED IN THE DESIGNATED ✓✓✓
<br /> AREAS.ALL RASED FLOOR CUTS MUST BE UNED WITH THE APPROPRIATE GROMMET OR PLASTIC TRIM TO
<br /> ENSURE THAT NO ROUGH EDGES ARE EXPOSED. SHEET NUMBER GOO 1