My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 HEWITT AVE VERIZON WIRELESS ANTENNA 2021-04-01
>
Address Records
>
HEWITT AVE
>
2320
>
VERIZON WIRELESS ANTENNA
>
2320 HEWITT AVE VERIZON WIRELESS ANTENNA 2021-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 8:36:46 AM
Creation date
4/1/2021 8:35:47 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2320
Tenant Name
VERIZON WIRELESS ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
verizorrf <br /> THIS DRAWING WAS PREPARED SOLELY FOR THE USE <br /> OF VERIZON WRELESS AND MUST ONLY BE USED BY <br /> VERIZON WIRELESS EMPLOYEES,CONTRACTORS,AND <br /> VENDORS WHILE PERFORMNG THE WORK SHOWN ON <br /> THIS DRAWING.ANY OTHER USE OF THIS DRAWING IS <br /> FORBIDDEN. <br /> Mil <br /> E MORRISON HERSHFIELD <br /> 600 STEWART STREET,SUITE 200 <br /> SEATTLE,WA 98101 <br /> PHONE:206.268.7370 <br /> RESPONSIBILITY MATRIX EQUIPMENT PRE-PURCHASE SCHEDULE www.monisonhershfleld.com <br /> • <br /> TASK FURNISH INKRIDE MALL COORONAIX EQUIPMDIr SUPPLER OONTRACTCR ONISPUA1120 SWPLxIR CONTACT APPROX LEAD RYE DO NOT SCALE DRAWINGS. CONTRACTOR MUST <br /> - VERIFY ALL DIMENSIONS AND ADVISE CONSULTANTS <br /> OF ANY ERRORS OR OMISSIONS.NO VARIATIONS OR <br /> BUILDING&SITE CONSTRUCTION CONTRACTOR CONTRACTOR NVAC UNITS: MARVAIR ACCEPT EQUIPMENT AT JOB SITE. NAME: TWO MD MODIFICATIDNS TO WOW SHOWN SHALL BE <br /> ADS WAG L UNITS. OFFICE WO IMPLEMENTED w IOU!PRIORWRITTENAPPROVAL <br /> SECURITY SYSTEMS(MONITORING AND ACCESS) CONTRACTOR CONTRACTOR IN LE CONTROLLER AND D INSTALL/MOUNT EQUIPMENT. CELL: TWO AU. PREVIOUS ISSUES OF THIS DRAWING <br /> ARE <br /> LAB RACK VERIZON .FOR FAIL-OVER CONTROL BOX. FAT(: MD SUPERCEDED BY THE LATEST REVISION. ALL <br /> MAKE ALL CONNECTIONS. DRAWINGS AND SPECIFICATIONS REMAIN THE <br /> AUXIL ARY ROM FRAMING VERIZON CONTRACTOR PROPERTY OF MORRISON HERSHFIELD <br /> NEW 400A RATED, 120/240V-10-3W INTERSECT STARTUP AND TESTING OF EQUIPMENT CORPORATION. <br /> GROUNDING NO UGFIING PROTECTION SYSTEMS CONTRACTOR CONTRACTOR INTERSECT INTEGRATED LOAD CENTER(EC) PER NMIUFACfURERS REQUIREMENTS. <br /> BUILDING PERMIT FEES CONTRACTOR CONTRACTOR MLECT.# A000-SHEETS.P-2005F2.REFER TO D <br /> ADDITIONAL PEAMR FEES CONTRACTOR CONTRACTOR <br /> CONSTRUCTION MANAGER(VEl6ZON'S REPRESENTATIVE) VERIZON CONTRACTOR NEW BOICW(60KVA)STAND-BY EMERGENCY MTU ONSITE ENERGY <br /> SPECIAL INSPECTION AGENCY VERIZON CONTRACTOR DESEL GENERATOR WITH 300 GALLON TANK <br /> SMOKE DETECTION SYSTEMS CONTRACTOR CONTRACTOR <br /> SECURITY-GENERAL SITE CONTRACTOR CONTRACTOR NOTES: W <br /> FIREWATCH -DURING CONSTRUCTION AMITIES CONTRACTOR CONTRACTOR VERIZON CONTRACTOR 1. WHEN INDICATED AS PRE-PURCHASE EQUIPMENT AS PART OF TES PROJECT.THE EQUIPMENT WILL BE FURNISHED BY VERIZON FOR STORAGE AND INSTALLATION BY Z <br /> RACKS FOR EQUIPMENT <br /> THE CONTRACTOR.THE CONTRACTOR SHWA COORDINATEWITH THE VERIZON REPRESENTATIVE TO ARRANGE A TIMELY DELIVERY OF ALL OWNER-FURNISHED EQUIPMENT. C c.i. 0 <br /> AND <br /> DEPOWERING MARKINGS PLAN 'VERIZON CONTRACTOR BASED ON THE CONSTRUCTION 11MEUNE.THE CONTRACTOR SHALL PROVIDE A TYPE WRITTEN LIST TO THE VERIZON REPRESENTATIVE INDICATING ALL REQUIRED - J <br /> OWNER-FURNISHED EQUIPMENT AND DELIVERY DATE REQUIRED. m <br /> EMERGENCYMRING AUTOMATION CONTRACTOR CONTRACTOR o 2. TO CONFORM WITH THE CRITICAL PATH SCHEME.VERIZON WILL CONTACT THEIR VENDORS AND RESPOND TO TIC CONTRACTOR LIST. OWNER-FURNISHED EQUIPMENT O v r <br /> __ LKIRTING N/A WILL BE DELIVERED TO THE FACILITY.LI&ESS OTHER ARRANGEMENTS HAVE BEEN MADE. <br /> TASK UGHTING N/A - 1 w W N <br /> FIRE 3. THE CONTRACTOR.IN ACCORDANCE WITH THE VERIZON REPRESENTATIVE.SHAD.INSPECT EACH EQUIPMENT DELIVERY FOR ACCURACY AND SHIPMENT DAMAGE.THE OO W < <rn <br /> FIREEQUI SENT CONTRACTOR IS THEN ACCEPTING TIC EQUIPMENT,AND IT SHALL BE THOR RESPONSIBILITY TO HANDLE.STORE.PROTECT AND ULTIMATELY INSTALL THE EQUIPMENT. <br /> WAGED EQUIPMENT WILL BE REPLACED OR REPAIRED BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE ONCE EQUIPMENT HAS BEEN ACCEPTED BY THE Z <br /> HVAC EQUIPMENT- VERIZON VERIZON CONTRACTOR CONTRACTOR ■_ °Z I- LLI <br /> GENERATOR VERIZON VERIZON CONTRACTOR CONDUCTOR • <br /> 4. ALL DELIVERED EQUIPMENT SHALL BE STORED IN A SECURE LOCATION ON THE DAY THAT IT IS RECEIVED.VERIZON WILL NOT BE PROVIDING STORAGE SPACE WITHIN Q 15 <br /> - <br /> 2 W <br /> THE FACILITY FOR USE BY THE CONTRACTOR.UNLESS PRIOR ARRANGEMENTS HAVE BEEN MADE AND APPROVED IN MATING. C IIIIIIIO W W N W <br /> INTEGRATED LOAD CENTER(MDP(ILC)) VERIZON VERIZON CONTRACTOR CONTRACTOR 0 P W c.I w <br /> MANUAL TRANSFER SWITCH N/A 4:11) <br /> _ MAIN SEANCE ENTRANCE BREAKER VERIZON VERIZON CONTRACTOR CONTRACTOR N W > <br /> PORTABLE GENERATOR TAP BOX N/A > T~p <br /> PORTABLE GENERATOR N/A Q <br /> GENERATOR FUEL VERIZON VERIZON CONTRACTOR CONTRACTOR W <br /> NETWORK EQUIPMENT VERIZON VERIZON <br /> BATTERY INSTALLATION&CONTAINMENT VERIZON VERIZON <br /> URITIES(TO BUILDING TERMINATION) CONTRACTOR CONTRACTOR <br /> IT/TELEPHONE CONDUIT N/A <br /> if/TELEPHONE EQUIPMENT AND SYSTEMS N/A VERIZON <br /> FIBER CONDUIT&VAULTS CONTRACTOR CONTRACTOR <br /> FIBER TRAY AND CABLING CONTRACTOR CONTRACTOR <br /> REV 1 DESCRIPTION ' DATE <br /> WATER,SEWER.STORK.A/C ELECTRIC N/A A I ISSUED FOR 90%SUBMITTAL i 08292017 <br /> ENVIRONMENTAL N/A B ARE FO <br /> R FOR <br /> 92% SUBMITTAL I 01.05.2018 <br /> ENIVItONWENTAL DUE DILIGENCE VERIZON VERIZONPERMIT i 0 !ISSUED FOR 100%ESOS A 02.07.2018 <br /> GEOTECHNICN.INVESTIGATION,REPORT k SOUL BORINGS VERIZON CONTRACTOR <br /> FUEL TANKS SYSTEM VERIZON VERIZON CONTRACTOR CONTRACTOR { <br /> • <br /> FUEL TANK CERTIFICATION N/A <br /> FUEL TANK PERMRNG.REGISTRATION N/A <br /> TIMES COMPLIANCE STORM WATER WITH CONSTRUCTION MINTY N/A NETWORK COMPUANCESUBMIITALS I DATE <br /> PREUMINARY SUBMISSION . <br /> SPCC PLAN TUMOR VERIZON <br /> 30%SUBMISSION • <br /> TESTING t COMMISSIONING VERIZON 80%SUBMISSION <br /> TESTING OF NEW EQUIPMENT(FUNCTIONAL.TESTING&DEMONSTRATION) CONTRACTOR CONTRACTOR 90%SUBMISSION I 11222017 <br /> 100%SUBMSSION i 01.052018 <br /> DEFIITIONS. ORIGNAL ISSUE <br /> 1.FURNISH:PURCHASE AND SHIP ITEM TO SITE. ISSUED FOR CONSTRUCTION i . <br /> - ISSUED FOR PERMIT 02.07.2018 <br /> 2.PROVIDE:PURCHASE.SHIP AND INSTALL ITEM. <br /> RECORD SET(AS�BULTS) <br /> ....... 3.NSTALL:INSTALL FURNISHED ITEM. I <br /> PROJECT NO: STAMP <br /> 7170182 82F9 <br /> CAD DWG FLE: T4\\"ll R�EIT TEEREEDD <br /> RCHGIS <br /> DESIGNED BY: FA R LAWC <br /> DRAWN BY: LP <br /> CHECKED BY: RL ��22EMMLL AAddR''YZZ��1155��pp <br /> [_ COPYRIGHT: Tti VFiwA�MNGT 71 <br /> J <br /> SHEET TITLE <br /> VERIZON <br /> STANDARDS <br /> a REQUIREMENTS-4----,--i <br /> SHEET NUMBER G011 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.