Laserfiche WebLink
. 2 <br /> PROJECT SCOPE AND RFP BUILDING AUTOMATION GENERAL NOTES verlZOrV <br /> • <br /> THE PROJECT SCOPE OF WORK THAT THE CONTRACTOR SHALL BE RESPONSIBLE FOR IS DEFINED 1. THE CONTRACT DRAWINGS INDICATE APPROXIMATE LOCATIONS OF EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE THIS DRAWING WAS PREPARED SOLELY FOR THE USE <br /> BY RFP NO: FOR DETERMINING THE ACTUAL COMPONENT LOCATIONS BASED UPON THE INTENT OF THE DESIGN.SPECIFICATIONS.AND OF VERIZON WIRELESS AND MUST ONLY BE USED BY <br /> REQUEST FOR PROPOSAL FOR DRAWINGS. MODIFICATION OF PANEL LOCATIONS SHALL BE APPROVED BY ARCHITECT AND COORDINATED WITH ELECTRICAL VERIZON WIRELESS EMPLOYEES,CONTRACTORS,AND <br /> NV INCLUDES THE FOLLOWING ATTACHMENTS: TRADES. <br /> VENDORS WHILE PERFORMING THE WORK SHOWN ON <br /> THIS DRAW NY DRAINING.A OTHER USE OF THIS DRAWNG IS <br /> ATTACHMENT A M/W/OV BE QUESTIONNAIRE2. THE CONTRACT DRAWINGS ARE DIAGRAMMATIC AND DO NOT SNOW ALL COMPONENTS.MATERIALS.EXACT CABLE ROUTING. FORBIDDEN. <br /> ATTACHMENT B PROPOSED AGREEMENT. CONDUIT.AND OTHER CONSIDERATIONS THAT MAY BE REQUIRED FOR PROPER SYSTEM OPERATION. <br /> ATTACHMENT C BID PROPOSAL. COST BREAKDOWN. <br /> ATTACHMENT 0 PROJECT MANUAL(CONSTRUCTION DRAWINGS). 3. ALL MATERIAL AND EQUIPMENT USED IN THIS INSTALLATION SHALL BE NEW,AND SNAIL HAVE TIE APPROPRIATE LA.USING �U <br /> �. ATTACHMENT E OTHER RELATED BD DOCUMENTS. AND FACTORY MUTUAL(FM)APPROVAL ALL MATERIALS SHALL COMPLY WITH ALL APPLICABLE LOCAL AND NATIONAL CODES. <br /> ATTACHMENT F VERIZON NETWORK STANDARDS. STNDAROS,C AN REGULATIONS. D ORDINANCES. CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE A <br /> il <br /> PROJECT ADDENDUM ND CLM6RCATIONS. WITH MNIUFACRIREMS RECOMMENDATIONS UNLESS SPECIFICALLY STATED OTHERWISE. E MORRISON HERSHFIELD <br /> THE RFP AND ALL ASSOCIATED ATTACHMENTS MID DOCUMENTS SHALL DEFINE THE COMPLETE 4. CONTRACTOR SHALL PERFORM ALL WORK AND INSTALL AU.COMPONENTS IN A PROFESSIONAL AND WORKMANUE MANNER. <br /> PROJECT SCOPE OF WORK.CONTRACTOR SHALL BE RESPONSIBLE FOR COMPUANCE WITH ALL ALL FINISH WORK TO BE TRUE,LEVEL AND PLUMB.ALL JOINTS TO BE TIGHT AND CLEAN. 600 STEWART STREET,SUITE 200 <br /> DOCUMENTS AND IS SOLELY RESPONSIBLE FOR ALL WORK. SEATTLE,WA 98101 <br /> ALL DOCIMEHIS INCLUDED WITIHN THE PROJECT REQUEST FOR PROPOSAL,ARE REQUIRED FOR 5. ALL WORK SHALL BE PERFORMED IN FULL COMPUANCE WITH ALL APPUCABLE LOCAL AND NATIONAL CODES.STANDARDS AND PHONE:206268.7370 <br /> TIC COMPLETE PROJECT SCOPE OF WORK.TIE CONTRACTOR SHALL BE RESPONSIBLE FOR AU. w.APPU ABLE AMENDMENTS. WHERE REQUIRED BY THE AUTHORITY HAVING JURISDICTION,THE CONTRACTOR SHALL ISSUE www.monisonhershfield.com <br /> WORK (EQUIPMENT.MATERIAL,INSTALLATION.TESTING,ETC.) INDICATED IN ALL DOCUMENTS.THE PUBLIC NOTICES. <br /> RFP,ATTACHMENT A M/W/OV/BE QUESTIONNAIE,EXECUTED AGREEMENT(ATTACHMENT 8 6. ALL EA-485 MS/TP SEGMENTS SHALL BE DOUBLY TERMINATED BUS TOPOLOGY.PROVIDE CONDUIT AS REQUIRED AND WIRE DO NOT SCALE DRAWINGS. CONTRACTOR MUST <br /> _..... PROPOSED AGREEMENT),ATTACHMENT C BID PROPOSAL/COST BREAKDOWN.ATTACHMENT 0 ROUTES TO ACCOMMODATE. <br /> CONSULTANTS <br /> PROJECT MANUAL(CONSTRUCTION DRAWINGS).ATTACHMENT E OTHER RELATED BID DOCUMENTS. - VERIFY ALL DIM OR <br /> OOM AND ADVISE <br /> ATTACHMENT F VERIZON NETWORK STANDARDS AND PROJECT ADOEHDUMS AND CLARIFICATIONS 7. DEVICES SHALL BE INTERCONNECTED AS SHOWN ON THE NETWORK ARCHITECTURE DIAGRAM. OF ANY ERRORS TO WORK <br /> NON VARIATIONS OR <br /> MODIFICATIONS TO WORK SHOWN SHALL BE <br /> ARE COMPLEMENTARY TO EACH OTHER.THE DRAWING NUMBERING PER DISCIPLINE IS NOT B,PLEMENTED WITHOUT PRIOR WRITTEN APPROVAL <br /> INTENDED TO IMPLY SEGREGATION OF SUB CONTRACTOR WORK.CONTRACTOR SHALL ASSIGN ALL 8. 22 AWG BELDEN 3106A OR EQUIVALENT BE UTILIZED FOR ALL MSTP/BACRET NETWORK WIRING.CATSE OR CATS SHALL BE ALL PREVIOUS ISSUES OF THIS DRAWING ARE <br /> SUB CONTRACTOR WORK AND VERIZON WILL NOT ACCEPT ANY CHANGE ORDERS FOR INTERNAL. USED FOR SACHET P. <br /> REVISION. ALL <br /> CONTRACTOR WORK TENTS SUPERCEDEDWEI BY THE LATEST <br /> 9. ALL CONTROL SYSTEM LOCAL.OPERATING NETWORK WIRING INCLUDING BUT NOT UNITED TO MS/IP AND MODEMS NETWORK DRAWINGS AND sPEMORRISONs REMAIN THE <br /> CONTRACTOR.ALL BE RESPONSIBLE FOR DISTRIBUTING NDI RFP THE DOCUMENTS 1S THEIR SUB CORPORATION.OF MORRISON HERSHFIELD <br /> CONTRACTORS.ALL RFP DOCUMENTS ARE REQUIRED TO INDICATE PROJECT SCOPE OF WORK. CABLE SHALL INCIIDE ONE DESIGNATED SPARE CABLE TO BE PULLED ALONG SIDE THE PRIMARY CABLE. <br /> PARTIAL SUBCONTRACTOR DOCUMENT PACKAGES ARE HIGHLY pSOQ1RACED. 10. USE 18 GAUGE.STRANDED,SHIELDED.TWISTED PAIR WIRE FOR ALL TWO CONDUCTOR SENSOR WIRING. D <br /> THE CONSTRUCTION DRAWINGS.REFERENCED STANDARDS,VERIZON AIRELESS STANDARDS, OTHER <br /> RFP ATTACHMENTS AND'THE TERMS AND CONDITIONS ARE COMPLIMENTARY OF ONE ANOTHER.IN 11. SPLICING OF COMMUNICATION CABLE BETWEEN DEVICES IS NOT ALLOWED. <br /> THE EVENT OF CONFLICT BETWEEN'THE DRAWINGS.REFERENCED STANDARDS.VERIZON WIRELESS <br /> STANDARDS.OTHER RFP ATTACHMENTS OR TERMS AND CONDITIONS.THE ARCHITECT/ENGINEER 12. ALL INTELLIGENT CONTROLLERS RESIDING ON THE BACNET NETWORK MALL BE BR COMPLIANT FOR COMPLETE <br /> SHALL BE CONTACTED FOR FORMAL INTERPRETATION OF THE REQUIREMENT.THE CONTRACTOR MEROPERABILIY. <br /> SHALL BE DEWED TO HAVE PROVIDED THE MOIla DETAILED AND EXPENSIVE INTERPRETATION OF <br /> THE REOUIRELENT.ANY WORK INSTALLED IN CONFLICT WITH THE ARCHITECT/ENGINEER 13. INSTALL THE QUANTITY OF EIA-485 MS/TP/ETHERNET JACKS AS INDICATED ON THE FLOOR PLAN AND ARCHITECTURE <br /> INTERPRETATION SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO DIAGRAM.EXACT PLACEMENT MAY VARY FROM WHAT IS SHOWN.NETWORK JACKS SHOULD BE LOCATED TO ALLOW EASY w <br /> EXPENSE TO OWNER. ACCESS TO FIELD BUS FOR TROUBLESHOOTING OF DIGITAL CONTROLLERS.INSTALL JACKS WITHINDCP.NCP CR OTHER <br /> 411111> <br /> ASSIGNMENT OF WORK:THE AGREEMENT BETWEEN THE CONTRACTOR AND THE OWNER IS A ENCLOSURE. THERMOSTATS WITH INTEGRAL MS/IP JACKS MAY BE USED HOWEVER MAY NOT USE THE MS/TP BUS FOR Z <br /> SINGLE PRIME CONTRACT.THE CONTRACTOR ISRESPONSIBLE FOR THE COMPLETE SCOPE OFTRANSMISSION OF TEMPERATURE/HUMDITY DATA TO ASSOCIATED EQUIPMENT(VAV BOX.AMU,ETC). C g CONTROL PANELS SHALL HAVE SUFFICIENT Q1AMi1TY OF CONTROLLERS. O <br /> WORK INCLUDING THE COORDINATION OF SUBCONTRACTORS.NE CONSTRUCTION DOCUMENTS DO - m M J <br /> 0 <br /> NOT DELINEATE BETWEEN SUBCONTRACTORS AND ANY INFERENCE TO DIVISION OF WORK IS A 14. INSTALL NETWORK TERMINATORS WITHIN CONTROL PANELS OF ADJACENT END OF LINE CONTROLLERS. m 4, Q <br /> SUGGESTION ONLY.NEITHER THE OWNER NOR THEARCHITECT/ENGINEER WILL OFFER.AT ANY <br /> TIME.ANY OPINIONS OR PROPOSED RESOLUTIONS CONCERNING ASSIGNMENT OF WORK TO 15. CONTROL POINTS.AND NETWORK VARIABLE W,E, o w co <br /> 0 <br /> RESOURCE COUNT TO SUPPORT BOTH THE PHYSICAL AND NETWORK I/O REQUIREMENTS OF EACH DEVICE DESIGNATED FOR O� Q Q � <br /> CONC ACTOR ORS.IN THE EVENTE C MISSING OR THE CONTRA SCOPE PROVIDED RESPONSIBLE BY THE THAT PANEL. w , Z > w <br /> TOR OR ANY OF THE SUBCONTRACTORS, CONTRACTOR SHALL BE FOR <br /> THE WORK. <br /> 16. STAND ALONE OPERATION IS REQUIRED FOR ALL EQUIPMENT. SEQUENCE OF OPERATION MUST NOT DEPENDENT ON - O w Q <br /> LOCAL OPERATING NETWORK COMMUNICATIONS EXCLUDING OUTSIDE AIR CONDITION VARIABLES REQUIRED FOR USE BY O ED I- <br /> MULTIPLE CONTROLLERS. EACH PIECE OF MECHANICAL.EQUIPMENT MUST BE CONTROLLED BY A SINGLE BACNET CONTROLLER. Z M CO 5 S.- <br /> REMOTE I 0 MODULES SHALL NOT BE ALLOWED FOR CONTROL POINTS OR POINTS WINCH ARE REQUIRED TO ACHIEVE THE �_ F Z 1-' _ <br /> SEQUENCE OF OPERATION WITHOUT THE USE OF A SACHET ROUTER AND SEPARATE SUB NET. <I- H w <br /> 17. CONTROL PANELS SHOWN ON DRAWING ARE SCHEMATIC ONLY AND ARE NOT TO SCALE.CONTROLS CONTRACTOR SHALL C 00° W M W <br /> PROVIDE PANELS AS NECESSARY TO HOUSE THE REQUIRED CONTROL EQUIPMENT.CONTRACTOR SHALL COORDINATE EXACTZri lij re-13 N > <br /> PLACEMENT OF PANELS WITH SURROUNDING EQUIPMENT. I_0. ill w <br /> 18. CONTROLS CONTRACTOR SHALL VERIFY NODE COUNT PER NETWORK AND CONFORM TO THE ARCHITECTURE GUIDEUNES rn > <br /> SPECIFIED BY THE MANUFACTURER OF THE NETWORK CONTROLLER AND BY ANSI/AWtAE BACNET STANDARDS 135. > y <br /> 19. INSTALL THE CENTER OF ALL CONTROL PANELS AT 60'TYPICAL ELEVATION WHEN FEAS6l.E. LL1 <br /> 20. GROUND ALL SHIELDS AT ONE END ONLY TO AVOID GROUND LOOPS.TERMINATE GROUND CONDUCTORS FIRST. TERMINATE <br /> AT EQUIPMENT WHEN FEASIBLE. <br /> 21. INDICATED ROUTING OF EIA-485 MS/TP NETWORK WIRING IS SCHEMATIC IN ROUTING ONLY. ACTUAL ROUTING OF WIRING <br /> SHALL BE DETERMINED IN THE FIELD BY CONTROLS CONTRACTOR. RESTORE AU.DISRUPTED SURFACES BACK TO ORIGINAL. <br /> FINISHED CONDITIONS.THE CONTRACTOR SHAU.PROVIDE LABOR AND MATERIAL.FOR ALL DRYWALL.FLOOR.CONCRETE. <br /> CARPET.PAINT AND SIMILAR'FINISH'SURFACES AFFECTED BY THE SCOPE OF THIS PROJECT. <br /> _ 22. FELD VERIFY ALL.THERMOSTAT UNFORESEEN WALL SPACE RESTRICTIONS. <br /> WIRING RESTRICTIONS,AND THERMAL LOCATIONS <br /> NTERFERENCE FROM EQUIPMENTHAND OR suNucHr.NOTIFY OWNER OF AU.CONFUCTS <br /> PRIOR TO INSTALLATION. REV I DESCRIPTION ( DATE <br /> A J ISSUEDFORS0%SUBMITTAL OB.282017 <br /> 23. FDE TERMS OR THE DEFINED INR AND CONTROLS NGS AND DIVISION SPECIFICATIONS. <br /> IT CONTRACTOR. <br /> CONTRACTORCONSTRUED ON TIE SAME CONTRACTOR B IRE-ISSUED FOR 90%SUBMITTAL ; 11222017 <br /> THE BAS C ?ISSUED FOR 100%EOS SUBMITTAL i 01.052018 <br /> 24. ALL BAS CONTROL DEVICES INCWDING NETWORK CONTROLLERS.DIGITAL CONTROL PANELS,24V POWER SUPPLIES.AND 0 I ISSUED FOR PERMIT 02.072018 <br /> WORKSTATIONS SHOWN ON BAS01 TO BE ON THE CRITICAL COMMUNICATION BUS SHALL BE ON CRITICAL./INVERTER POWER <br /> CIRCUITS. 7 <br /> • <br /> 25. ALL WIRING SHALL BE IN 3/4'EMT REGARDLESS OF LOCATION. • <br /> 26. UL 555 DAMPERS SHALL BE PURCHASED WITH APPROVED UL LISTED ACTUATORS. I <br /> NETWORK COMPLIANCE SUBMITTALS ' DATE <br /> 27. ALL DAMPER ACTUATORS SHALL BE BEUMO. PREUMINARY SUBMISSION • <br /> 28. CRITICAL POINTS AND ALARMS MALL.BE WIRED NORMALLY CLOSED SO THAT A LOSS OF POWER WILL INDICATE AN ALARM 30%SUBMISSION <br /> • <br /> CONDITION OR RELEASE TO NORMAL.OPERATION. 60%SUBMISSION <br /> 90%SUBMISSION i 11.222017 <br /> 29. CONTRACTOR SHALL.COORDINATE EQUIPMENT PURCHASES WITH THE POINT USTS N THESE DOCUMENTS. CONTRACTOR <br /> SHALL BE REQUIRED TO ADD HARDWARE AND LOGIC TO MEET THE POINTS IN THESE DOCUMENTS. 100%SUBMSSION 01.052016 <br /> ORIGNAL ISSUE <br /> 32. AU.NEW CONDUIT AND WIRING SHALL,NOT BE RAN OVER TECHNICAL SPACES,UTILIZE HALLWAYS AND NON-TECHNICAL ISSUED FOR CONSTRUCTION <br /> SPACES FOR ROUTING OF ALL NEW CONDUIT AND WIRE PATHS. __. <br /> ISSUED FOR PERMIT 02.072018 <br /> .. 33. CONTRACTOR SHALL PROVIDE CONTROL RELAYS,AND MAKE 12OV POWER CONNECTIONS TO COMBINATION FIRE/SMOKE RECORD SET(AS-SULTS) <br /> DAMPERS.POWER WIRING HOME RUNS AND DISCONNECTS FOR DAMPERS ARE PROVIDED UNDER THIS CONTRACT. THE • <br /> CONTROL OF THE COMBINATION FIRE/SMOKE DAMPERS IS BY THE B.AS. PROJECT NO: STAMP <br /> 34. THE BAS CONTRACTOR SNAIL BE REQUIRED TO PROVIDE 120V POWER TO ALL FIELD DEVICES(ACTUATORS.SENSORS. ETC.) 7170182 ,,i; <br /> WHICH REQUIRE SUCH POWER. CAD DWG ME: ,T% 'i': <br /> c^ <br /> DESIGNED BY: FA <br /> 35. THE BAS CONTRACTOR IS 100%RESPONSIBLE FOR PROVIDING OR COORDINATING WITH PURCHASING TRADE THE SUPPLY OF i <br /> NETWORK OR RELAY INTERFACE CARDS, GATEWAYS,MICROPROCESSORS.ETC.TO ACCOMPLISH THE CONTROL.AND MONITORING DRAwr BY: LP y ; ; <br /> INTENT OF THOSE DRAWINGS. CHECKED BY: RL <br /> COPYRIGHT: //P%�2STL11�.=�, <br /> '2018..•,• N: . .. 'Os' <br /> SHEET TITLE <br /> - BUILDING AUTOMATION <br /> GENERAL NOTES <br /> C3°1(7# <br /> SHEET NUMBER <br />