My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
202 MADISON ST 2021-04-01
>
Address Records
>
MADISON ST
>
202
>
202 MADISON ST 2021-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 9:00:42 AM
Creation date
4/1/2021 9:00:39 AM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/2/2021 Page 1 <br /> City of Everett <br /> 7:06:05AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2011-143 Site Address 202 MADISON <br /> Applied 11/23/2020 Applicant Christopher Tack Lot <br /> Approved 11/24/2020 Owner Christopher Tack Block <br /> Issued 11/24/2020 Contractor Christopher Tack Tract <br /> Parent Permit No. Description New panel box installation <br /> Notes Installation of a 100 amp panel box with multiple outlets and a 50 amp panel box.2x 30 amp RV outlets, <br /> lx 50 amp RV outlet,3x 20 amp quad receptacles.There will also be a 50 amp panel box supplying <br /> power to a shed which will contain 2x 20 amp quad receptacles(inside shed),lx duplex(exterior of <br /> shed),and a 15 amp for interior lights and outdoor light.I recently completed a plumbing installation in <br /> the same trench where the electrical is being installed(permit is completed/closed). <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 2/23/2021 2/23/2021 ELEC 06-ROUGH SKB CORRECTION eTRAKiT Inspection 2/22/2021 8:50 AM Christopher Tack <br /> IN Request I'm ready inspection of the 100 amp panel <br /> as well as the new 70 amp and 50 amp sub <br /> panels that are connected to it.The trench is <br /> open and ready for inspection.The rough-in <br /> wiring is complete for the"shed" <br /> Contact Name:Christopher Tack <br /> Site Address:202 MADISON <br /> Phone:9893261488 <br /> e-Mail:chris tack@mac.com <br /> (2/23/2021 3:50 PM SKB) <br /> skb changed Inspection Type from ELEC <br /> 09-FINAL to ELEC 06-ROUGH IN <br /> (2/23/2021 3:52 PM SKB) <br /> Bundling of NM cables is not allowed.No <br /> more than 3 NM cables are allowed in <br /> drilled holes. <br /> 2/23/2021 2/23/2021 ELEC 02-GROUND SKB APPROVAL (2/23/2021 1:58 PM SKB) <br /> WORK OK ditch from existing Stub up to RV <br /> pedestal to shed. <br /> 3/1/2021 3/1/2021 ELEC 09-FINAL TJJO APPRVD-PERK eTRAKiT Inspection 2/28/2021 12:33 PM Christopher Tack <br /> Request Fixed cable bundle issue noted in last <br /> inspection.All outlets and switches <br /> installed&covers are in place.I'm ready for <br /> final inspection <br /> Contact Name:Christopher Tack <br /> Site Address:202 MADISON <br /> Phone:9893261488 <br /> e-Mail:chris_tack@mac.com <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.