Laserfiche WebLink
INSPECTION REPORT <br /> A, <br /> -.a Date Permit: &(g0 ^ 7 <br /> Contractor: <br /> Owner:Site Address: 1 00 / p CI— Cie.4, 1► <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid El Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> El Footing drains tEl Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. El VIOLATION 111 <br /> EI .l?NABLETOPERFORM INSPECTION: <br /> U fiA/LL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> /7 5�l.,.eJe-, (Q eon 5 Acs--- <br /> Inspector:A70 Date: <br /> EIR(10/06) DATABAR,INC. <br />