Laserfiche WebLink
8/7/2020 Page <br /> City of Everett <br /> 2:16:12PM <br /> INSPECTION ACTIVITY REPORT <br /> 3/4/2020 3/4/2020 BLDG 15-FINAL KMK CORRECTION Need fire final before 3/2/2020 1:17 PM Alex Leighton <br /> building final <br /> Contact Name:Alex Leighton <br /> Site Address:607 RIVERSIDE RD <br /> Phone:2064965157 <br /> e-Mail:alexl@sierraind.com <br /> 3/6/2020 3/6/2020 FIRE 02-FINAL BRA APPROVAL eTRAKiT Inspection 3/5/2020 2:09 PM Alex Leighton <br /> Request <br /> Contact Name:Alex Leighton <br /> Site Address:607 RIVERSIDE RD <br /> Phone:2064965157 <br /> e-Mail:alexl@sierraind.com <br /> (3/5/2020 3:34 PM SAG) <br /> Contact above. Sprinkler and fire alarm <br /> done. Building did walk through. Just a <br /> quick final and get contact info. Look for <br /> signage and striping inside and out. It has <br /> been a confusing project with multiple B <br /> permits for shell and core plus TI space <br /> concurrent <br /> 3/9/2020 3/9/2020 BLDG 15-FINAL KMK APPROVAL Subject to: (see 3/6/2020 11:39 AM Alex Leighton <br /> notes) <br /> Contact Name:Alex Leighton <br /> Site Address:607 RIVERSIDE RD <br /> Phone:2064965157 <br /> e-Mail:alexl@sierraind.com <br /> (3/9/2020 3:32 PM KMK) <br /> Complete final on shell(B1801-035) <br /> See correction on public works permit PW <br /> 1801-037 dated 8/30/19: <br /> 1.Fire final <br /> 2.As-builts <br /> 3.Easements <br /> 4.Warranty Bonds <br /> 6/3/2020 6/3/2020 BLDG 15-FINAL TMB APPRVD-PERN <br /> 8/7/2020 8/7/2020 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 <br />