My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 RIVERSIDE RD AMAZON 2021-04-01
>
Address Records
>
RIVERSIDE RD
>
607
>
AMAZON
>
607 RIVERSIDE RD AMAZON 2021-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 12:14:05 PM
Creation date
4/1/2021 12:09:13 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
607
Tenant Name
AMAZON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/9/2019 Page <br /> City of Everett <br /> 7:29:53AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1907-219 Site Address 607 RIVERSIDE RD <br /> Applied 7/31/2019 Applicant Lot 5 <br /> Approved 8/7/2019 Owner PANATTONI DEVELOPMENT Block <br /> Issued 8/12/2019 Contractor DARANA HYBRID INC Tract <br /> Parent Permit No. M1907-144 Description ELECTRICAL COMPONENTS INSTALLATION OF CONVEYOI <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 8/26/2019 8/26/2019 ELEC 09-FINAL SKB NOT READY AM inspection requested <br /> Phone:615-268-6179 <br /> (8/26/2019 11:21 AM SKB) <br /> Field evaluation is required as told Forman <br /> two weeks ago. <br /> 8/29/2019 8/29/2019 ELEC 09-FINAL SKB NOT READY PM inspection requested <br /> 615-268-6179 <br /> (8/29/2019 10:47 AM SKB) <br /> Field evaluation not yet complete checking <br /> loads for labeling to check over current <br /> feeding conveyors at Cetera waiting for <br /> labels. <br /> 8/30/2019 8/30/2019 ELEC 09-FINAL SKB PARTIAL APPR 615-268-6179 <br /> (8/30/2019 10:37 AM SKB) <br /> Partial final conveyor one and conveyor two <br /> pending reevaluation of full load from PSE <br /> on project number F190648. <br /> 9/24/2019 9/24/2019 ELEC 09-FINAL SKB NOT READY 615-268-6179 Joel <br /> (9/24/2019 10:19 AM SKB) <br /> No update on field evaluation. <br /> 10/8/2019 10/8/2019 ELEC 09-FINAL SKB APPRVD-PERN <br /> 10/8/2019 10/8/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CRWS YS TEM, <br />
The URL can be used to link to this page
Your browser does not support the video tag.