EVERETT TEMPORARY EROSION AND SEDIMENT CONTROL NOTES: � `� 3 <br /> � � <br /> Q ¢ <br /> 1. APPROVALOFTHISEROSION/SE�IMENTATIONCONTROL �ESC) PLANDOESNOTCONSTINTEANAPPROVALOFPERMANENTROAD <br /> OR DRAINAGE �ESIGN (E G. SIZE AND LOCATION OF ROADS. PIPES. RESTRICTORS. CHANNELS, ftETENTION FACILITIES, UTI�ITIES�. � �, <br /> 2. THE IMPLEMENTATION OF THESE ESC PLqNS AND THE CONSTRUCTION, MAWTENANCE, REPLACEMENT, ANO UPGRADING OF � — <br /> THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANTICONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND <br /> APPROVEDAND VEGETATIONILANDSCAPING IS ESTABLISHE�. <br /> 3. THE BOUN�ARIES OF THE C�EARING LIMITS SHOWN ON THIS PLAN SHALL BE QEARLY FLAGGED IN THE FIELD PRIOR TO �` a <br /> CONSTRUCTION. �UftING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGE� CLEARING LIMITS SHALL BE V � `—' <br /> PERMITTED. THE FLAGGING SHALL BE MAWTAINED BV THE APPLICANi�CONTRACTOft FOR THE DURATION OF CONSTRUCTION. � � <br /> 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AN� GRApING m r g <br /> ACTNITIES. AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE ` � <br /> SVSTEM, ROApWAVS, OR VIOLATE APPLICABLE WATER pUALITY STANDARDS. <br /> 5. THEESCFAQLITIESSHOWNONTHISPL4NARETHEMINIMUMRE�UIREMENTSFORANTICIPATEDSITECONDITIONS. OURINGTHE <br /> CONSTRUCTION PERIOD. THESE ESC FAQLITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTSAN�TO <br /> ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO N0T LEAVE THE SITE. <br /> 6. THE ESC FAGLITIES SHALL BE WSPECTED ROUTINELV AND MAINTAWED BV THE APPLICANT/CONTRACWR W ENSURE THEIR <br /> CONTINUED FUNCTIONING, ESPECIALLV AFTER STORM EVENTS. � S AN �. _ <br /> Z THE ESC FACILITIES ON INACTNE SITES SHALL BE INSPECTED AN� MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 `�1 oF w ��`p <br /> HOURSFOLLOWINGAMAJORSTORMEVENT. s��e�� o� <br /> B. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPEO CATCH BASW. ALL <br /> CATCH BASINS AN� CONVEYANCE LWES SHALL BE CLEANE� PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FL115H <br /> SEDIMENT LAOEN WATER INTO THE DOWNSTREAM SVSTEM. °,�, R �s.az 9 ='v <br /> 9. STABILIZEO CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAMTAINED FOR THE FSS�oHpti EO�� <br /> DURATION OF THE PROJECT. ADDITIONAL MEASURES MAV BE REpUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN <br /> FOR THE DURATION OF THE PROJECT. <br /> 06-05-2018 <br /> 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET 0.EANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED <br /> BMPS FAIL <br /> 12 BARE AN�IOR DISTURBED SOILS SHALL REMAIN UNCOVEREO ANOIOR 11N5TA81LIZED FOR NO MORE THAN 2 DAVS FROM OCTOBER <br /> 1 THROUGH APRIL 30, AND FOR NO MORE THAN ] DAYS FROM MAV 1 THROUGH SEPTEMBER 30. <br /> EVERETT STORM DRAINAGE NOTES: <br /> 1. NO PART OF THE DRAINpGE SVSTEM SHALL BE CWERED. CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN INSPECTEO, TESTED, <br /> AND ACCEPTED BV THE CITV OF EVERETT. <br /> 2 ALL WORK AND MATERIAL SHALL CONFORM TO THE CITV OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND _ <br /> SGECIFICATIONS AND THE WS�O7IAPWA STANDARD SPECIFlCATIONS FOR ROA�. BRIDGE, AND MUNICIPAL CONSTRUCTION <br /> (Ct1RRENT EDITION�. <br /> 3. APPROXIMATE LOCATIONS OF E%ISTING UTILITIES HAVE BEEN OBTAMED FROM AVAILABLE RECOR�S ANO ARE SHONM FOR <br /> CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFlCATION OF LOCATIONSANDTOAVOIO DAMAGE TOANV <br /> AODITIONAL UTILITIES SHOWN. IF CONFLICTS WITH E%ISTING UTILITIESARISE DURING CONSTRUCTION, THE WNTRACTOR SHALL <br /> NOTIFV THE PUBLIC WORKS MSPECTOR AN� ANV CHANGES REQUIRE� SHALL BE APPROVED BY THE CITV ENGINEER PRIOR TO � <br /> COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. � <br /> 4. ALL STORM SVSTEMS WITHIN THE PUBLIC RIGHT-0FWAV OR M EASEMENTS MUST BE STAKED BV SURVEY FOR LINE AND GRADE <br /> PRIOR TO STARTING CONSTRUCTION. J <br /> 5. ALL CATCH BASIN GRATES MUST BE STENGLED OR STAMPE� "DUMP NO WASTE DRAMS TO STREAM, LAKE RIVER, PUGET SOUND. U <br /> OR WETLAND" CHOOSE APPROPRIATE FEATURE FOR THE PROJECT. � <br /> � <br /> Q <br /> U <br /> � <br /> � <br /> � <br /> EVERETT SEWER NOTES: ~ <br /> W�/ <br /> A. ALLWOftKANDMATERIAL55HALLCONFORMTOTHECITYOFEVERETTSTAN�ARDSANDWSDOT/APWASTANDARD LL M <br /> SPECIFICATIONS. � <br /> N <br /> B. NO PART OF THE SANITARV SEWER SVSTEM SHALL 6E COVERED. CONCEALEO OR PUT INTO USE UNTIL IT HAS BEEN TESTED. \ j m <br /> INSPECTED. AN�APPROVE� BYTHEQTVWSPWTOR. W } � <br /> C. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAMED FROM AVAILABLE RECOR�S ANO ARE SHONM FOR m <br /> CONVENIENCE THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFlCATION OF LOCATIONS AND TO AVOI� �AMAGE TO ANY W � O w <br /> ADDITIONAL UTILITIES NOTSHOWN. IF CONFLICTS WITH E%ISTWG UTILITIES ARISE �URING CONSTRUCTION, THE CONTRACTOR <br /> SHALL NOTIFV THE PUBLIC WORKS INSPECTOR AND ANV CHANGES REOUIRED SHALL BE APPROVE� BV THE CITV ENGINEER PRIOR o CL <br /> TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. � � ^ � <br /> D. ALL SEWER MAM E%TENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR W EASEMENTS MUST BE STAKED 8V SURVEV FOR LINE ANO a Z c W <br /> GRADE PRIOR TO STARTING CONSTRUCTION. <br /> a�nsau <br /> � issuErovwr�smucnoHaeo>zoie <br /> EVERETT WATER NOTES: � <br /> A. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BV MEANS OF AN APPROVED BACKFLOW PREVENTION �EVICE <br /> PRIOR TO SATISFACTORV FWSHING, TESTING. DISINFECTION. AND RECEIPT OP SATISFACTORV BACTERIOLOGICAL TEST RESULTS. <br /> B. CONNECTIONS TOAND TAPS ON EXISTING MAINS WILL BE MADE BV THE PUBLIC WORKS DEPARTMENTATTHE �EVELOPER'S p5,0]2018 <br /> E%PENSE. THE PUBI.IC WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUS WESS DAVS NOTICE FOR EACH CONNECTION. THE <br /> PUBLIC WORKS DEPARTMENT SHALL THEREAFTER DETERMME THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE MADE. <br /> C. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. 14249 <br /> D. A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE QTY PRIOR TO THE START OF CONSTRUCTION. THE CITY OF EVERETT <br /> PUBLICWORKSCONSTRUCTIONDIVISIONMUSTBENOTIREDATLEAST24HOURSPRIORTOCOMMENCEMENTOFCONSTRUCTION. vmenRJB oev�SPIJFR <br /> E. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFV THE PUBLIC WORKS DEPARTMENT OF A PERSON WHO oerJFR <br /> CAN BE CONTACTED REGAROING PROBIEMS DUR WG CONSTRUCTION ON A 24 HOUR BASIS. <br /> E MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 181NCHE5 VERTICAL SEPARATION BETNEEN POTABLE .SND NON-POTABLE GENERAL NOTES <br /> I CONVEVANCE SVSTEMS. <br /> G. ALL CITY OF EVERETT VA�VES SHALL BE OPERATED BV PUBLIC WORKS DEPARTMENT PERSONNEL ONLV. ALL VALVES. NEW AND <br /> EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br /> 3 <br /> b <br /> i <br /> BCRA � <br /> � � e�o�a��.,o, ��, �.� �. a - <br /> � � <br /> � <br /> o Know whae's below. C O . 0� <br /> < <br /> Call b.ro„yo„ a�9. <br /> ISSUE FOR CONSTRUCTION <br /> IF SHEETMEASUFES LE55 iHAN Y4NJ6'.IiISA REDUCEO PftINL REOUCE SCAIf ACCORDINGLY <br />