Laserfiche WebLink
• <br /> um, <br /> EVERETT WAC 296-46B-900: ELECTRICAL PLAN REVIEW <br /> DIRECTIONS: Read the WAG section below to determine if plan review is required or not required Then select the box next to(a) to <br /> AO City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b) and(c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application, <br /> *If item (a)-(ii,iii, or v)is selected,the work must also comply with section(a)-(vii).See arrow flow chart below. <br /> (3) Electrical plan review. <br /> ✓ (a) Electrical plan review is not required for: <br /> ❑ (i)Low voltage systems; <br /> ,F-- ❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project,provided there is not a corresponding increase in the available fault current in any feeder. <br /> _ (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> t j does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517,2;or <br /> (C)A required fire pump system <br /> J (v)Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (t))Service or feeder load calculations are increased by 5%or less. <br /> (vi) Electric power production source(s)such as solar photovoltaic,fuel cell,or wind electric system(s)with a total <br /> (--1 rating of 9600 watts or less. <br /> (vii)For installations in (a)(ii),(iii),and(v)of this subsection to be considered,the following must be available <br /> ❑ to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed;and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE:Electrical plan review is not required for"Medical,dental,and chiropractic clinic"of which is a clinic or <br /> [] physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii) <br /> -- (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> — occupancies defined in this chapter. <br /> i l (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun, <br /> Table 9o9.1 Table 900.2 <br /> Health or Personal Care Facilities <br /> ,..„.�_m.� ...,..- Educational and Institutional Facilities,Places of Assembly,or Other Facilities <br /> s aRI or Personal Care Facility Plan Review iew <br /> Tyise Requtre<I Educational Institutional,or Plan Rev iew <br /> '� other Facility Types Required <br /> Vtii <br /> L.1 _ t5 �i .Ell ,:•�?(�13 _ ,,, S..« <br /> I.:r.'.S e:I iP 4$i <br /> `c =r:_. »r „_,...•..___.. ;•r, Notes to Tables 900-T and 9002. <br /> ...,, ..ircrred cc do e•stt"cal."•-:;,r.U:;^.5� <br /> ...._... ..._....a........ <br /> _.n _, not <br /> a5 <br /> •es ds t o rehac ,E3 PERMIT# Page 2-Plan Review <br />