Laserfiche WebLink
12/2/2020 Page <br /> City of Everett <br /> 10:03:00AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2009-120 Site Address 1927 RUCKER AVE <br /> Applied 9/21/2020 Applicant Devan Miller Lot <br /> Approved 9/22/2020 Owner Jeremy Lerond Block <br /> Issued 9/24/2020 Contractor OWNER Tract <br /> Parent Permit No. Description Add wiring for lighting fixtures,add outlets,add wiring fo <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 10/19/2020 10/19/2020 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 10/15/2020 9:37 PM Jeremy Lerond <br /> Request <br /> Contact Name:Jeremy Lerond <br /> Site Address: 1927 RUCKER AVE <br /> Phone:4252446749 <br /> e-Mail:jeremy.lerond@gmail.com <br /> (10/19/2020 4:32 PM SKB) <br /> Nail on boxes and properly install wiring at <br /> washer and dryer you cannot use fishing <br /> methods when the walls are open.Delete <br /> abandon wiring.Ground all metal boxes. <br /> You must have 6 inches of conductors <br /> inside of the box.NM sheathing must <br /> extend all the way into the box.Extend <br /> lighting boxes through combustible <br /> materials in the ceiling.Install another <br /> conduit for floor heat thermostat. <br /> (10/19/2020 4:33 PM SKB) <br /> Nail on boxes and properly install wiring at <br /> washer and dryer you cannot use fishing <br /> methods when the walls are open.Delete <br /> abandon wiring.Ground all metal boxes. <br /> You must have 6 inches of conductors <br /> inside of the box.NM sheathing must <br /> extend all the way into the box.Extend <br /> lighting boxes through combustible <br /> materials in the ceiling.Install another <br /> conduit for floor heat thermostat. <br /> 10/22/2020 10/22/2020 ELEC 06-ROUGH SKB APPROVAL as noted. 10/20/2020 3:42 PM Jeremy Lerond <br /> IN <br /> Contact Name:Jeremy Lerond <br /> Site Address:1927 RUCKER AVE <br /> Phone:4252446749 <br /> e-Mail:jeremy.lerond@gmail.com <br /> (10/22/2020 11:25 AM SKB) <br /> Electrical rough in OK pending plumbing <br /> inspection passing the first time on the <br /> 28th.If any corrections are written on the <br /> plumbing permit a reinspection of electrical <br /> must occur. <br /> 10/28/2020 10/28/2020 ELEC 06-ROUGH SKB APPROVAL floor heat cable in 10/27/2020 11:12 AM Jeremy Lerond <br /> IN bathroom Inspection of installed in-floor heating <br /> Contact Name:Jeremy Lerond <br /> Site Address: 1927 RUCKER AVE <br /> Phone:4252446749 <br /> e-Mail:jeremy.lerond@gmail.com <br /> INSP12 <br />