Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> Our analysis scope of work for this project will include the following for electrical equipment in the Everett Transit <br /> Operations Center and Everett Transit Maintenance Center: <br /> 1.The Short Circuit Current,Breaker Coordination,and Arc Flash Hazard analysis studies will be analyzed by SKM <br /> software.Existing breakers will be coordinated to meet the maximum PPE Category Level 2 requirements(or as <br /> close as possible).A report will be generated. <br /> 2.One(1)Hardcopy of the report will be provided.This copy will also contain a USB Drive which will contain the <br /> entire report in PDF format as well as the SKM project files. <br /> 3.Arc Flash labels will be provided for installation by others.4.Breaker setting adjustment recommendations,as <br /> required,will be provided. <br /> Page 12 <br /> (Form Approved by City Attorney's Office January 7,2010,updated November 4,2020) <br />