My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3781-20
>
Ordinances
>
Ordinance 3781-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 11:34:50 AM
Creation date
4/16/2021 11:33:38 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3781-20
Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD PROCUREMENT POLICY& FEDERAL EMERGENCY CONTRACTING <br /> City employees will make efforts, within authorized budget limits, to ensure those activities <br /> address and embrace the goals of preservation of natural resources, reduction of environmental <br /> impact, and increasing energy and water efficiency. Employees are encouraged to consider the <br /> life cycle cost of a commodity as part of the evaluation during a Request for Proposal process. <br /> Where relevant, suppliers may be asked to state their reuse and recycling policies and practices <br /> in their proposals, and when so stated, such policies and practices will be considered in the <br /> award decision. <br /> 4.14 TRADE-INS <br /> The value of a trade-in will not be included when determining which purchasing threshold <br /> applies. However, the trade-in price will be considered when determining the lowest responsive <br /> and responsible offer. <br /> 4.15 VALUE ENGINEERING <br /> The City is encouraged to use value engineering clauses in contracts for construction projects of <br /> sufficient size to offer reasonable opportunities for cost reductions. <br /> Page 20 of 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.