Li II <br /> CHANGE ORDER# <br /> EVERETT 0002 <br /> WASHINGTON — — - <br /> Project(Procurement)Number: Small Works Roster Project Title: <br /> IFQ 2020-036R1 High Security Fence — Smith Street <br /> Description of Change: (Attach contractor's change proposal and cost schedule)(Attach Price cr Cost Analysis) <br /> LOCATION: 3600 and 3700 Smith Street, Everett, WA <br /> This change order encompasses a net increase of fifteen (15) calendar days for project completion. The <br /> extension in completion time is a result of a discovery by the Contractor that the required gates for the project <br /> were not included in the shipment delivered to the project site as was expected, The gates are now scheduled <br /> for an anticipated delivery on April 2.nd, and once delivered the Contractor will be at the project site within 1 — 3 <br /> days to install and wrap up the project. The Contractor is estimating project completion on or around April 7th. <br /> There is no change in cost for this change order. <br /> The changes described above result In the following adjustment(s)In price and contract time (in calendar days). <br /> Completion <br /> Contract Time 8 Completion Date Prior 90 Date Prior <br /> 'Total Project Price Prior to this Change .p7�1,2$6.32 to This Change 3/28/21 <br /> Not(Increase)or(Decrease)Resulting frotn Net(Increase)or(Decrease)Resulting 15 <br /> $0•Qfl this Change+ from this Change <br /> Completion <br /> Contract Time&Completion Date 1 05 pate Alter <br /> 'Total Project Price Including this Change $7 i,2$6.32 Including This Change to A 1 <br /> By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent <br /> described in the above "Description of Change" and that the compensation shown above represents complete <br /> compensation for all such changes, including all direct and indirect costs and impacts. The City of Everett and the <br /> Contractor further agree that Contract time shall be adjusted to the extent shown above. This Change Order only <br /> changes the contract between City of Everett and the Contractor to the extent explicitly provided in this Change Order. <br /> CONTRACTOR CITY OF EVERETT <br /> Perimeter Security Group LLC City of Everett <br /> 7488 N Government Way 3200 Cedar Street <br /> Couer d'Alene, ID 83815 Everett, WA 98201 Date <br /> /94644 03/30/2021 <br /> Project Manager: Vince Bruscas <br /> Department Director Torn Hingson s- , <br /> Signature: 415-4. City Attdrne t <br /> '� ` Z <br /> OCR Tim eno +c <br /> YIVZO <br /> Name&Title: • <br /> BRENDA BLOOD Mayor: ran. <br /> - PRESIDENT/OWNER <br /> * WA Use r•tx on material3 included. WAC.158-20-171 <br /> A T: <br /> City Clerk <br />