My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 00 21 13 <br /> INSTRUCTIONS TO BIDDERS ' <br /> 2. Other Documentation: Any other documentation required under the Mandatory or <br /> Supplemental Bidder Responsibility Criteria as set forth above. I <br /> 3. Certification of Compliance with Wage Payment Statutes. To be filled in and signed by the Bidder <br /> The City may also require Bidders other than the apparent low bidder(s)to submit the above items. <br /> C. The following forms are to be executed after the award of Contract: I <br /> 1. Contract: This Contract to be executed by the successful Bidder in duplicate within 14 calendar <br /> days after the award date. <br /> 2. Payment and Performance Bond: This form is to be executed by the successful Bidder and his <br /> surety company in triplicate. The amount of these bonds shall be 100 percent of the Total Bid <br /> Amount and shall be submitted with the Contract. <br /> 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained and maintained <br /> in force in accordance with Section 007200, Part 15 "Liability and Insurance", of the Contract <br /> Documents. <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must file with each <br /> bond a certified and effectively dated copy of their Power of Attorney. 1 <br /> 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit of Wages <br /> Paid(F700-007-000)from the Contractor,Subcontractor and agents to the Subcontractor shall be <br /> submitted to the Employment Standards Division, State Department of Labor and Industries, <br /> Olympia, Washington. If the prime contract is over $1,000,000, then Contractor also needs to <br /> submit L&I Form F700-164-000(Affidavit of Wages Paid EHB 2805 Addendum), <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form WH347): <br /> Contractors, Subcontractors, and agents to Subcontractors using Payroll Form WH347) may use <br /> State of Compliance found on back of form. ' <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH 348). Contractors, <br /> Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall attach the <br /> Statement of Compliance Form WH 348 to each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors on a form <br /> provided by the City prior to their working on the Site. ' <br /> 9. Construction Progress Schedule: To be submitted as required by Section 007200,Part 5"Progress <br /> and Completion",of the Contract Documents by the Contractor within ten calendar days,or such <br /> time as determined by the Landscape Architect, after the date of receipt of Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's Design and <br /> Construction Standards. If,and to the extent,such plans are not sufficient,complete or adequate <br /> to support the Bidder's planned means and methods of performing the Work, the Bidder must <br /> develop an adequate, complete and sufficient traffic control plan at its cost, that shall be <br /> submitted for the City's approval prior to construction. Deviation from the Standard Plans must <br /> be submitted by the Contractor and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the Landscape Architect with the location of all disposal sites to be used, <br /> and also provide copies of the permits and approvals for such disposal sites. The Contractor shall <br /> Emma Yule Park 10 of 11 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.