Laserfiche WebLink
I <br /> I Revised 2021-01-19 Section 007200 <br /> Addendum No. 1 General Conditions <br /> I 13.1 Resolution 49 <br /> 13.2 Continuing the Work 49 <br /> 14. TIME LIMITATIONS AND JURISDICTION 49 <br /> I15. LIABILITY AND INSURANCE 50 <br /> 15.1 General 50 <br /> I 15.2 Bonds 50 <br /> 15.2.1 Payment and Performance Bond 50 <br /> 15.2.2 Maintenance Bond 50 <br /> I 15.3 Insurance 50 <br /> 15.3.1 General 50 <br /> 15.3.2 Insurer Rating 50 <br /> I 15.3.3 Claims Made Form Requirements 50 <br /> 15.3.4 Cross Liability Endorsement 51 <br /> 15.3.5 Additional Insured 51 <br /> I 15.3.6 Contractor Insurance Primary 51 <br /> 15.3.7 Assumption of Risk 51 <br /> 15.3.8 Cost Included in Price 51 <br /> I15.3.9 Subcontractors 51 <br /> 15.3.10 No Work Until Insurance Requirements Met 51 <br /> 15.3.11 Failure to Procure and Maintain Insurance 52 <br /> I15.3.12 Cancellation 52 <br /> 15.3.13 Evidence of Insurance 52 <br /> I 15.3.14 Coverages and Limits 52 <br /> 15.3.14.1 CGL 53 <br /> 15.3.14.2 Builders'Risk 53 <br /> I 15.3.14.3 Other Coverages 53 <br /> 15.3.14.4 Limits 53 <br /> 15.3.14.5 Automobile 54 <br /> I 15.3.14.6 Excess or Umbrella Liability 54 <br /> 15.3.14.7 Pollution Liability 54 <br /> 15.3.14.8 Worker's Compensation 54 <br /> I 15.3.15 Self-Insurance 54 <br /> 16. LAWS,REGULATIONS AND PERMITS 54 <br /> 16.1 General 54 <br /> I16.2 Permits and Licenses 55 <br /> 16.3 Patents and Royalties 55 <br /> I 17. AUDITS 55 <br /> 17.1 General 55 <br /> 17.2 Claims 56 <br /> I17.3 Required Documentation for Audits 56 <br /> 18. MISCELLANEOUS 57 <br /> I18.1 Construction 57 <br /> - General Conditions—007200-v <br /> I <br />