My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Revised 2021-01-19— <br /> Addendum No. 1 <br /> 4.4.10. Access To Work <br /> Owner, Owner's Representative,their consultants and other representatives and personnel of Owner, 1 <br /> independent testing laboratories,and governmental agencies with jurisdictional interests will have access <br /> to the Site and the Work at reasonable times for their observation,inspecting,and testing. Contractor shall <br /> provide them proper and safe conditions for such access and advise them of Contractor's Site safety <br /> procedures and programs so that they may comply therewith as applicable. <br /> 4.4.11. Emergencies <br /> In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent <br /> thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss.Contractor shall give <br /> Owner's Representative prompt written notice if Contractor believes that any significant changes in the <br /> Work or variations from the Contract Documents have been caused thereby or are required as a result <br /> thereof. If Owner's Representative determines that a change in the Contract Documents is required be- <br /> cause of the action taken by Contractor in response to such an emergency,a Work Change Directive or <br /> Change Order will be issued. <br /> 4.4.12. Trench Excavation <br /> For all trench excavations that exceed a depth of four feet,the Contractor must use adequate safety <br /> systems that meet the requirements of the Washington Industrial Safety and Health Act, chapter 49.17 <br /> RCW. <br /> 4.4.13. COVID-19 <br /> The Contractor shall be in compliance at all times with all legal and governmental requirements <br /> regarding COVID-19. Contractor's Bid includes all costs necessary for compliance with COVID- <br /> 19 requirements. In no event will there be any adjustment to the Contract Sum for any direct or <br /> indirect costs caused by COVID-19 requirements. <br /> 4.5. OWNER-CONTRACTOR COORDINATION I <br /> 4.5.1. Service of Notice <br /> Contractor agrees that any Notice, order,direction,request or other communication by the Owner's <br /> Representative or Owner to the Contractor shall be deemed received by the Contractor if left at any office <br /> used by the Contractor or delivered to any of the Contractor's officers,clerks or employees or posted at <br /> the site of the Work or mailed to any post office addressed to the Contractor at the address given in the <br /> Contract Documents or mailed to the Contractor's last known place of business. If mailed,any form of <br /> communication will be deemed to have been given to and received by the Contractor the day after the day <br /> of mailing. <br /> 4.5.2. Suggestions to Contractor <br /> Nothing in these Contract Documents requires the Owner's Representative to provide the Contractor with <br /> direction or advice on how to do the Work, construction practices,or means and methods. If the Owner's <br /> Representative approves, suggests or recommends any construction practice,means,method or manner <br /> for doing the Work or producing materials,the approval or recommendation shall not: (A) guarantee that <br /> following the method or manner will result in compliance with the Contract Documents; (B)relieve the <br /> Contractor of any risks or obligations under the Contract Documents; or(C)create any liability by the <br /> Owner to the Contractor. <br /> Suggestions as to the plans or methods of accomplishing the Work or Contract requirements by the <br /> Owner or the Owner's Representative to the Contractor but not specified or required,if adopted or <br /> followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the <br /> Contractor. The Owner and the Owner's Representative assume no responsibility therefor and in no way <br /> General Conditions—007200-14 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.