My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Revised 2021-01-19— <br /> Addendum No. 1 <br /> by the Contractor in reasonable anticipation of performing the Work that has been deleted or <br /> terminated; <br /> 4. The total payment for any one item in the case of a deletion or partial termination shall not exceed <br /> the Bid price as modified by approved Change Orders less the estimated cost,including Overhead <br /> ' and profit,to complete the Work and less any amount paid to the Contractor for the item; <br /> 5. If the entire remainder of the Contract is terminated,the total payment to the Contractor shall not <br /> exceed the total Contract Sum as modified by approved Change Orders less those amounts paid to <br /> tthe Contractor before the effective date of the termination; and <br /> 6. No claim for damages of any kind or for loss of anticipated profits or consequential damages on <br /> deleted or terminated Work will be allowed because of termination or Change Order. Contract <br /> Time shall be adjusted as the parties agree. If the parties cannot agree,the Owner's <br /> Representative will determine the adjustment of Contract Time. <br /> ' Acceptable materials ordered by the Contractor prior to the date the Work was terminated or deleted will <br /> either be purchased from the Contractor by the Owner at the actual cost and shall become the property of <br /> the Owner, or the Owner will reimburse the Contractor for the actual costs of returning these materials to <br /> the Suppliers. <br /> ' If Contractor disagrees with the adjustment of Contract Sum determined by the Owner's Representative, <br /> Contractor may submit a Contract Claim for the difference between the amount determined by the <br /> Owner's Representative and the amount sought by the Contractor. <br /> ' Contractor shall not be entitled to anticipated profits on deleted,terminated, or uncompleted Work. <br /> 9.3. CHARGES TO CONTRACTOR <br /> ' The Contractor shall pay the Owner on demand everything charged to it under the terms of this Contract. <br /> Such charges may be deducted by the Owner from money due or to become due to the Contractor under <br /> the Contract. The Owner may recover such charges from the Contractor or from its surety. <br /> ' Contractor agrees to pay the costs of overtime or excessive inspection and observation costs incurred by <br /> the Owner. Overtime inspection shall include inspection required during Saturdays, Sundays, City <br /> holidays and weekdays, in excess of 40 hours per week or outside of normal working hours and <br /> inspections or observations that result in an inspector or observer working more than forty hours in a <br /> week. Costs of such overtime or excessive inspection or observation include architecture,engineering, <br /> construction management services, inspection, general supervision and Overhead expenses which are <br /> directly chargeable to the overtime or excessive work. Contractor agrees that Owner will deduct such <br /> charges from payments due the Contractor. In the event the Owner by Change Order requires the <br /> Contractor to work in excess of the established schedule of working hours,the Owner will not charge the <br /> Contractor for inspection costs associated therewith. <br /> 9.4. COMPENSATION TO OWNER FOR TIME EXTENSION <br /> The Owner shall be compensated by the Contractor for the actual costs to the Owner of engineering, <br /> inspection,general supervision,right-of-way costs,permit fees, Overhead expenses, and any other <br /> ascertainable direct costs to the Owner that are directly chargeable to the Work and which accrue during <br /> the period of such extension. The actual costs do not include charges for final inspection and preparation <br /> ' of the final payment by the Owner. <br /> 9.5. ADJUSTMENT OF CONTRACT SUM <br /> ' 9.5.1 Calculation <br /> Except as otherwise expressly provided in these General Conditions,any and all adjustments of Contract <br /> Sum shall be determined as follows: <br /> 1. If the parties are able to agree,the price will be determined by using: <br /> General Conditions—007200-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.