My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Revised 2021-01-19— <br /> Addendum No. 1 �. <br /> 9.6.1 Labor. <br /> The Owner will reimburse the Contractor for labor and for supervision by foremen dedicated solely to the I <br /> particular Force Account item of Work,but not for supervision by general superintendents or general <br /> foremen. The Owner's Representative will compute the labor payment on the basis of these four factors: <br /> 1. Weighted Wage Rate. The Weighted Wage Rate combines: <br /> a. the current basic wage and fringe benefits the Contractor is required and has agreed to pay, <br /> b. Federal Insurance Compensation(FICA), ' <br /> c. Federal Unemployment Tax Act(FUTA), and <br /> d. State Unemployment Tax Act(SUTA) <br /> A Weighted Wage Rate shall be computed for each classification of labor used. This rate shall <br /> reflect the Contractor's actual cost. It shall neither exceed what is normally paid to comparable <br /> labor nor fall below the minimum required by 7.1.WAGES OF EMPLOYEES. If the Owner's <br /> Representative authorizes overtime,the Weighted Wage Rate shall be determined on the same <br /> basis. <br /> 2. Travel Allowance and Subsistence. This includes the actual costs of allowances for travel or <br /> subsistence paid to employees in the course of their work on the item. This reimbursement will be <br /> made only if such allowances are required by a regional labor agreement or are normally paid by <br /> the Contractor to comparable labor for performing other work. E <br /> 3. Industrial Insurance and Medical Aid Premiums. The Owner will reimburse Contractor-paid <br /> premiums for Marine Industrial Insurance, for State of Washington Industrial Insurance, and <br /> Medical Aid Premiums that become an obligation of the Contractor and are chargeable to the <br /> Force Account Work. The Owner will not pay the Contractor for Medical Aid premiums that are <br /> paid by the employees. <br /> 4. Overhead and Profit. The Owner will pay the Contractor twenty-nine(29)percent of the sum of <br /> the costs listed in a, b, and c above to cover Project Overhead,general company Overhead,profit, <br /> and any other costs incurred. <br /> 9.6.2. Materials. <br /> The Owner will reimburse actual invoice cost for Contractor-supplied materials. This cost includes actual <br /> freight and express charges and taxes,provided that these costs have not been paid in some other manner <br /> under the Contract. A deduction will be made for any offered or available discounts or rebates if the <br /> Owner has provided the Contractor with the means to comply with the provisions allowing the discount. <br /> The Owner will then add twenty-one(21)percent of the balance to cover Project overhead,general <br /> company Overhead,profit,and any other cost of supplying materials. <br /> To support charges for materials,the Contractor shall provide the Owner's Representative with authentic, <br /> complete and accurate copies of vendor invoices, including freight and express bills. If invoices are not <br /> available for materials from the Contractor stocks,the Contractor shall certify actual costs by affidavit. <br /> If Contract Claims for materials costs are too high, inappropriate,or unsupported by satisfactory <br /> evidence,the Owner's Representative may determine the cost for all or part of the materials. When <br /> determined in this manner,the cost will be the lowest current wholesale price from a source that can <br /> supply the required quantity, including delivery costs. <br /> The Owner reserves the right to provide materials. If so, the Contractor will receive no payment for any <br /> costs, Overhead, or profit on such materials. <br /> 9.6.3. Equipment. <br /> The equipment rates shall be actual cost but shall not exceed the rates set forth in the AGC/WSDOT <br /> Equipment Rental Agreement in effect at the time the Work is performed, ' <br /> General Conditions—007200-38 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.