Laserfiche WebLink
Revised 2021-01-19— <br /> Addendum No. 1 <br /> The approval of the Owner's Representative shall be required for the selection of machine-power tools or <br /> equipment prior to their use in Force Account situations. <br /> The payment for any machine-power tools or equipment shall be made according to the current <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is authorized.The <br /> rates as set forth in the Rental Rate Blue Book(as modified by the current AGC/WSDOT Equipment <br /> Rental Agreement)are the maximum rates allowable for equipment of modem design and in good <br /> working condition. These rates shall be full compensation for all fuel, oil, lubrication,repairs, <br /> maintenance,and all other costs incidental to furnishing and operating the equipment except labor for <br /> operation. <br /> The Owner will add twenty-one(21)percent to equipment costs to cover Project Overhead,general <br /> �j company Overhead (excluding equipment Overhead included in the Rental Rate Blue Book), and profit. <br /> Current copies of the Rental Rate Blue Book and the AGC/WSDOT E i pEquipment Rental Agreement will be <br /> maintained at each region office of the Washington State Department of Transportation and at each of the <br /> offices of the Associated General Contractors of America,in Seattle, Spokane, Tacoma, Washington and <br /> Wilsonville,Oregon, where they are available for inspection. <br /> 9.6.4. For Services. <br /> Compensation under Force Account for specialized services shall be made on the basis of an invoice from <br /> the providing entity. A"specialized service"shall be one that is typically billed through invoice in <br /> standard industry practice. Before Work is started,the Owner's Representative may require the <br /> Contractor to obtain multiple quotations for the service to be utilized and select the provider with prices <br /> and terms most advantageous to the Owner. In the event that prior quotations are not obtained and the <br /> service invoice is submitted by the Subcontractor,then after-the-fact quotations may be obtained by the <br /> Owner's Representative from the open market in the vicinity and the lowest such quotation may be used <br /> in place of the submitted invoice. <br /> Except as noted below,the Owner will pay the Contractor an additional twenty-one(21)percent of the <br /> sum of the costs included on invoices for specialized services to cover project Overhead, general <br /> company Overhead,profit,bonding, insurance, Business&Occupation tax,and other costs incurred. <br /> When a Supplier of services is compensated through invoice,but acts in the manner of Subcontractor,as <br /> described in 9.6.6.For Contractor Markup of Subcontractors Work of this provision,then markup for <br /> that invoice shall be according to 9.6.6.For Contractor Markup of Subcontractors Work. <br /> 9.6.5. For Mobilization. <br /> Force Account mobilization is defined as the preparatory work performed by the Contractor including <br /> procurement, loading and transportation of tools and equipment,and personal travel time,when such <br /> ,._ travel time is a contractual obligation of the Contractor or a customary payment for the Contractor to all <br /> employees. Mobilization also includes the costs incurred during demobilization applies to both Force <br /> Account and other Contract Work. Owner will pay for mobilization for off-site preparatory work for <br /> Force Account items provided that Notice has been provided sufficiently in advance to allow the Owner's <br /> Representative to witness the activity, if desired. <br /> Any costs experienced during mobilization activities for labor,equipment, materials or services shall be <br /> listed in that section of the Force Account summary and paid accordingly. <br /> 9.6.6. For Contractor Markup on Subcontractor's Work. <br /> When Work is performed on a Force Account basis by one or more approved Subcontractors,by lower- <br /> tier Subcontractors or Suppliers, or through invoice by firm(s)acting in the manner of a Subcontractor, <br /> the Contractor will be allowed an additional markup,from the table below, applied to the costs computed <br /> for Work done by each Subcontractor through 9.6.1, 9.6.2,9.6.3, and 9.6.4,to compensate for all <br /> administrative costs, including project Overhead,general company Overhead,profit,bonding, insurance, <br /> Business&Occupation tax, and any other costs incurred. <br /> General Conditions—007200-39 <br /> I <br />