Laserfiche WebLink
1 <br /> City of Everett 00 43 36 - 2 <br /> Emma Yule Park PW# 2020-064-R1 I <br /> STRUCTURAL STEEL INSTALLATION <br /> Subcontractor, bidder or"no work" MUST be <br /> stated <br /> REBAR INSTALLATION <br /> Subcontractor, bidder or"no work" MUST be <br /> stated <br /> PART B SPECIALITY SUBCONTRACTORS 1 <br /> 1. For the work listed below, bidder MUST either identify itself or a subcontractor for <br /> each category of work in the chart below. <br /> 2. Bidder's bid shall be deemed non-responsive and void if: <br /> a. Bidder fails: (1) to submit on the chart below the name of a subcontractor for <br /> each category of specialty work listed below or(2) to name itself on the chart <br /> below to perform such work; or 1 <br /> b. Bidder names two or more subcontractors on the chart below to perform the <br /> same category of specialty work. <br /> 3. The requirement to name the bidder's proposed subcontractors applies to <br /> subcontractors who will contract directly with the general contractor submitting the bid <br /> to the City I <br /> Category of Specialty Work Bidder or Name of Subcontractor <br /> A <br /> Concrete <br /> (Either bidder or one subcontractor MUST <br /> be stated) I <br /> NOTE TO BIDDERS: <br /> BIDDERS SHOULD CAREFULLY REVIEW THE SUPPLEMENTAL BIDDER <br /> RESPONSIBILTY CRITERIA CONTAINED IN INSTRUCTIONS TO BIDDERS (SECTION 1 <br /> 002113). AMONG OTHER THINGS, THESE CRITERIA REQUIRE THAT EACH SPECIALTY <br /> SUBCONTRACTOR LISTED ON THIS PAGE MEET CERTAIN EXPERIENCE <br /> REQUIREMENTS. IN ADDITION, IF BIDDER NAMES ITSELF FOR ANY CATEGORY OF <br /> WORK ON THIS PAGE, THEN THE BIDDER ITSELF MUST MEET THE SAME EXPERIENCE <br /> REQUIREMENTS <br /> I <br /> END OF SECTION 00 43 36 <br /> 00 43 36 - 2 PROPOSED SUBCONTRACTORS FORM I <br /> I <br />