|
I
<br /> Revised 2021-01-19—
<br /> Addendum No. 1
<br /> take appropriate action. Contractor agrees not to perform Work it knows,or in the exercise of ordinary
<br /> care should know,to be contrary to any laws, ordinances,rules or regulations.
<br /> 16.2 PERMITS AND LICENSES
<br /> Unless otherwise specified,permits and licenses from governmental agencies, which are necessary only
<br /> for and during the prosecution of the Work and the subsequent guarantee period, shall be secured by the
<br /> Contractor and paid for by the Owner. Permits and licenses of regulatory agencies that are necessary to
<br /> be maintained after expiration of the guarantee period will be secured and paid for by the Owner.
<br /> The City of Everett Utilities Department has reviewed and commented on the Drawings in this Contract.
<br /> If an erosion control plan is required,the Contractor shall submit an erosion control plan that depicts the
<br /> best management practices that will be followed for erosion control. The Contractor may use the plans in
<br /> this Contract. The fee for this permit will be waived by the City of Everett.
<br /> Electrical permits can be obtained at:
<br /> City of Everett
<br /> 3200 Cedar Street—2' Floor
<br /> Everett,WA 98201
<br /> Phone: 425/257-8800
<br /> 16.3 PATENTS AND ROYALTIES
<br /> Costs involved in fees,royalties,or claims for any patented invention, article,process or method that may
<br /> be used upon or in a manner connected with the Work under this Contract or with use of completed Work
<br /> by the Owner shall be paid by the Contractor. The Contractor and its sureties shall protect and hold the
<br /> Owner, Owner's Representative, and Owner's Representative,together with its officers,agents,and
<br /> employees,harmless from any and all loss,defense cost,and expenses and against any and all demands
<br /> made for such fees or claims brought or made by the holder of any invention or patent. Before final
<br /> payment is made on the account of this Contract,the Contractor shall, if requested by the Owner,furnish
<br /> acceptable proof of a proper release from all such fees or claims.
<br /> Should the Contractor, its agent,employee or any of them be enjoined from furnishing or using any
<br /> invention, article,material or plans supplied or required to be supplied or used under this Contract,
<br /> Contractor shall promptly pay such royalties and secure requisite licenses; or, subject to acceptance by
<br /> Owner, substitute other articles,materials, or appliances in lieu thereof that are of equal efficiency,
<br /> quality,finish, suitability and market value to those planned or required under the Contract. Descriptive
<br /> information of these substitutions shall be submitted to the Owner's Representative for determination of
<br /> general conformance to the design concept and the construction Contract. Should Owner elect to refuse
<br /> the substitution,Contractor agrees to pay such royalties and secure such valid licenses as may be requisite
<br /> for the Owner,its officers,agents and employees or any of them, to use such invention,article,material
<br /> or appliance without being disturbed or in any way interfered with by any proceeding in law or equity on
<br /> account thereof.
<br /> 17. AUDITS
<br /> 17.1 GENERAL
<br /> The Contractor's records relating to this Project,including,but not limited to, wage,payroll, and cost
<br /> records,shall be open to inspection or audit by representatives of the Owner during the Project and for a
<br /> period of not less than six years after the date of Final Acceptance of the Contract. The Contractor shall
<br /> retain these records for that period. The Contractor shall also guarantee that Project records of
<br /> Subcontractors, Suppliers,and lower tier Subcontractors, including,but not limited to,the wage,payroll,
<br /> and cost records, shall be retained and open to similar inspection or audit for the same period of time.
<br /> The audit may be performed by employees or representatives of the Owner or by an auditor chosen by the
<br /> General Conditions—007200-55
<br /> I
<br />
|