My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2021-01-26 <br /> Addendum No. 2 <br /> City of Everett,WA <br /> PW No.2020-064-R1 <br /> Emma Yule Park <br /> ****ADDENDUM#2**** <br /> Date:January 26, 2021 <br /> THIS ADDENDUM BECOMES PART OF THE CONTRACT DOCUMENTS AND MODIFIES <br /> THE ORIGINAL PROJECT MANUAL AND DRAWINGS <br /> I <br /> The items below shall be made to the PROJECT MANUAL: <br /> I <br /> REVISION 1: Section 00 61 14 Maintenance Bond—Landscaping and Irrigation: <br /> DELETE: Section 00 61 14 in its entirety. <br /> ADD:Revised Section 00 61 14 Maintenance Bond—Landscaping and Irrigation (Revised- attached) <br /> REVISION 2: Section 00 41 13 Bid Form, par. 9: <br /> DELETE: Paragraph 9 in its entirety <br /> ADD: Paragraph 9: "The cost of 100-percent Performance Bond, Landscape Maintenance Bond, and <br /> Payment Bond, which shall include sales tax, is included in the bid. " <br /> REVISION 3: Section 32 31 13 Chain Link and Site Fencing: Part 1,paragraph 1.5: • <br /> DELETE: Paragraph 1.5 in its entirety. <br /> REVISION 4: Section 32 31 13 Chain Link and Site Fencing, Part 2, paragraph 2.2, A: <br /> DELETE: "2"mesh" <br /> ADD: "3/4"mesh". <br /> I <br /> REVISION 5: Section 32 91 13 Soil Preparation,Part 2,paragraph 2.1, A: <br /> ADD: The following paragraph: <br /> "B. Amended Topsoil shall be comprised of a mixture of compost and sandy loam meeting or exceeding <br /> the specification contained in Appendix C(test results dated 1/6/2020). " <br /> i <br /> REVISION 6: Section 32 92 23 Hydroseeding and Sod, Part 1, Paragraph 1.4, A, 4 ,a: <br /> ADD: the following sentence after"...maintenance plan: ", including plant material and turf <br /> maintenance and watering via temporary irrigation and/or via quick couplers. " <br /> I <br /> Emma Yule Park—Addendum No 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.