Laserfiche WebLink
I <br /> 2021-01-26 <br /> Addendum No. 2 <br /> City of Everett,WA <br /> PW No.2020-064-R1 <br /> Emma Yule Park <br /> ****ADDENDUM#2**** <br /> Date:January 26, 2021 <br /> THIS ADDENDUM BECOMES PART OF THE CONTRACT DOCUMENTS AND MODIFIES <br /> THE ORIGINAL PROJECT MANUAL AND DRAWINGS <br /> I <br /> The items below shall be made to the PROJECT MANUAL: <br /> I <br /> REVISION 1: Section 00 61 14 Maintenance Bond—Landscaping and Irrigation: <br /> DELETE: Section 00 61 14 in its entirety. <br /> ADD:Revised Section 00 61 14 Maintenance Bond—Landscaping and Irrigation (Revised- attached) <br /> REVISION 2: Section 00 41 13 Bid Form, par. 9: <br /> DELETE: Paragraph 9 in its entirety <br /> ADD: Paragraph 9: "The cost of 100-percent Performance Bond, Landscape Maintenance Bond, and <br /> Payment Bond, which shall include sales tax, is included in the bid. " <br /> REVISION 3: Section 32 31 13 Chain Link and Site Fencing: Part 1,paragraph 1.5: • <br /> DELETE: Paragraph 1.5 in its entirety. <br /> REVISION 4: Section 32 31 13 Chain Link and Site Fencing, Part 2, paragraph 2.2, A: <br /> DELETE: "2"mesh" <br /> ADD: "3/4"mesh". <br /> I <br /> REVISION 5: Section 32 91 13 Soil Preparation,Part 2,paragraph 2.1, A: <br /> ADD: The following paragraph: <br /> "B. Amended Topsoil shall be comprised of a mixture of compost and sandy loam meeting or exceeding <br /> the specification contained in Appendix C(test results dated 1/6/2020). " <br /> i <br /> REVISION 6: Section 32 92 23 Hydroseeding and Sod, Part 1, Paragraph 1.4, A, 4 ,a: <br /> ADD: the following sentence after"...maintenance plan: ", including plant material and turf <br /> maintenance and watering via temporary irrigation and/or via quick couplers. " <br /> I <br /> Emma Yule Park—Addendum No 2 <br /> I <br />