My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2021-01-26 <br /> Addendum No. 2 1 <br /> REVISION 7: Section 32 92 23 Hydroseeding and Sod, Part 3, Paragraph 3.1, A: <br /> ADD: the following sentence "The second seeding shall be included as part of the one-year <br /> maintenance, and not part of the initial construction. " <br /> REVISION 8: Section 00 45 13 Bidder's Qualification Statement,paragraph A, 1, (2): <br /> DELETE: "(c) one (1)project utilizing gabion construction)." I <br /> The items below shall be made to the PROJECT DRAWINGS: I <br /> REVISION 9: Drawings, sheet L3.3, Detail 906 Gabion Seat Wall: I <br /> ADD: "General note A: Gabion inner ballast stone (gabion backjill) may, at the Contractor's option, <br /> consist of Salvaged stone and concrete pieces that meet all other ballast requirements, as long as they <br /> are not visible when the gabion seat-walls are completed. " <br /> PLAN HOLDER QUESTIONS: 111 <br /> QUESTION 1: Is there a mandatory or aspirational goal for DBE/MBE/WBE/SBE participation on this <br /> project? <br /> ANSWER: No I <br /> QUESTION 2: Please provide information regarding the protest deadline and procedures for submitting <br /> same. <br /> ANSWER: See Section 00 21 13 Instructions to bidders, Section 1.13,paragraph A, 3, (d), 3, c, <br /> "Appeal/Protest of Responsibility Decision" <br /> QUESTION 3: Reference: 01 32 16—Construction Progress Schedule, 1.03— Submittal, B—Schedule I <br /> shall be submitted electronic—Acceptable format .mmp <br /> Since MS Project will interface with an .mmp format, it is acceptable to submit the project schedule as a <br /> PDF file, using MS Project for development? <br /> ANSWER: MS Project and/or PDF formats are also acceptable. <br /> i <br /> QUESTION 4: References: Section 00 61 14—Maintenance Bond—Landscaping&Irrigation& <br /> General Conditions, 15.2.2—Maintenance Bond <br /> Question: There is a 1 year warranty bond on this project, in addition to a 1 year maintenance bond for <br /> the landscaping portion of the work. If the bidder self-performs the landscaping work, can the bonded <br /> value of that work be included in the general warranty bond, or will two bonds be required regardless? I <br /> Emma Yule Park—Addendum No 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.