Laserfiche WebLink
I <br /> Revised 2021-01-19— Section 007200 <br /> Addendum No. 1 General Conditions <br /> 4.5.4. Cooperation with Others 15 <br /> 5. PROGRESS AND COMPLETION 15 <br /> 5.1. Notice to Proceed 15 <br /> 5.2. Contract Time 16 <br /> 5.2.1. General 16 <br /> 5.2.2. Construction Schedule 16 <br /> 5.2.2.1 General 16 it <br /> 5.2.2.2 Extensions of Contract Time 17 <br /> 5.2.3. Construction Progress 17 <br /> 5.2.4. Delays 18 <br /> II <br /> 5.2.4.1 General 18 <br /> 5.2.4.2 Bonuses 18 <br /> 5.3. Suspension Procedures 18 <br /> 5.4. Termination Procedures 18 <br /> 5.4.1. Termination by Owner for Default 18 <br /> 5.4.2. Termination for Convenience 20 <br /> 5.4.3. Termination by Contractor after Suspension 20 <br /> 5.4.4. Contractor Obligations upon Termination 20 <br /> 5.4.5. Ownership of Materials upon Termination 20 <br /> 5.4.6. Opportunity to Cure 21 <br /> 5.4.7 Waiver of Remedies for Any Breach 21 <br /> 5.5. Possession and Use of Completed Portions of the Work 21 <br /> 5.6. Possession of Incomplete Portions of the Project 21 <br /> 5.7. Substantial Completion 21 <br /> 5.8. Acceptance of Work 22 <br /> 6. CHANGES 22 <br /> 6.1 Owner's Right to Direct Changes to the Work 22 111 <br /> 6.2 Extra Work 23 <br /> 6.3 Change Orders 23 <br /> 6.4 Value Engineering and Cost Sharing 23 <br /> 7. LABOR STANDARDS 24 <br /> 7.1. Wages of Employees 24 <br /> 7.1.1. General 24 <br /> 7.1.2. Contractor's Responsibility 24 <br /> 7.1.3. Federal Labor Requirements 24 <br /> 7.2. Payment Certificates 24 <br /> 7.3. Hours of Labor 25 <br /> 7.4. Contract Work Hours 25 <br /> 7.5. Overtime Work 26 <br /> 7.6 Labor Relations 26 <br /> 8. MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES 26 <br /> 8.1. General 26 <br /> - General Conditions—007200-ii <br /> I <br />