Laserfiche WebLink
Emma Yule Park SECTION 00 01 10 <br /> City of Everett Parks&Community Services TABLE OF CONTENTS I <br /> DIVISION 1:GENERAL REQUIREMENTS 111 <br /> 01 1100 Summary of Work <br /> 01 25 00 Substitution Procedures <br /> 01 26 00 Contract Modification Procedures <br /> 01-29-00 Payment Procedures I <br /> 01 31 13 Project Coordination <br /> 01 31 19 Project Meetings <br /> 01.32.16 Construction Schedule I <br /> 01 32 23 Survey Layout Data <br /> 01.33.00 Submittals <br /> 01 35 29 Health and Safety , <br /> 0142 00 References <br /> 0145 00 Quality Control <br /> 01 50 00 Temporary Facilities and Controls <br /> 01 55 00 Vehicular Access and Parking <br /> 0157 00 Temporary Controls <br /> 01 6150 Delivery, Storage and Handling <br /> 01 74 23 Final Cleaning <br /> 01 77 00 Closeout Procedures <br /> 01 78 23 Operation and Maintenance Data <br /> 01 78 36 Warranties and Bonds <br /> 01 78 39 Project Record Documents I <br /> DIVISION 2: EXISTING CONDITIONS <br /> 02 00 00 Existing Conditions <br /> 111 <br /> 02 30 00 Subsurface Investigation <br /> DIVISION 3: CONCRETE <br /> 03 1100 Concrete Forming <br /> 03 30 00 Cast-in-Place Concrete <br /> DIVISION 4: MASONRY I <br /> 04 00 00 Masonry <br /> DIVISION 31: EARTHWORK <br /> 3100 00 Earthwork <br /> 31 10 00 Site Preparation 1 <br /> 31 23 33 Irrigation Trench Excavation <br /> 31 36 00 Gabion Seat Walls <br /> Page 2 of 3 11/28/18 <br /> Job#2020-064 <br /> Table of Contents <br /> I <br />