My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Section 00 21 13 <br /> INSTRUCTIONS TO BIDDERS <br /> 1.1 General Description and Location of Project <br /> ' The Work to be performed will include furnishing all labor, materials and equipment necessary to perform <br /> all Work as required by the Contract in accordance with the Contract Documents. <br /> The Project Site is located at 4817 Rucker Avenue, Everett Washington. <br /> 1.2 Project Manager <br /> Questions and inquiries about the Contract Documents shall be directed to the attention of the City of <br /> Everett Project Manager. <br /> 1.3 Standard Specifications <br /> The following other Specifications and Standard Plans shall apply to the extent to which they are called <br /> out in the Contract Documents. <br /> Ii. WSDOT"2018 Standard Specifications for Road, Bridge and Municipal Construction",as amended <br /> by the APWA Supplements, hereinafter referred to as the"Standard Specifications." <br /> 2. City of Everett"Design and Construction Standards and Specifications" <br /> (Current Addition) https://everettwa.gov/1531/Design-Construction-Standards <br /> 3. "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br /> 4. APWA Standards, latest edition. <br /> ' 5. AWWA Standards, latest edition. <br /> 6. American Concrete Institute (ACI), latest edition <br /> 7. American Society of Testing Materials (ASTM), latest edition <br /> 1.4 Examination of Site Conditions,Contract Documents and Regulations <br /> Bidders shall inspect the Site of the Work and carefully review the Contract Documents to satisfy <br /> themselves, by personal examination, physical testing,or by such other means as they may prefer,of the <br /> location of the proposed Work, the actual physical conditions of and at the Site, surface and subsurface <br /> conditions,and conditions ordinarily to be encountered and generally recognized as inherent in the Work. <br /> If, during the course or as a result of such inspection, examination and testing, a Bidder finds facts or <br /> conditions that appear to conflict or are omitted from the Contract Documents, or with other data or <br /> material made available relating to the Work, Bidder shall so notify the City in writing, and may apply to <br /> the City for additional information and explanation before submitting their Bid. <br /> The submission of a Bid by the Bidder shall constitute acknowledgment that, in preparing and submitting <br /> a Bid, Bidder has not only reviewed the Contract Documents, but is also relying on their own knowledge, <br /> examination, inspection, and testing of: <br /> 1. the Site of the Work, <br /> 2. access to the Site, <br /> 3. environmental factors, <br /> 4. all other data, matters and things requisite to the fulfillment of the Work, <br /> Emma Yule Park 1 of 11 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.