My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Section 00 21 13 <br /> INSTRUCTIONS TO BIDDERS I <br /> Bids will be evaluated by the City to determine which bid is the lowest responsive bid by a <br /> responsible bidder and which bid, if any,should be accepted in the best interest of the City. <br /> The City, in its sole discretion, reserves the right to accept or reject any and all bids submitted <br /> and to waive informalities and minor irregularities. <br /> 1. LOWEST: The City will award the Project to the responsive and responsible bidder whose <br /> Bid is the lowest. The Bid Form includes alternates. The City will determine at the City's <br /> sole discretion after Bid opening which alternates, if any,to include in the Work. The <br /> lowest Bid is the bid that has the lowest sum of base bid and the included alternates. , <br /> 2. RESPONSIVENESS: City will consider all the material submitted by the bidder to <br /> determine whether the offering is in compliance with the Contract Documents. The City <br /> reserves the right, at its discretion,to reject nonresponsive Bids. <br /> 3. RESPONSIBILITY: <br /> (a) Mandatory Responsibility Criteria: RCW 39.04.350(1). It is the intent of City to 1 <br /> award a contract to the lowest responsive and responsible Bidder. Before <br /> award,the Bidder must meet the Bidder responsibility criteria under this <br /> Section 1.13.A.3(a)to be considered a responsible Bidder. The Bidder may be <br /> required by the City to submit documentation demonstrating compliance with <br /> the criteria under this Section 1.13.A.3(a). The Bidder must: <br /> 1. Registration. Have a current certificate of registration as a contractor in <br /> compliance with chapter 18.27 RCW, which must have been in effect at the <br /> time of bid submittal; and <br /> 2. UBI. Have a current Washington Unified Business Identifier(UBI) number; <br /> and I <br /> 3. State Requirements. If applicable: <br /> a. Have Industrial Insurance (workers'compensation) coverage for the <br /> bidder's employees working in Washington,as required in Title 51 RCW; <br /> b. Have a Washington Employment Security Department number, as <br /> required in Title 50 RCW; <br /> c. Have a Washington Department of Revenue state excise tax registration <br /> number, as required in Title 82 RCW; and <br /> 4. Disqualification. Not be disqualified from bidding on any public works <br /> contract under RCW 39.06.010 or 39.12.065(3). <br /> 5. Apprentices. If the Project is subject to the apprenticeship utilization ' <br /> requirements in RCW 39.04.320, not have been found out of compliance by <br /> the Washington state apprenticeship and training council for working <br /> apprentices out of ratio,without appropriate supervision,or outside their <br /> approved work processes as outlined in their standards of apprenticeship <br /> under chapter 49.04 RCW for the one-year period immediately preceding <br /> the date of the bid solicitation. I <br /> Emma Yule Park 4 of 11 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.