Laserfiche WebLink
I <br /> Section 00 21 13 <br /> IINSTRUCTIONS TO BIDDERS <br /> 6. Compliance with Wage Statutes. Within the three-year period immediately <br /> I preceding the date of the bid solicitation, not have been determined by a <br /> final and binding citation and notice of assessment issued by the <br /> department of labor and industries or through a civil judgment entered by a <br /> I <br /> court of limited or general jurisdiction to have willfully violated, as defined <br /> in RCW 49.48.082, any provision of chapter 49.46,49.48, or3149.52 RCW. <br /> (Note to Bidder: prior to award,the lowest responsive and responsible <br /> bidder must sign the "Certification of Compliance with Wage Payment <br /> IStatutes" included in the bid package.This certification is NOT required to <br /> be submitted with the bid proposal and may be submitted after bid <br /> opening.). <br /> 111 7. Prevailing Wage Training. Have received training on the requirements <br /> related to public works and prevailing wage under chapter 39.04 RCW and <br /> Ichapter 39.12 RCW. <br /> (b) Supplemental Bidder Responsibility Criteria: RCW 39.04.350(3). In addition to <br /> the mandatory bidder responsibility criteria above,the Bidder must also meet the <br /> Isupplemental bidder responsibility criteria listed below. Further, the apparent <br /> low Bidder and the second apparent low Bidder must submit the Bidder's <br /> Qualifications Statement(Section 004513)and any other documentation listed <br /> I below to the City Clerk within 2 business days after the bid opening, unless the <br /> City's project manager in writing allows additional time. The City reserves the <br /> right to require such documentation from other bidders also. <br /> 1. Project-Specific Requirements: <br /> Ia. Criteria: <br /> (i) Requirements for Concrete Subcontractor. The <br /> I Subcontractor listed in Part B of Section 004336 <br /> (Proposed Subcontractors Form) as the Concrete <br /> Subcontractor must satisfy both of the following <br /> 111 requirements: <br /> (1) For at least the five (5) years prior to Bid opening, <br /> I the Concrete Subcontractor must have been in the <br /> business of actively and directly constructing <br /> concrete flatwork, gabions, and concrete curb <br /> Iprojects with its own forces_ <br /> (2) Within the three (3)years prior to Bid opening, <br /> the Concrete Subcontractor must have <br /> Isuccessfully completed with its own forces the <br /> concrete flatwork portion of at least: <br /> a. five (5)concrete installations of 10,000 SF or <br /> I larger,and <br /> b. one (1) installation of 500 LF of poured <br /> cement curb or larger, and <br /> c. one (1) project utilizing gabion construction. <br /> Emma Yule Park 5 of 11 <br /> I <br />