My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/04/21 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/04/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 9:34:41 PM
Creation date
4/26/2021 3:58:00 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Accept the 2020 Pavement Maintenance Overlay Project as complete with <br />Granite Construction Company and authorize the Mayor to sign the Certificate of <br />Completion allowing release of retention. <br />Documents: <br />Granite Construction.pdf <br />(4) Award Invitation for Bid #2021-008 Biosolids Loading, Hauling & Land Application <br />to Sno-Valley Farms Inc. in the amount of $311,600.00, which is not subject to <br />Washington State sales tax. <br />Documents: <br />Sno Valley.pdf <br />(5) Authorize the Mayor to sign Amendment No. 1 to Agreement No. TCPRA-1921- <br />EverPW-00080 with the State of Washington Department of Ecology. <br />Documents: <br />Deptment of Ecology.pdf <br />(6) Award and authorize purchase of playground equipment and installation with <br />Gametime c/o Great Western Recreation from Omnia Partners #2017001134/City of <br />Everett #2017-091 in the amount of $600,748.05, including Washington State sales tax. <br />Documents: <br />Gametime.pdf <br />(7) Award and Authorize the Mayor to Sign Contract in substantially the form provided <br />for Request for Proposal #2020-061 Public Private Partnerships - Park Properties to <br />provide paddle rentals and classes at Thornton A. Sullivan Park at Silver Lake to <br />Hydrology Stand -Up Paddle. <br />Documents: <br />Hydrology Award PDF.pdf <br />(8) Authorize the Request for Qualifications for the 1-5 & US-2 Interchange Justification <br />Report Planning Study. <br />Documents: <br />US 2 Interchange.pdf <br />(9) (This item has been pulled) - Accept the Maple Heights Bridge Seismic Retrofit <br />Project as complete with Combined Construction, Inc. and authorize the Mayor to sign <br />the Certificate of Completion. <br />Documents: <br />Maple Heights Bridge Sceimic PDF (1).pdf <br />PUBLIC HEARING: <br />
The URL can be used to link to this page
Your browser does not support the video tag.