Laserfiche WebLink
Provided by the City <br />e <br />e <br />e <br />ix <br />Location for pre -construction conference <br />Agenda and meeting summary for all Construction Meetings <br />Participation in all meetings <br />Direction to Consultant regarding participation in construction meetings <br />Assumptions <br />■ The pre -construction conference will be attended by up to three Consultant staff. <br />■ Up to two Consultant staff on average will participate in up to 99 construction meetings, <br />at the direction of the City. <br />Consultant Deliverables <br />■ Pre -construction conference agenda and meeting summary <br />304. Shop Drawings and Submittals Review <br />At the request of the City, Consultant will: review and comment on shop drawings and other <br />technical submittals; consider and evaluate any alternatives or substitutions proposed by the <br />contractor; receive and review other submittals of the contractor including construction <br />schedules, shop drawings/submittal schedules, lump sum price breakdowns, and other submittals <br />required by the contract documents; and prepare and maintain a log of submittals received from <br />the contractor, noting the date received, item submitted on, applicable specification section, <br />resolution, and their current status. <br />Provided by the City <br />e <br />• <br />City will take the lead in receiving, reviewing, and responding to contractor submittals and <br />shop drawings. <br />City will provide direction to Consultant regarding involvement in review of shop drawings <br />and submittals. <br />Assumptions <br />• <br />For budgeting purposes, it is assumed that up to a combined total of 70 submittals and <br />resubmittals will be reviewed by Consultant. <br />Consultant Deliverables <br />• Submittal review comments <br />• Tracking log of submittals received by Consultant <br />City of Everett <br />April 2021 <br />G:1PDX_BD\CIients\Everett, WA\Reservoir 2 9-16 (16-1910)1Scope-Fee-Contract\Const. Supt. Serv\Exh A2 - Everett Reservoir 2 Rplcmnt CSS Scope.docx <br />MVURRAYSMITH Replacement of Reservoir 2 <br />5 <br />