My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/04/28 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/04/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 9:18:49 PM
Creation date
4/28/2021 1:50:23 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/28/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Provided by the City <br />e <br />e <br />e <br />ix <br />Location for pre -construction conference <br />Agenda and meeting summary for all Construction Meetings <br />Participation in all meetings <br />Direction to Consultant regarding participation in construction meetings <br />Assumptions <br />■ The pre -construction conference will be attended by up to three Consultant staff. <br />■ Up to two Consultant staff on average will participate in up to 99 construction meetings, <br />at the direction of the City. <br />Consultant Deliverables <br />■ Pre -construction conference agenda and meeting summary <br />304. Shop Drawings and Submittals Review <br />At the request of the City, Consultant will: review and comment on shop drawings and other <br />technical submittals; consider and evaluate any alternatives or substitutions proposed by the <br />contractor; receive and review other submittals of the contractor including construction <br />schedules, shop drawings/submittal schedules, lump sum price breakdowns, and other submittals <br />required by the contract documents; and prepare and maintain a log of submittals received from <br />the contractor, noting the date received, item submitted on, applicable specification section, <br />resolution, and their current status. <br />Provided by the City <br />e <br />• <br />City will take the lead in receiving, reviewing, and responding to contractor submittals and <br />shop drawings. <br />City will provide direction to Consultant regarding involvement in review of shop drawings <br />and submittals. <br />Assumptions <br />• <br />For budgeting purposes, it is assumed that up to a combined total of 70 submittals and <br />resubmittals will be reviewed by Consultant. <br />Consultant Deliverables <br />• Submittal review comments <br />• Tracking log of submittals received by Consultant <br />City of Everett <br />April 2021 <br />G:1PDX_BD\CIients\Everett, WA\Reservoir 2 9-16 (16-1910)1Scope-Fee-Contract\Const. Supt. Serv\Exh A2 - Everett Reservoir 2 Rplcmnt CSS Scope.docx <br />MVURRAYSMITH Replacement of Reservoir 2 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.