Laserfiche WebLink
Amendment <br />This Contract is amended as follows: <br />Special Terms and Conditions, Section 3 (Compensation) is hereby replaced in its <br />entirety: <br />3. COMPENSATION <br />COMMERCE shall pay an amount not to exceed one hundred thousand dollars <br />($100,000) for the performance of all things necessary for or incidental to the performance <br />of work under this Contract as set forth in the Scope of Work (Attachment A). <br />The final due date for deliverables must be no later than June 15, 2021. <br />Attachment A: Scope of Work and Attachment B: Budget are hereby revised to address <br />changes in the housing planning efforts currently underway by the city of Everett and address <br />delays due to COVID. Changes include the following: <br />• The SOW removes the TOD Housing Action Plan and incorporates some of those <br />elements into the Citywide Housing Action Plan. <br />• The amendment changes Deliverable 1 from an Adopted Rethink Housing Action Plan <br />to a Housing Needs Assessment, adds a Deliverable 3 (Draft Housing Action Plan), and <br />renumbers Deliverable 3 to Deliverable 4 and changes it from an Adopted Rethink <br />Housing TOD Action Plan to a Final Draft Housing Action Plan with Adoption Schedule. <br />• The amendment also breaks Action 2 (Housing Displacement Strategy) into two <br />deliverables, adding a draft deliverable and making the current deliverable a Final Draft <br />version. <br />• This amendment also updates funding for deliverables and deliverable due dates to <br />reflect delays due to COVID. <br />See attached revised Scope of Work (Attachment A) and Budget (Attachment B), which shows <br />new or moved text with underline and removed text with ctrikcthrough. <br />ALL OTHER TERMS AND CONDITIONS OF THIS CONTRACT REMAIN IN FULL FORCE AND <br />EFFECT. <br />2 <br />