My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS I <br /> 1-04.6 Variation in Estimated Quantities 56 <br /> 1-04.7 Differing Site Conditions (Changed Conditions) 56 <br /> 1-05 CONTROL OF WORK 57 <br /> 1-05.1 Authority of the Engineer 57 <br /> 1-05.1 City(******) 57 <br /> 1-05.2 Authority of Assistants and Inspectors 57 I <br /> 1-05.2 City's Representative (******) 57 <br /> 1-05.3 Working Drawings 58 I <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes 60 <br /> 1-05.6 Inspection of Work and Materials 62 <br /> 1-05.7 Removal of Defective and Unauthorized Work 63 I <br /> 1-05.10 Guarantees 63 <br /> 1-05.11 Final Inspection 64 <br /> 1-05.11 Final Inspections and Operational Testing (******) 64 I <br /> 1-05.12 Final Acceptance 65 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 66 <br /> 1-05.14 Cooperation With Other Contractors 66 I <br /> 1-05.16 Water and Power (******) 68 <br /> 1-05.17 Oral Agreements (******) 68 <br /> 1-05.18 Contractor (******) 68 <br /> 1-05.19 City-Contractor Coordination (******) 70 <br /> 1-06 CONTROL OF MATERIAL 71 <br /> 1-06.1 Approval of Materials Prior to Use 71 I <br /> 1-06.2 Acceptance of Materials 72 <br /> 1-06.3 Manufacturer's Certificate of Compliance 72 <br /> 1-06.4 Handling and Storing Materials 73 <br /> 1-06.6 Recycled Materials 73 <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 73 I <br /> 1-07.1 Laws to be Observed 73 <br /> 1-07.2 State Taxes 75 <br /> 1-07.2 State Sales Tax 75 ' <br /> 1-07.3 Forest Protection and Merchantable Timber Requirements 76 <br /> 1-07.5 Environmental Regulations 76 <br /> 1-07.6 Permits and Licenses 76 I <br /> 1-07.9 Wages 76 <br /> 1-07.11 Requirements for Nondiscrimination 77 <br /> 1-07.14 Responsibility for Damage 78 I <br /> 1-07.17 Utilities and Similar Facilities 80 <br /> 1-07.18 Public Liability and Property Damage Insurance 82 <br /> 1-07.18 Insurance(******) 82 I <br /> 1-07.20 Patented Devices, Materials, and Processes 85 <br /> 1-07.23 Public Convenience and Safety 85 <br /> 1-07.24 Rights of Way 86 <br /> 1-07.27 No Waiver of State's Legal Rights 87 <br /> 1-07.27 No Waiver of City's Legal Rights (******) 87 <br /> 1-08 PROSECUTION AND PROGRESS 87 I <br /> SEI to SRI Intertie,SR08 Rehab Table of Contents WO No.-UP3714 <br /> SP-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.