My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I2. Because of the Delay described in subsection (1), the Contractor was forced <br /> to suspend or significantly interrupt its performance so that it was on standby <br /> I or idled, and the City required the Contractor to be ready to resume <br /> performance on short notice. Extended time of performance of Work, such <br /> as extensions caused by changes, inefficiencies, or extra Work, does not <br /> I constitute suspension or significant interruption of performance. <br /> 3. The Contractor could not and did not use resources, including, but not limited <br /> to, labor, equipment, materials and tools, standing by or idled on this or other <br /> I project for any Work during the period of Delay; <br /> 4. The Contractor's Overhead costs did not materially vary from its usual <br /> seasonal Overhead costs during the period of Delay; and <br /> I 5. The Delay did not cause over absorbed Overhead in the period the delayed <br /> Work was completed. <br /> 1-09.11 A(4)A1 a Resources <br /> I To demonstrate the Contractor could not and did not use resources, including, but <br /> not limited to, labor, equipment, materials and tools from this Project for any other <br /> work on this or any other project during the period of Delay in accordance with <br /> item 3 of 1-09.11A(4)A1 of these Special Provisions, the Contractor shall: <br /> I1. Affirmatively represent and warrant that it did not perform substitute <br /> Work; <br /> 2. Identify the specific resources that were idled; and <br /> I3. Show that those resources did not, and could not, work on other <br /> contracts or projects during the Delay. <br /> 1-09.11A(4)A1b No Material Variations <br /> ITo demonstrate the Contractor's Overhead costs did not materially vary from its <br /> usual seasonal Overhead costs during the period of Delay in accordance with <br /> item 4 of 1-09.11A(4)A1 of these Special Provisions, the Contractor shall; <br /> ' 1. Affirmatively represent and warrant that the completion of the subject <br /> Work was extended and that such extension prevented the performance <br /> of other work during both the period of Delay and the later period of time <br /> I <br /> required to complete the extended Work, <br /> 2. Disclose the details of Contractor generated billings and Contractor <br /> Overhead Costs, as defined in these Special Provisions, throughout the <br /> I actual Project performance. The details of such information should be <br /> no less than specific identification of the sources and amounts of <br /> revenue on no greater than a monthly basis and specific identification of <br /> I the types and amounts of Contractor Overhead Costs on no greater than <br /> a monthly basis for the actual Project duration. <br /> 1-09.11A(4)A1c Over-absorbed Overhead <br /> I To demonstrate that Contractor did not incur Over-absorbed Overhead in the <br /> period following the Delay, in accordance with item 5 of 1-09.11A(4)A1. of these <br /> Special Provisions, the Contractor shall: <br /> 1. Affirmatively represent and warrant that completion of the delayed Work <br /> prevented the performance of other Work; <br /> 2. Identify the critical resource unavailable for other Work due to completion <br /> of the delayed Contract; and <br /> I 3. Showing that unavailability of this critical resource precluded the <br /> performance of other Work. <br /> I SEI to SRI Intertie,SRO8 Rehab Division 1 -GENERAL REQUIREMENTS WO No.-UP3714 <br /> SP-117 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.