Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' 1-10.3(5) Construction Signs <br /> All signs required by the approved traffic control plan(s) as well as any other appropriate signs <br /> ' prescribed by the Engineer will be furnished by the Contractor and be paid under the item <br /> "Maintenance and Protection of Traffic Control." The Contractor shall erect them on posts or <br /> supports and maintain them in a clean, neat, and presentable condition until the necessity for <br /> ' them has ceased. All non-applicable signs shall be removed or covered with either metal or <br /> plywood during periods when they are not needed. When the need for any of these signs has <br /> ceased, the Contractor, upon approval of the Engineer, shall take down these signs, posts, or <br /> supports. All signs, posts, and supports shall be removed from the project and shall remain the <br /> ' property of the Contractor. <br /> There shall be no separate classification of signs. All construction signs,whether used throughout <br /> the construction, during a major phase of construction or removed daily shall be paid under the <br /> ' item "Maintenance and Protection of Traffic Control." Portable or temporary mountings may <br /> require added weight for stability. If it is necessary to add weight to the signs, only a bag of sand <br /> that will rupture on impact shall be used. The bag of sand shall have a maximum weight of 40 <br /> pounds and shall be suspended no more than 1-foot from the ground. <br /> The Work to provide the construction signing shall be: <br /> 1. Furnishing all construction signs. <br /> ' 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 3. Initial installation and subsequent removal of all construction signs. <br /> 4. Furnishing labor and materials for maintaining the signs in a clean and presentable <br /> condition; <br /> 5. All other incidentals necessary for providing the construction signs according to the <br /> approved traffic control plan(s). <br /> Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems to be <br /> unacceptable, while their use is required on the project, shall be replaced by the Contractor <br /> without additional compensation. <br /> 1-10.4 Measurement <br /> Delete 1-10.4 and substitute the following: <br /> ' 1-10.4 Measurement <br /> 1-10.4(1) General <br /> ' When the Bid Proposal does not include an item for any necessary traffic control, all costs for <br /> traffic control shall be included, by the Contractor, in the unit contract price for the various other <br /> items of Work in the Bid Proposal. The Contractor shall estimate these costs based on the <br /> contemplated work procedures. <br /> When traffic control items are included in the Bid Proposal, payment is limited to the following <br /> areas: <br /> The entire project area under the Contract and for a distance to include the initial warning signs <br /> for the beginning of the Project and the end of construction. Warning signs for side roads on the <br /> approved traffic control plan are also included. If the project consists of two or more sections, the <br /> limits will apply to each section individually. <br /> A detour provided in the Plans or approved by the Engineer for by-passing all or any portion of <br /> the construction, irrespective of whether or not the termini of the detour are within the limits of the <br /> Contract. <br /> ' SEI to SRI Intertie,SRO8 Rehab Division 1 —GENERAL REQUIREMENTS SP—123 WO No.—UP3714 <br />