My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' 8-31.3(8) Access Manhole Connection <br /> a. After sliplining is complete, re-establish access at manholes. When complete, liner shall <br /> ' extend to SR08 Overflow Structure and access cut in top of lining. <br /> b. Repair and grout invert between end of lining and Overflow Structure to provide a smooth <br /> transition between inlet and outlet and to prevent ponding. <br /> 8-31.3(9) Closeout <br /> a. Repair and grout invert between end of lining and Overflow Structure to provide a smooth <br /> ' transition <br /> b. Provide a Certificate of Proper Installation in accordance with Section 1-05 Control of <br /> Work. <br /> c. CCTV Video Inspection: To be perform on inserted liner, by the City. <br /> 1 8-31.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described in <br /> Division D-Bid Item Descriptions and Section 1-09 MEASUREMENT AND PAYMENT of the Standard <br /> Specifications. <br /> 8-31.5 Payment <br /> ' Payment for Bid items of Work completed pursuant to the Contract Documents will be as described in <br /> Division D- Bid Item Descriptions and Section 1-09 MEASUREMENT AND PAYMENT of the Standard <br /> Specifications. <br /> I <br /> SEI to SRI Intertie,SRO8 Rehab Division 8-MISC CONSTRUCTION WO No.-UP3714 <br /> SP-166 <br />
The URL can be used to link to this page
Your browser does not support the video tag.