My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> I EVERETT Public Works <br /> WASHINGTON <br /> ADDENDUM NO. 1 <br /> TO <br /> ' SEI TO SRI INTERTIE AND SR08 REHABILITATION <br /> W.O. # UP-3714 <br /> ' FEBRUARY 2, 2021 <br /> NOTICE TO PLANHOLDERS: <br /> 1 Addendum No. 1 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> ' considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 1 in the space provided on page SP-23 in <br /> Division C, CONTRACT, Proposal Signature Sheet. Failure to comply with this requirement may <br /> render the Bid non-responsive and may cause its rejection. <br /> This Addendum consists of 3 pages, including all revisions, and attachments. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> ' THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> ' SUPPLEMENTAL INFORMATION <br /> There is supplemental information available to bidders for this project located online. <br /> To obtain a link and credentials to access this information, contact: <br /> ' Sharonne Park, Bellevue Water Resources Group Leader at Jacobs, via email, <br /> sharonne.park@iacobs.com or via Phone: 206.300.5084. <br /> ' SPECIAL PROVISIONS: <br /> 1.2 Proposed Subcontractors Form, Section 1.2, Page SP-24, Replace page with <br /> the attached revised page SP-24. <br /> 1.07.1 Laws to be Observed, Page SP-75,Add 1.07.1(2) Covid 19 Requirements <br /> that reads as follows: <br /> ' 1-07.1(2) Covid 19 Requirements <br /> The Contractor shall be in compliance at all times with all legal and governmental <br /> requirements regarding COVID-19. Contractor's Bid includes all costs necessary for <br /> ' compliance with COVID-19 requirements. In no event will there be any adjustment to <br /> the Contract Sum for any direct or indirect costs caused by COVID-19 requirements. <br /> Addendum 1 Page 1 <br /> CITY of EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax(425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.