My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> CITY OF EVERETT, WASHINGTON <br /> CONTRACT <br /> THIS CONTRACT IS MADE AND ENTERED INTO THIS 3 SSt DAY OF f'1ARG\1 , 204 BY AND <br /> BETWEEN THE CITY OF EVERETT, WASHINGTON, A MUNICIPAL CORPORATION <br /> EXISTING UNDER THE LAWS OF THE STATE OF WASHINGTON, HEREINAFTER <br /> CALLED THE "CITY," AND <br /> LL1 ) CooS ( ‘) 101--1 ASSoC►PES I►- - , A <br /> (NASNINb-rur- C oP Q t01-� HEREINAFTER CALLED THE <br /> "CONTRACTOR." <br /> IN CONSIDERATION OF THE SUMS TO BE PAID TO IT BY THE CITY, CONTRACTOR HEREBY <br /> COVENANTS AND AGREES TO FURNISH ALL LABOR, TOOLS, MATERIALS, <br /> EQUIPMENT, AND SUPPLIES REQUIRED TO BUILD AND CONSTRUCT AND TO BUILD <br /> AND CONSTRUCT IN A WORKMANLIKE MANNER THE WORK, IMPROVEMENTS, AND <br /> APPURTENANCES IN ACCORDANCE WITH THE SPECIFICATIONS AND PLANS <br /> ENTITLED: "SEI TO SRI INTERTIE AND SRO8 REHABILITATION PROJECT" (THE <br /> "PROJECT"). <br /> ' 1. CONTRACT DOCUMENTS. THE FOLLOWING DOCUMENTS ("CONTRACT DOCUMENTS") ARE <br /> INCORPORATED BY REFERENCE AND ARE HEREBY MADE A PART OF THIS <br /> CONTRACT: <br /> A. Notice to Contractors <br /> B. Instructions to Bidders (if any) <br /> C. Washington State Department of Transportation Standard Specifications 2018 as modified by <br /> all amendments thereto as of the date of bid opening of this Project("Standard Specifications"). <br /> D. Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> F. Addenda (if any) <br /> ' G. Payment Bond and Performance Bond <br /> H. Contractor's Proposal/Bid (conformed copy dated D- �3- )-Ja+ ) <br /> I. All provisions required by law whether set forth and reproduced herein or not <br /> 2. TIME FOR COMPLETION. SUBSTANTIAL COMPLETION SHALL BE ACHIEVED WITHIN ONE <br /> HUNDRED AND TEN (110) WORKING DAYS OF THE EFFECTIVE DATE OF THE NOTICE <br /> TO PROCEED. PHYSICAL COMPLETION SHALL BE WITHIN TWENTY (20) WORKING <br /> DAYS OF THE ACTUAL DATE OF ISSUANCE OF SUBSTANTIAL COMPLETION. <br /> 3. LIQUIDATED DAMAGES. THE PARTIES AGREE THE CITY WILL SUFFER DAMAGE AND BE PUT <br /> TO ADDITIONAL EXPENSE IN THE EVENT THAT THE CONTRACTOR DOES NOT <br /> COMPLETE THE WORK IN ALL RESPECTS AND HAVE IT READY FOR USE BY THE <br /> SUBSTANTIAL COMPLETION DATE STATED. BECAUSE IT IS DIFFICULT TO <br /> ' ACCURATELY COMPUTE THE AMOUNT OF SUCH COSTS AND DAMAGES, THE <br /> CONTRACTOR HEREBY COVENANTS AND AGREES TO PAY TO THE CITY <br /> LIQUIDATED DAMAGES AS COMPUTED IN SECTION 1-08.9 OF THE STANDARD <br /> SPECIFICATIONS, FOR EACH AND EVERY WORKING DAY REQUIRED TO <br /> ACCOMPLISH SUBSTANTIAL COMPLETION OF THE WORK IN EXCESS OF THE <br /> PERIOD ESTABLISHED ABOVE FOR SUBSTANTIAL COMPLETION. FOR OVERRUNS <br /> IN CONTRACT TIME OCCURRING AFTER THE PHYSICAL COMPLETION DATE, <br /> SEI to SRI Intertie,SRO8 Rehab Division C-CONTRACT WO No.-UP3714 <br /> SP-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.