My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1.2 - PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) <br /> and electrical work (as defined by RCW Chap. 19.28), and structural steel installation and <br /> rebar installation, Bidder MUST either identify itself or Subcontractors in the chart below. <br /> If Bidder believes such work is not part of the scope of Work, Bidder shall write "NO <br /> WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, <br /> unless Subcontractors vary with bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> ' 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel <br /> installation and rebar installation, Bidder fails (1) to submit as part of the Bid the <br /> names of such Subcontractors, (2) to name itself to perform such Work, or (3) to <br /> write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation subcontractors <br /> applies only to proposed heating, ventilation and air conditioning, plumbing, electrical, <br /> structural steel installation and rebar installation subcontractors who will contract directly <br /> ' with the general contractor submitting the Bid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart <br /> ' below must be submitted with the bid proposal or within one hour of the published bid <br /> submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below must be <br /> ' submitted with the bid proposal or within forty-eight hours of the published bid submittal <br /> time. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> ' HEATING <br /> Subcontractor, bidder or"no work" MUST be <br /> stated <br /> ' VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work" MUST be <br /> stated <br /> PLUMBING (as described in RCW Chap. 18.106) <br /> Subcontractor, bidder or"no work" MUST be <br /> ' stated <br /> ELECTRICAL (as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or"no work" MUST be stated <br /> STRUCTURAL STEEL INSTALLATION <br /> ' Subcontractor, bidder or"no work" MUST be <br /> stated <br /> REBAR INSTALLATION <br /> ' Subcontractor, bidder or"no work" MUST be <br /> stated <br /> ' SEI to SRI Intertie,SRO8 Rehab Division C-CONTRACT WO No.-UP3714 <br /> SP-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.