My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Public Works <br /> WASHI NGTON <br /> ADDENDUM NO. 2 <br /> TO <br /> ' SEI TO SRI INTERTIE AND SRO8 REHABILITATION <br /> W.O. # UP-3714 <br /> ' FEBRUARY 19, 2021 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 2 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 2 in the space provided on page SP-23 in <br /> Division C, CONTRACT, Proposal Signature Sheet. Failure to comply with this requirement may <br /> ' render the Bid non-responsive and may cause its rejection. <br /> This Addendum consists of 2 pages, including all revisions, and attachments. <br /> ' The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> SPECIFICATIONS <br /> Section 9-05.13 Ductile Iron Sewer Pipe, Page SP-170, Add the following sentence <br /> at the end of this section: <br /> "Bolt hardware associated with the above listed restrained joint products should <br /> ' be 'standard steel' with wax tape coating per 9-30.2(12) at a minimum. Stainless <br /> steel bolt hardware is also acceptable and is required where specified." <br /> PLANS <br /> ' Drawing C2, Detail 1 Joint Bonding Detail, Add the following note 3: <br /> "Install a third jumper wire for the Bonding of Sleeve Couplers." <br /> Drawing C4, Detail 1 and Note 3, Add the following sentence to note 3: <br /> ' "Field applied sand collar shall consist of PVC glue or epoxy and sand or grit applied <br /> to the pipe surface that upon curing produces a bond and texture similar <br /> to commercially made sand collars. Assure that sand collar does not interfer <br /> ' with gasket travel zone if structure settles. PVC pipe may be any pipe class or DR <br /> for AWWA C900 or 905. " <br /> I <br /> Addendum 2 Page 1 <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425)257-8800• Fax(425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.