My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS FOR <br /> SEI TO SRI INTERTIE AND SRO8 REHABILITATION <br /> WO NO. - UP3714 <br /> ' NOTICE TO CONTRACTORS <br /> ADVERTISEMENT FOR BIDS <br /> Notice is hereby given that sealed bids for the SEI TO SRI INTERTIE AND SRO8 REHABILITATION <br /> project will be received at the Purchasing Counter, 3200 Cedar Street, Door#5, Everett, WA, 98201, <br /> ' until 2:00 p.m. on Tuesday, February 23, 2021. The Purchasing Counter is open Monday - Friday, from <br /> 8:00am -3:00pm. At the appointed time, all bids will be opened and read aloud publicly via webcast only. <br /> The link for the webcast is located at https//www.everettwa.gov/319/purchasing. The engineer's estimate <br /> for this Project is $1,400,000. <br /> Work being performed includes furnishing all labor, materials and equipment necessary to construct <br /> approximately 120 linear feet of 30" diameter ductile iron sanitary sewer pipe including fittings and valves, <br /> construction of a new saddle manhole on an existing 60" diameter sewer pipe, installing approximately 260 <br /> ' linear feet of 48" diameter HDPE pipe by slip-line methods, and other such appurtenances and performing <br /> all Work as required by the Contract, in accordance with the Contract Plans and Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located on 36th Street at Eclipse Mill Road and <br /> ' adjacent to the Snohomish River. <br /> Free-of-charge access to project bid documents (plans, specifications, link to supplemental information, <br /> addenda, and Bidders List) is provided to Prime Bidders, Subcontractors, and Vendors by going to <br /> ' www.bxwa.com and clicking on "Posted Projects", "Public Works", and "City of Everett". This online plan <br /> room provides Bidders with fully usable online documents with the ability to: download, view, print, order <br /> full/partial plan sets from numerous reprographic sources, and a free online digitizer/take-off tool. It is <br /> recommended that Bidders "Register" in order to receive automatic e-mail notification of future addenda <br /> ' and to place themselves on the "Self-Registered Bidders List". Bidders that do not register will not be <br /> automatically notified of addenda and will need to periodically check the on-line plan room for addenda <br /> issued on this project. Contact Builders Exchange of Washington at (425) 258-1303 should you require <br /> ' assistance with access or registration. <br /> All bids must be made upon the regular forms provided for this purpose and must be accompanied by a bid <br /> bond or certified check in an amount not less than five percent(5%) of the total amount of the Bid. <br /> ' The City reserves the right to reject any and all bids and to waive any irregularities or informalities. No <br /> Bidder may withdraw his Bid after the hour set for the opening thereof. The City further reserves the right <br /> to make the bid award as deemed in the best interest of the City. The right is reserved by the City to <br /> postpone the award for a period of forty-five (45) days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining <br /> to equal employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> I <br /> SEI to SRI Intertie, SR08 Rehab WO No.- UP3714 <br />
The URL can be used to link to this page
Your browser does not support the video tag.