Laserfiche WebLink
(E) T-MOBILE ANTENNA TO BE REMOVED m <br />(E) T-MOBILE ANTENNA TO REMAIN 1 . -Mobile . <br />(E) T-MOBILE FRIG MOUNTED BEHIND (E) (E) OTHER CARRIER TIP HEIGHT �) <br />(E) T-MOBILE COVP MOUNTED BEHIND ANTENNA TO REMAIN ANTENNA TO REMAIN <br />79.2' <br />(E) T-MOBILE DIPLEXERS (TYP OF 2) MOUNTED E PENTHOUSE ROOF HEIGHT <br />BEHIND ANTENNA TO REMAIN 64.7 <br />E T-MOBILE ANTENNA TIP HEIGHT <br />(E) T-MOBILE FXFB MOUNTED BEHIND ANTENNA TO REMAIN <br />63.7' <br />(E) T-MOBILE TMA, TYP. OF (2) TO BE �RELOCAC A SC A Di A P.MTED <br />T l r T E TOP OF PARAPET Precis on Program Nanagemc rc 57.0' <br />--- <br />-------------------------- � �--------------- (E) ROOF HEIGHT ry <br />< CENTERLINE <br />(E) T-MOBILE EQUIPMENT <br />PLATFORM BEYOND PENTHOUSEECTOR <br />kf <br />e n• I n e e R e <br />FEEF-1 <br />i I <br />GRADE 0'-0" AGL <br />1 I EXISTING NORTH ELEVATION (ALPHA SECTOR) SCALE: 1"= 20'-0"(1 1X17) 0' 10, 20' 40' I <br />SCALE: 1" = 10'-0" (22X34) <br />NOTES: <br />• IF REQUIRED, PAINT TO MATCH <br />ANTENNAS AND ANCILLARY EQUIPMENT <br />TO MATCH THE EXISTING STRUCTURE <br />WITH NON -REFLECTIVE PAINT AS REQ'D. <br />CONTRACTOR TO VERIFY COLOR AND <br />FINISH WITH LANDLORD AND/OR <br />JURISDICTION. <br />• PRIOR TO MATERIALS PROCUREMENT <br />CONTRACTOR SHALL FIELD VERIFY <br />CONDITION OF STRUCTURE AT <br />PROPOSED MOUNTING LOCATION TO <br />ENSURE EXISTING CONDITIONS ARE <br />SUITABLE AT SPECIFIED ELEVATION. <br />• NEW ANTENNAS SHALL NOT EXCEED <br />EXISTING TIP HEIGHT U.N.O. <br />• RETURN ALL USED EQUIPMENT AND <br />HARDWARE TO T-MOBILE WAREHOUSE. <br />• ALL CLIMBING PATHS ON <br />TOWER/MONOPOLE TO REMAIN FREE & <br />CLEAR OF MOUNTS, EQUIPMENT, ETC. <br />(N) T-MOBILE FRLB MOUNTED BEHIND ANTENNA ON (E) PIPE <br />MOUNT (ALPHA SECTOR ONLY, BETA/GAMMA SECTOR TO <br />BE MOUNTED ON INTERIOR OF BUILDING W/ OTHER (E) <br />EQUIP., TYP OF 1 PER SECTOR, TOTAL OF 3) <br />(E) T-MOBILE COVP MOUNTED BEHIND ANTENNA TO REMAIN <br />(E) T-MOBILE DIPLEXERS (TYP OF 2) MOUNTED <br />BEHIND ANTENNA TO REMAIN <br />(E) T-MOBILE FXFB MOUNTED BEHIND ANTENNA TO REMAIN <br />RELOCATED (E) T-MOBILE TMA, TYP. OF <br />(2) (BELOW (E) COVP AND (N) FRLB) <br />(N) T-MOBILE ANTENNA MOUNTED TO <br />(E) PIPE MOUNT <br />i n <br />(E) T-MOBILE ANTENNA TO REMAIN <br />2 I FINAL NORTH ELEVATION (ALPHA SECTOR) <br />T-MOBILE ANTENNA TIP HEIGHT <br />E OTHER CARRIER TIP HEIGHT <br />79.2' <br />PENTHOUSE ROOF <br />T-MOBILE ANTENNA TIP HEIGHT <br />63.7 <br />r r T T E TOP OF PARAPET <br />r9 r, I I I I 57.0' <br />(E) ROOF HEIGHT <br />-- -------------------- <br />55.0' <br />(E) T-MOBILE EQUIPMENT <br />PLATFORM BEYOND PENTHOUSE <br />GRADE 0'-0" AGL <br />SCALE: 1" = 20'-0" (11X17) 0' 10, 20' 40' <br />SCALE: 1" = 10'-0" (22X34) <br />CPM PROJECT NO.: 9362 <br />PRELIMINARY <br />NO. DATE D/C DESCRIPTION <br />0 10-29-15 MS/MS 90 % CD REVIEW <br />1 12-10-15 EG/EG CLIENT COMMENT <br />SUBMITTAL <br />NO. DATE D/C DESCRIPTION <br />0 12-17-15 EG/EG BP SUBMITTAL <br />1 12-28-15 MS/MSj CLIENT COMMENT <br />SITE NAME: <br />BROADWAY <br />EVERETT SNOPLID <br />SITE ID: <br />SE01511A <br />crrF AnnoFQQ" <br />LSLU UALIYUKNIA 61 <br />EVERETT, WA98201 <br />SHEET TITLE <br />NORTH <br />ELEVATIONS <br />SHEET NO. <br />A3.0 <br />