My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 CALIFORNIA ST T MOBILE ANTENNA 2022-01-25
>
Address Records
>
CALIFORNIA ST
>
2320
>
T MOBILE ANTENNA
>
2320 CALIFORNIA ST T MOBILE ANTENNA 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 11:50:54 AM
Creation date
4/30/2021 3:30:19 PM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
2320
Tenant Name
T MOBILE ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 • <br />� EG, ��1-20 1G 1 ¢,(WE%) 10.28 <br />T.H. REG-1 002,626 <br />Cl 1 <br />FE l}'I i r,s.lwta11J3 <br />EI/ ETT IBLDG. $321.2195 <br />(425) 257-8810 0 $4°50 <br />i F;/C $208.81 <br />Plan Check No.: B1601=D� <br />Application Date: 1/20/2016 <br />Tenant: PUD <br />Owner: PUBLIC UTILITY DIST 1 SNO CO <br />Job Address: 2320 CALIFORNIA &V51�—T <br />Proposed Use COMMERCIAL <br />Description of Work: MODIFY EXTG WIRELESS COMM <br />ROOFTOP FACILITY-T-MOBILE <br />Plan Check Fee Paid: $534.56 <br />The building permit application for the above -referenced project is being conditionally accepted for filing <br />pending the determination of its completeness. <br />If the City review determines that any additional land use approval or any additional information is <br />required to complete your building permit application, it will be necessary to submit this additional <br />information or acquire the additional land use approval prior to your application being considered complete <br />for filing. If no other land use approval or additional information is required, your building permit <br />application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br />will be calculated at permit issuance. <br />BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br />WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br />Signature <br />1-7(1- Zo/6 <br />Date <br />FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.