|
Intake & Approval Sheet 0 (FOR PERMIT STAFF ONLY) 0
<br />PERMIT ###��k0 -(��
<br />BUILDING
<br />Intake OK by: Date:
<br />Intake Comments:
<br />❑ Route to Commercial Building
<br />❑ Route to Residential Building
<br />❑ Make this a "W" Permit
<br />BI g/T ddn/Rem Size
<br />02 1-1
<br />Garage/Accessory Struct. Size
<br />Number of Stories
<br />Basement
<br />❑No ❑Yes , Fin / Unfin
<br />Type of Construction
<br />Occupancy Group
<br />Occupancy Load
<br />Fire Sprinklers: IYUpdate Existing ❑New System El Not Req'd
<br />Reason Sprinklers Required:
<br />Fire Alarm: El Update Existing El New System ❑Not Req'd
<br />Reason Fire Alarm Required:
<br />RCW 64.55 MF worksheet req'd for permit? ❑Yes �ffNo
<br />Add'I RCW 64.55 docs required prior to final? ❑Yels ❑ No
<br />VALUATION CALCULATION: Total $ ��
<br />Additional Notes:
<br />Approved By: Z_14_� Date: p�-i
<br />FIRE DEPARTMENT
<br />Separate / Deferred Submittals Required:
<br />��((
<br />Fire Sprinklers �F'ire Alarm ❑Other:
<br />Additional Notes:
<br />Fire Dept. Fees:
<br />❑ Review of As -Built Plans - NO FIRE FEE
<br />❑ Minimal or No Fire Scope - NO FIRE FEE
<br />Review / Inspection Scope - ADD FIRE FEE
<br />Approved By: c,(-N Date: 0 -1
<br />ELECTRICAL
<br />Additional Notes:
<br />Approved By: Date:
<br />PLANNING
<br />Intake OK by: Assign To:
<br />Intake Comments:
<br />❑ Attach to Project No.
<br />❑ Route to Historic Reviewer
<br />❑ OK to Route to Other Departments
<br />❑ Hold in Planning File Drawer
<br />Date:
<br />Zone
<br />-Z
<br />Overlay/Agreement
<br />Nonresidential Use
<br />Residential Use
<br />Proposed No. of Dwelling Units:
<br />Total No. of Dwelling Units:
<br />Planning/Landscape Inspection Required before Final? ❑Yes 5rNo
<br />"In Lieu" Fee: Type:
<br />Amount $
<br />School Impact Fee: Total $
<br />Calculated: CreSool
<br />El Everett School Dist ❑Mukilteo
<br />Dist
<br />Additional Notes:
<br />Approved By:
<br />Date: , , Cf„ Zp
<br />PUBLIC WORKS
<br />Intake OK by: Date:
<br />,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,
<br />Intake Comments: PW Worksheet Needed if. -
<br />Sys Dev Eva ❑Traffic Mit Eval
<br />[]Site Work or Drainage Proposed
<br />❑Backflow Prevention for high hazard:
<br />(dental, medical, animals, mortuary, hospital,
<br />:supportive housing)
<br />............................................................. ...................................................... ..............
<br />................................
<br />❑Route this folder for PW Review at end --- PW Review Worksheet
<br />❑This project also has a separate concurrent PW Review (Green Folder)
<br />AND ❑Create Green Folder ❑Submitted Previously ❑Deferred
<br />❑ This Permit is Approved by Public Works
<br />❑ See PW Review Worksheet and associated attached items
<br />❑ A Separate PW Permit is Required (Permit #: PW )
<br />AND ❑ Is located in this folder
<br />❑ Is in a Separate Green Folder (join with this folder for permit issuance)
<br />❑ Will be Issued separately (separate Green Folder, PW issued ahead of Bldg)
<br />i
<br />Public Works has no scope
<br />--- PW Not Required
<br />Additional Notes:
<br />Approved By: Date:
<br />Zl2-
<br />
|