My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 2ND FLOOR 2022-01-26
>
Address Records
>
COLBY AVE
>
1321
>
2ND FLOOR
>
1321 COLBY AVE 2ND FLOOR 2022-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 3:26:34 PM
Creation date
5/3/2021 8:56:52 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
2ND FLOOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROVIDENCE REGIONAL MEDICAL CENTER EVERETT <br />4A BEHAVIORAL HEALTH UNIT <br />Everett, Washington <br />1.4 <br />1.5 <br />1.6 <br />08 71 00 <br />DOOR HARDWARE <br />SUBMITTALS: <br />A. All submittals shall be in accordance with Section 01300. <br />B. Submit five (5) typewritten hardware schedules for approval. After approval, provide <br />required number of copies of the approved hardware schedule for distribution to other <br />trades. <br />Page 2 <br />C. Submit schedules in accordance to DHI publication on Sequence and Format for the <br />Hardware Schedule and include explanation of all abbreviations, symbols, and codes. <br />D. Include cross-reference to hardware groups in the hardware schedule. <br />E. Indicate type, style, function, size, hand, means of fastening and manufacturer for each <br />hardware item. <br />F. Mark openings with the Architect's numbering and indicate each door and frame: <br />Locations, sizes, material, hand, degree of opening, and fire rating. <br />G. Submit three (3) copies of catalog cuts for each hardware item listed in the schedule. <br />Catalog cuts must be of good reliable quality. Highlight each cut to readily show <br />compliance with the project's requirements. <br />H. Provide samples if required by the Architect. Samples will be returned to be incorporated <br />into the work. <br />Furnish a complete and current set of templates to all other related material suppliers. <br />QUALITY ASSURANCE: <br />A. Manufacturers and model numbers listed have been selected to establish a standard of <br />quality for this project. Only approved manufacturers and model numbers will be accepted. <br />B. Only recognized builders' hardware suppliers who have regularly engaged in furnishing <br />hardware in the project vicinity for a minimum of two (2) years will be acceptable. This <br />supplier must have in its employ an Architectural Hardware Consultant, who is available at <br />reasonable times, during the course of the work for consultation about the project's <br />hardware details, installation or adjustment. Suppliers without certified consultants may be <br />required to furnish a letter of qualification, listing similar projects furnished, including the <br />Architect's name, date and year, and the project's location. <br />C. Provide hardware for fire rated openings in compliance with NFPA - 80 2007 edition. <br />D. Products requiring electrical connections must be listed and classified by Underwriters <br />Laboratories. <br />DELIVERY, HANDLING, AND STORAGE: <br />A. Hardware shall be delivered to the project site in the manufacturer's original packaging, <br />marked with the door number it will be placed on. <br />B. Jointly inventory the hardware upon delivery with the Contractor and/or Installer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.