Laserfiche WebLink
NP... .. i W <br />DIRECTIONS: Read the WAC section below to determine if plan review is required or not required. Then select the box next to (a) to <br />tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br />required, select the box next to (b) and (c) to acknowledge that plan review is required and the electrical plans have been provided <br />with this permit application. <br />If item (a)-(ii, iii, or v) is selected, the work must also comply with section (a)-(vii). See arrow flow chart below. <br />rical plan review, <br />Y4ectrical plan review is not required for: <br />(i) Low voltage systems; <br />❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br />_❑ (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br />involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br />❑ (iv) Stand-alone utility fed services that do not exceed 250 volts, 400 amperes where the project's distribution system <br />does not include: <br />(A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br />(B) An essential electrical system defined in NEC 517.2; or <br />(C) A required fire pump system. <br />-❑ (v) Modifications to existing electrical installations where all of the following conditions are met: <br />(A) Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br />250 volts or for fighting circuits not exceeding 277 volts to ground; <br />(B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br />(C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br />and <br />(D) Service or feeder load calculations are increased by 5% or less. <br />❑ (vi) Electric power production source(s) such as solar photovoltaic, fuel cell, or wind electric system(s) with a total <br />rating of 9600 watts or less. <br />(vii) For installations in (a)(ii), (iii), and (v) of this subsection to be considered, the following must be available <br />to the electrical inspector before the work is initiated: <br />(A) A clear and adequate description of the project's scope; <br />(B) A load calculation(s); <br />(C) What the load changes are, providing both before and after panel schedules as needed; and <br />(D) Provide information showing that the service and feeder(s) supplying the panel(s) where the work is <br />taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br />for that supply. <br />NOTE: Electrical plan review is not required for "Medical, dental, and chiropractic clinic" of which is a clinic or <br />❑ physicians' office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br />(1)(c)(xii). <br />® (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br />occupancies defined in this chapter. <br />® (c) If a review is required, the electrical plan must be submitted for review and approval before the electrical work is begun. <br />Table goo-? <br />HeatEh,or P,ersonar Care Facilities <br />Health or Persgnal Carea.Fillty <br />TYF�" <br />Plan: Review <br />Required <br />ospital <br />Wes <br />�ur� n>'liome t nrt'brlonP.gterra <br />care 6nf <br />Yes <br />Boarding home <br />Yes <br />Ass Ste' livingfacI <br />Yes <br />Private :aicohol4srn nosplt2! <br />Yes <br />C:ivaCF.pS,1 ::; d;rlc Y,as i'ta1 <br />Yet <br />N ate.*r. ry home <br />Yes <br />Ambuiatory'su�ge,,y;faciiiti <br />Yes <br />Renal hem0d?26�sis clinic <br />Yes <br />fiesiaeriiiaf Lreafrneritfarii;'ry" <br />Yes <br />Enhancedservlcefk.'nty <br />Yes <br />A ult,re;icl-ntl,'rehabllitation <br />ceri.er <br />Yes <br />Table 9ti0 2 <br />Educational asid {nstituilorial F.a6l€ties Places of Asseritbly,.br Other'Facitides <br />@diicatidnaf institutionei or i~lat� PeviessF: <br />Dt}set Fac�Gty Types Required <br />£4gcationai ye <br />ihstltatienal Yes <br />I0te5,16:jables.4001'anc3; Wt 2_ <br />avttidrrredta'do t_lettritaf irspzctiori <br />rnayrequ€rt ;{ilan review on faclli`yt pes.r of <br />revie> ed;oyi�retl.epor.tmepf. <br />PERMIT # Page 2-P)an Review <br />