Laserfiche WebLink
Intake & Approval Sheet <br />(FOR PERMIT STAFF ONLr <br />0 <br />PERMIT #� <br />BUILDING <br />Intake OK by: Date: 7/ <br />Intake Comments. <br />❑ Route.to Commercial Building <br />❑ Route to Residential Building <br />❑ Make this a "W" Permit <br />BIdg/TI/A / em Si <br />2 9`7J SF <br />Garage/Accessory Struct. Size <br />Number of Stories <br />Basement <br />[]No ❑Yes , Fin / Unfin <br />Type of Construction <br />Occupancy Group' <br />Occupancy Load <br />30 <br />Fire Sprinklers: DRUpdate Existing ❑New System ❑Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ,Update Existing ❑New System ❑Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes Ea No <br />Add'I RCW 64.55 docs required prior to final? ❑Yes ONo <br />VALUATION CALCULATION: Total $ O-, -0 bb, D <br />Additional Notes: <br />Approved Date: <br />u <br />FIRE DEPARTMENT , <br />Separate / De ed Submittals Required: <br />❑Fire Sprinklers Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees: <br />❑❑ Review of As -Built Plans - N\FIRE <br />Minimal or No Fire Scope - N <br />❑ Review / ` `ection Scope - E <br />Approved B Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Date: <br />Intake Comments: Assign To: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />❑ OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone - <br />e�-Z r <br />Overlay/Agreement <br />I <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes No <br />"In Lieu" Fee: Type: Amount $ <br />School Impact Fee: Total $ <br />Calculated: Credit: <br />❑Everett School Dist ❑Mukilteo School Dist <br />Additional Notes: l�or �O(�( on- nv �c"vim <br />CW�S �2.%� Wi {�zrrn <br />Date: <br />Approved By: =W21 <br />PUBLIC WORKS <br />Intake OK by: Date: <br />------------------------------------------ <br />Intake Comments: ;PW Worksheet Needed if., <br />❑Sys Dev Eval ❑Traffic Mit Eval <br />[]Site Work or Drainage Proposed <br />❑Backflow Prevention for high hazard: <br />(dental, medical, animals, mortuary, hospital, <br />;supportive housing) <br />--_-------------------------- <br />El Route this folder for PW Review at end --- PW Review Worksheet <br />❑This project also has a separate concurrent PW Review (Green Folder) <br />AND ❑Create Green Folder [Submitted Previously ❑Deferred <br />❑ This Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder Qoin with this folder for permit issuance) <br />❑ WIII be issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />1P Public Works has no scope --- PW Not Required <br />Additional Notes: <br />Approved By: Date: <br />