My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4020 COLBY AVE 2022-01-27
>
Address Records
>
COLBY AVE
>
4020
>
4020 COLBY AVE 2022-01-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 11:05:41 AM
Creation date
5/3/2021 9:40:49 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/14/2020 <br />8:19:t5AM City of Everett <br />INSPECTION ACTIVITY REPORT <br />Permit No. B2002-027 Site Address 4020 COLBY AVE <br />Applied 2/20/2020 Applicant Lot <br />Approved 4/14/2020 Owner RJCMM ENTERPRISES LLC Block <br />Issued 6/26/2020 Contractor DB GENERAL CONTRACTORS INC Tract <br />Parent Permit No. Description INTERIOR TENANT IMPROVEMENT - NEW FLOORS, FINISH <br />Notes MENU BOARDS, FRONT COUNTER, SELF SERVE KIOSKS <br />Page 1 /2 <br />Scheduled ComDleted Tune Inspector Result Remarks Inspector's Comments <br />7/22/2020 Any 7/22/2020 BLDG KMK CORRECTION see notes 7/20/2020 3:24 PM Daniel Sher <br />08-FRAMING If possible can we please get an AM <br />inspection. Thank you. <br />Contact Name: Daniel Sher <br />Site Address: 4020 COLBY AVE <br />Phone:2538764319 <br />e-Mail: Daniels@db-gc.com <br />Kevin Ezell <br />206-459-8615(Canceled - eTRAKiT - <br />7/20/2020 2:01:12 PM) <br />7/23/2020 7/23/2020 <br />8/5/2020 8/5/2020 <br />8/6/2020 8/6/2020 <br />BLDG KMK <br />08-FRAMING <br />BLDG 12-CEILING KMK <br />GRID <br />BLDG 15-FINAL KMK <br />(7/21/2020 12:30 PM KMK) <br />contractor would like inspection 7/22 <br />(7/22/2020 6:42 PM KMK) <br />Obtain rough -in inspections and approvals <br />for mechanical and electrical <br />PARTIAL APPR see notes (7/23/2020 7:51 AM KMK) <br />Framing ok as noted: <br />Obtain mechanical roughin inspection <br />before cover. <br />(7/24/2020 8:05 AM KMK) <br />Mechanical and plumbing in the restrooms <br />is existing. <br />OTHER See notes 8/4/2020 7:29 PM Daniel Sher <br />Electrical Cover inspection is called for <br />tomorrow AM. Can we please get an AM <br />inspection so that we can start dropping tile. <br />Thank you and much appreciated. <br />Contact Name: Daniel Sher <br />Site Address: 4020 COLBY AVE <br />Phone:2538764319 <br />e-Mail: Daniels@db-gc.com <br />CORRECTION see notes <br />(8/5/2020 2:02 PM KMK) <br />please work with your electrical inspector <br />and complete corrections before cover. <br />Grid ok. <br />8/4/2020 7:35 PM Daniel Sher <br />If possible can we please get an AM <br />inspection. <br />Contact Name: Daniel Sher <br />Site Address: 4020 COLBY AVE <br />Phone:2538764319 <br />e-Mail: Daniels@db-gc.com <br />(8/6/2020 5:40 PM KMK) <br />See correction 8/5 KMK <br />INSP12 CRWSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.