Laserfiche WebLink
8/5/2020 City of Everett <br />1:30:24PM <br />INSPECTION ACTIVITY REPORT <br />Permit No. M2006-071 Site Address 4310 COLBY AVE #301 <br />Applied 6/30/2020 Applicant Brad Decker Lot <br />Approved 7/l/2020 Owner MATANA LLC Block <br />Issued 7/l/2020 Contractor OWNER Tract <br />Parent Permit No. B2004-030 Description Install 2 new Bathroom Fans <br />Notes Install 2 new Bathroom Fans Part of Building Permit B2004-030 <br />Page 1 <br />Scheduled Completed <br />Type <br />Inspector <br />Result <br />Remarks <br />Inspector's Comments <br />7/16/2020 7/16/2020 <br />MECH 06-FINAL <br />SDP <br />CORRECTION <br />eTRAKiT Inspection <br />7/15/2020 1:46 PM Brad Decker <br />Request <br />Morning - Final 2 bathroom fans <br />Contact Name: Brad Decker <br />Site Address: 4310 COLBY AVE #301 <br />Phone:2065454964 <br />e-Mail: brad@seattleretail.net <br />(7/17/2020 7:34 AM SDP) <br />1) Use only UL 181 tape and mastics <br />2) Use a 6x4x4 wye to connect the two <br />exhaust fans. <br />3) Finish all ducting before calling for <br />inspection. <br />4) Contact the electrical inspector to discuss <br />access requirements for the HVAC <br />equipment <br />7/20/2020 7/21/2020 <br />MECH 04-ROUGH <br />SDP <br />APPROVAL <br />eTRAKiT Inspection <br />7/17/2020 12:45 PM Brad Decker <br />IN <br />Request <br />Morning inspection Please <br />Contact Name: Brad Decker <br />Site Address: 4310 COLBY AVE #301 <br />Phone:2065454964 <br />e-Mail: brad@seattleretail.net <br />(7/21/2020 5:31 PM SDP) <br />Approved pending approval from the <br />electrical inspector concerning the service <br />access of the air handling unit that sits over <br />the newly constructed wall. <br />7/28/2020 7/28/2020 <br />MECH 06-FINAL <br />SDP <br />APPROVAL <br />eTRAKiT Inspection <br />7/27/2020 1:08 PM Brad Decker <br />Request <br />Morning Inspection Please <br />Contact Name: Brad Decker <br />Site Address: 4310 COLBY AVE #301 <br />Phone:2062261700 <br />e-Mail: brad@seattleretail.net <br />(7/28/2020 10:05 AM SDP) <br />Pending electrical final ( working remotely <br />and cannot see electrical inspection results). <br />After electrical approval this permit is <br />finaled. <br />7/28/2020 7/28/2020 <br />ELEC 09-FINAL <br />SDP <br />OTHER <br />(7/28/2020 10:05 AM SDP) <br />Test - disregard <br />8/4/2020 8/4/2020 <br />ADMIN USE <br />KLC <br />APPROVAL <br />Per SP s notes <br />ONLY" <br />7/28/2020 <br />INSP12 <br />CRWsYSTEMS <br />