My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 HARRISON AVE 2022-02-11
>
Address Records
>
HARRISON AVE
>
2602
>
2602 HARRISON AVE 2022-02-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:22:01 AM
Creation date
5/3/2021 1:07:55 PM
Metadata
Fields
Template:
Address Document
Street Name
HARRISON AVE
Street Number
2602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/29/2021 City of Everett Page 1 <br />10:41:53AM <br />INSPECTION ACTIVITY REPORT <br />Permit No. E2002-208 Site Address 2602 HARRISON AVE <br />Applied 2/26/2020 Applicant SMART ENERGY TODAY INC (ELEC) Lot <br />Approved 2/27/2020 Owner CULL MICHAEL/CANDACE Block <br />Issued 2/27/2020 Contractor SMART ENERGY TODAY INC (ELEC) Tract <br />Parent Permit No. B2002-044 Description CIRCUIT 3.72 KW ROOFTOP SOLAR <br />Notes 12 AXITEC AC310MH, 1 SOLAREDGE SE3800 INVERTER <br />Scheduled Completed TVDe Inspector Result Remarks Inspector's Comments <br />5/4/2020 5/4/2020 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 5/l/2020 12:41 PM SMART ENERGY <br />Request TODAY INC (ELEC) <br />Everything is outside and is happening <br />along side of permit <br />B2002-044 <br />Contact Name: Michael Cull <br />Site Address: 2602 Harrison Ave, Everett, <br />Washington 98201 <br />Phone:4253081241 <br />e-Mail: Hector.f@smartenergytoday.net <br />6/25/2020 6/25/2020 ELEC 09-FINAL SKB NOT READY eTRAKiT Inspection <br />Request <br />12/8/2020 12/8/2020 PERMIT KLC EXTENSION A COVID <br />EXTENSION EXTENSION <br />3/26/2021 3/26/2021 ELEC 09-FINAL SKB APPRVD-PERK eTRAKiT Inspection <br />Request <br />3/26/2021 <br />3/26/2021 ELEC 05-SERVICE SKB APPROVAL <br />(5/4/2020 1:46 PM SKB) <br />Either wire to the one line diagram or <br />provide a new one line diagram. Grounding <br />electrode conductor's must be properly <br />terminated on ground rods the connecter <br />must pinch the wire, the bolt cannot screw <br />in to the conductor but into the rods. The <br />backfeed main breaker in the garage must <br />be tied down. Unused knockouts must be <br />sealed in the main panel. Make sure all <br />warning labels are installed. <br />6/23/2020 9:18 AM SMART ENERGY <br />TODAY INC (ELEC) <br />This would be happening at the same time <br />as a building inspection B2005-032 <br />Contact Name: Richard VanTassel <br />Site Address: 603 100 PL SE, Everett, <br />Washington <br />Phone:4252205605 <br />e-Mail: spiritofcourse@gmail.com <br />(6/25/2020 11:53 AM SKB) <br />Previous corrections not completed. <br />3/25/2021 2:28 PM SMART ENERGY <br />TODAY INC (ELEC) <br />Corrections completed customer will have <br />printed does customer will be home all day <br />Building will happen the same day <br />B2002-044 <br />Contact Name: Michael Cull <br />Site Address: 2602 Harrison Ave, <br />Washington 98201 <br />Phone:4253081241 <br />e-Mail: Hector.f@smartenergytoday.net <br />(3/26/2021 10:37 AM SKB) <br />Panel change only. <br />INSP12 <br />Cll %SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.