Laserfiche WebLink
Marketer/Dealer: ROHEEN LLC Created by: L. Abramov Scale: N/A Page#: 4 OF 6 <br />® DISPENSER VISUALS Site Name: ROHEEN LLC <br />16.0" <br />varies <br />10'-c:• <br />Painted cc lumps <br />76 Titanium gray <br />of <br />Column sue �may va rf site to site <br />l -'-Pump number <br />blade sign - needs to be <br />- - positioned an pole so customer <br />and stare employee can see R <br />Distance will vary <br />from <br />valance to column - <br />'leld measure distance <br />prior to fabrication <br />to ensure valance writ <br />r, 'it pre perlp <br />I I <br />' I I <br />�I ®@ a <br />i a <br />� '.9ii11 <br />1 Au�uu�_ <br />A Typical Pump Island Elevation <br />SCALE <br />76 Crest brings a bright new appearance to the fueling area that compliments the Main ID sign <br />(MID) and canopy image.There are several elements of the fuel islands that are required for 76 <br />Crest standard image package as shown below. <br />All dispensers must comply with the "minimum site requirements" as detailed on BizLink. For <br />example this includes that pumps must have Card Reader in Dispenser (CRINDS) and remain <br />clean and free of unprofessional discretionary signage. These requirements are regularly <br />measured as part of the Mystery Shop program. <br />dance <br />-- - - = - Aluminum decorated valance. NI valances have rounded <br />°' '' corners. No square comers are permitted on the valance. <br />y-- `"-- Follow visual graphics as defined in visual standards. <br />zT- _ Approved 76 supplier has complete art work for all <br />valance sizes to fit all dispensers. <br />Race Sa!etry decal an bvh <br />OiMdopanalsa!NIPOriser <br />@Pump Topper Frame <br />Pump toppers are horizontally centered in between the <br />Aluminum valance <br />painted slyer metallic <br />U rl <br />pumps uprights. <br />with vinyl dot application <br />@ Safety Decal <br />Dispenser and <br />The Consolidated Safety Decal is a brand requirement. <br />valance ons er varies <br />see di sponsor <br />It contains the latest API and NFPA recommended <br />drawings far details <br />safety notices. Mounted to bathe inside faces of risers. <br />P orange bollards <br />76 or <br />@ Dispensers <br />Asa <br />See dispenser detail in the "76 Crest Forecourt Image <br />Other acceptable <br />Standards section of this document' gray poly Garb <br />candtaan is stainless <br />overlays are applied to the bezel area of dispenser. <br />steer ballards <br />This is part of the new reimage program. <br />Paint Island farm <br />dark gun metal gray <br />4903 Use approved amenity - <br />unit. Amenity unit not <br />part of reimage package <br />@ Pump Number Blade sign <br />Should be visible for both the consumer and CStore. <br />Flag signs are mounted on the canopy columns. <br />Decals are installed on dispenser bezels. <br />7O Canopy Columns <br />Should have a clean and uncluttered appearance. <br />Columns should be cleaned repaired if needed, <br />primed and painted with approved color. <br />May not be used to post prices or advertising. <br />Columns that are unpainted brick or natural stone <br />will be excused from the 76 column color and <br />does not need a required exception. All other <br />canopy column materials will be imaged to 76 <br />Titanium gray or must be approved through the <br />exception process. <br />Painting instructions: <br />Paint column 76 Titanium gray from bottom of <br />column to roof deck of canopy. <br />@Curbs, Island Forn Is & Bollards <br />All bollards in the fueling area will be painted 76 <br />orange or leave if stainless steel. <br />Island forrns are painted Dark Gun Metal Gray. <br />Natural concrete and stainless steel are <br />acceptable substitutes to painting. <br />Horizontal surface of the island must be natural <br />concrete [preferred) or paint Dark Gun <br />Metal Gray or can be tiled (natural stone). <br />6@Amenity Units Bollards outside the fueling area are painted a <br />Use approved amenity units. Should be located near consistent color. Color may match 76 fuel image <br />each dispenser_ May be charcoal, gray, or dark gray- or building image, as desired. No stripes. <br />There is an approved Column mounted windshield For curbs outside the fueling area natural concrete <br />bucket available. New amenity units are not part of is preferred to paint. If panted apply Dark Gun <br />the 76 Crest reimage package. Metal Gray. <br />REVISION # DATE TYPE OF CHANGE SHIP TO#: 895299 <br />ORIGINAL 08.07.2020 <br />R1 08.27.2020 MID revision <br />R2 10,30.2020 Canopy and MID revisions <br />R3 11.02,2020 Logo revisions <br />CITY 0� �` EI�E�` <br />REVIEWED FOR PERMIT <br />This document reflects trade secrets and confidential business information. <br />It may not be copied, published or disseminated in any manner without the wrinen approval of Big Red Rooster Flow. <br />All rights reserved, including patent, trademark and copyrights. <br />BIG RED ROOSTER FLOW <br />2 Northfield Plaza, Ste 250, Northfield, IL 60093 <br />P: (847) 441-1818 F: (847) 592-9564 <br />41(P <br />